期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Activities of Urease and Phosphatase in Integrated Vertical Flow Constructed Wetland and Purification Effect of Black and Malodorous River 被引量:3
1
作者 崔伟 张勇 黄民生 《Agricultural Science & Technology》 CAS 2011年第8期1186-1190,共5页
[Objective]The activities of urease and phosphatase in integrated vertical flow constructed wetland and purification effect of black and malodorous river were studied.[Method]Honeycomb stone and soft filler were used ... [Objective]The activities of urease and phosphatase in integrated vertical flow constructed wetland and purification effect of black and malodorous river were studied.[Method]Honeycomb stone and soft filler were used as matrix,the biological grid integrated vertical flow constructed wetland system was built to strengthen treatment for black and malodorous river,and the activities of urease and phosphatase of two fillers in different functional areas of constructed wetland were tested to study the film formation property of two fillers in different functional areas.[Result]Both urease and phosphatase activities on biofilm of soft filler were significantly higher than on biofilm of honeycomb stone filler;indicating that choosing soft filler was more advantageous to the growth of biofilm;and urease activity had significant correlation with total nitrogen removal rate,while phosphatase activity had no significant correlation with total phosphorus removal rate.[Conclusion]This study provided evidences for utilizing the activities of urease and phosphatase to evaluate the purification effect of black and malodorous river and choose appropriate filler. 展开更多
关键词 Integrated vertical flow constructed wetland UREASE PHOSPHATASE Black and malodorous river Purification effect
下载PDF
Effects of Hydraulic Loading of Vertical Flow Constructed Wetland Clogging 被引量:1
2
作者 王小毛 许巧玲 +1 位作者 崔理华 李国婉 《Agricultural Science & Technology》 CAS 2014年第11期2030-2034,共5页
[Objective] The aim was to al eviate the constructed wetland clogging problems and to explore to the effects of hydraulic loading on wetland clogging. [Method] The experiment, through artificial soil columns, simulate... [Objective] The aim was to al eviate the constructed wetland clogging problems and to explore to the effects of hydraulic loading on wetland clogging. [Method] The experiment, through artificial soil columns, simulated vertical flow arti-ficial wetland, set four hydraulic load level at 50, 100, 150 and 200 cm/d, to identify the impact of hydraulic loading on wetland clogging and to explore the factors run-ning threshold. [Result] The results show that the different levels of hydraulic loading have greater impact; in the constructed wetland clogging process under high hy-draulic loading of 200 cm/d, the effective life was only six months, and the single factor can be speculated that the threshold of the hydraulic load should be at 100-150 cm/d; system can last for six months at low hydraulic loading and last for three months at medium hydraulic load. [Conclusion] The research provides references for wetland clogging experiments in future. 展开更多
关键词 Vertical flow constructed wetlands Clogging Hydraulic loading Threshold
下载PDF
一种通过液位仪精确计量水位及循环以治理水质的设计
3
作者 房磊 广浩 张慧超 《计量技术》 2019年第8期64-66,共3页
以一个现有人工景观湖的治理为实例,为了使湖水水质得到净化,设计了直流人工湿地与水循环并用的方法来净化水质.一方面通过液位仪精确计量、控制新水补充量和旧水排出量;另一方面在湖边设置直流人工湿地对水质进行循环净化处理.这样既... 以一个现有人工景观湖的治理为实例,为了使湖水水质得到净化,设计了直流人工湿地与水循环并用的方法来净化水质.一方面通过液位仪精确计量、控制新水补充量和旧水排出量;另一方面在湖边设置直流人工湿地对水质进行循环净化处理.这样既达到了对湖水进行循环净化的目的,同时也将富含各种微生物的水体进行了灌溉处理,维持了水系净化的可持续性.此系统的完成,对以后的改造具有借鉴意义. 展开更多
关键词 水质治理 直流人工湿地 水循环 景观湖水治理
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部