期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
论应用写作教学中的病文分析法 被引量:4
1
作者 舒江霞 《江汉石油职工大学学报》 2002年第2期14-16,共3页
病文分析法符合学员认识规律 ,可极大地引起学员学习兴趣 ,利于强化学员的应用文写作能力 ,提高应用写作课程的教学效果。病文可以来源于社会、学员习作和教师的编制。实施病文分析法 ,方式方法要多样 ,病文本身和实施对象要有针对性 ,... 病文分析法符合学员认识规律 ,可极大地引起学员学习兴趣 ,利于强化学员的应用文写作能力 ,提高应用写作课程的教学效果。病文可以来源于社会、学员习作和教师的编制。实施病文分析法 ,方式方法要多样 ,病文本身和实施对象要有针对性 ,应以熟练掌握应用文写作要领和注重事项为前提。 展开更多
关键词 病文分析法 应用写作 教学方 写作能力 学习兴趣
下载PDF
Safety of Dams: A Pathological Approach of Qualitative and Quantitative Risks
2
作者 Flavio Augusto Settimi Sohler Laura Maria Mello Saraiva Caldeira 《Journal of Civil Engineering and Architecture》 2016年第9期1032-1051,共20页
Dams are critical and essential elements in any infrastructure and, in front of accidents occurred in many countries, it is extremely important to know the risk of these structures. Inserted in this context, it was fo... Dams are critical and essential elements in any infrastructure and, in front of accidents occurred in many countries, it is extremely important to know the risk of these structures. Inserted in this context, it was found in the technical literature, methods and tools capable of measuring the exposure value by means of indicators. In the study, the highlights were 12 methods of qualitative, semiquantitative and quantitative risk analysis, representing an overview of risk analysis methods available in the literature with potential use in dams, that it has been done into electronic spreadsheets. The case study is performed on a sample of concrete dam and earth/rockfill built and operated by Eletrobr^s Furnas Company, supported by documentary research, projects, field inspections and interviews with experts. After applying the methods and the analysis thereof, has been prepared the Eletrobras Fumas dam risk analysis method which is characterized by adapting the criteria analyzed to the reality of the company's dams and it was also performed the portfolio risk analysis of 18 dams. In spite of the variety and subjectivity of qualitative and semiquantitative methods, the results show that they tend to converge on the analysis of dam based on risk. The application methodology demonstrates the feasibility assessment stage, covering the preliminary analysis for portfolio dams, followed by formal and individual risk analyzes for the most critical structures. These results confirm the applicability of risk analysis techniques, contributing to the consolidation of this toot as fundamental in the dam safety. 展开更多
关键词 Dam safety dams breaks methods and tools for risk analysis risk analysis in dam portfolio.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部