Landslides have occurred frequently in the Luoshan mining area because of disordered mining.This paper discusses the landforms and physiognomy,hydro-meteorology,formation lithology,and geologic structure of the Luosha...Landslides have occurred frequently in the Luoshan mining area because of disordered mining.This paper discusses the landforms and physiognomy,hydro-meteorology,formation lithology,and geologic structure of the Luoshan mining area.It also describes the factors influencing the slope stability of landslide No.Ⅲ,determines the general parameters and typical section plane,analyzes the stress-strain state of the No.Ⅲ slope,and calculates its safety factors with FLAC3 D under saturated and natural conditions.Based on a stability analysis,a remote real-time monitoring system was applied to the No.Ⅲ slope,and these monitoring data were collected and analyzed.展开更多
In order to improve the intelligence of video monitoring system of belt and make up the deficiency of higher failure rate and bad real-time performance in the traditional systems of measurement of belt speed, accordin...In order to improve the intelligence of video monitoring system of belt and make up the deficiency of higher failure rate and bad real-time performance in the traditional systems of measurement of belt speed, according to the fact that the light of coal mine is uneven, the strength of light changes greatly, the direction of belt movement is constant, and the position of camera was fixed, various algorithms of speed measurement by video were studied, and algorithm for template matching based on sum of absolute differences (SAD) and correlation coefficient was proposed and improved, besides, the tracking of feature regions was realized. Then, a camera calibration method using the invariance of the cross-ratio was adopted and the real-time measurement of belt speed by the hardware platform based on DM642 was realized. Finally, experiment results show that this method not only has advantages of high precision and strong anti-jamming capability but also can real-time reflect the changes of belt speed, so it has a comprehensive applicability.展开更多
文摘Landslides have occurred frequently in the Luoshan mining area because of disordered mining.This paper discusses the landforms and physiognomy,hydro-meteorology,formation lithology,and geologic structure of the Luoshan mining area.It also describes the factors influencing the slope stability of landslide No.Ⅲ,determines the general parameters and typical section plane,analyzes the stress-strain state of the No.Ⅲ slope,and calculates its safety factors with FLAC3 D under saturated and natural conditions.Based on a stability analysis,a remote real-time monitoring system was applied to the No.Ⅲ slope,and these monitoring data were collected and analyzed.
文摘In order to improve the intelligence of video monitoring system of belt and make up the deficiency of higher failure rate and bad real-time performance in the traditional systems of measurement of belt speed, according to the fact that the light of coal mine is uneven, the strength of light changes greatly, the direction of belt movement is constant, and the position of camera was fixed, various algorithms of speed measurement by video were studied, and algorithm for template matching based on sum of absolute differences (SAD) and correlation coefficient was proposed and improved, besides, the tracking of feature regions was realized. Then, a camera calibration method using the invariance of the cross-ratio was adopted and the real-time measurement of belt speed by the hardware platform based on DM642 was realized. Finally, experiment results show that this method not only has advantages of high precision and strong anti-jamming capability but also can real-time reflect the changes of belt speed, so it has a comprehensive applicability.