期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
盾构冷冻管路设计及冻结、开舱温度场分析
1
作者 徐沣 于斐然 孙绍哲 《建设机械技术与管理》 2022年第3期38-41,共4页
以沈阳地铁4号线沈阳北站~皇寺广场站地铁施工穿越站台桩基为背景,在盾构连续穿越桩基且无地面加固条件下,采用盾构冷冻作为截桩过程中的开舱换刀加固措施。本文通过盾构冷冻的管路布局及冻结、开舱两种情况下的温度场分析,为盾构冷冻... 以沈阳地铁4号线沈阳北站~皇寺广场站地铁施工穿越站台桩基为背景,在盾构连续穿越桩基且无地面加固条件下,采用盾构冷冻作为截桩过程中的开舱换刀加固措施。本文通过盾构冷冻的管路布局及冻结、开舱两种情况下的温度场分析,为盾构冷冻提供详细设计方案。盾构冷冻技术在不具备地面加固条件的工况下,可为开舱换刀提供保障,在盾内实施紧急加固方面具有良好的应用前景。 展开更多
关键词 盾构冷冻 冷冻管路 冻结温度场 开舱温度场
下载PDF
Numerical simulation of freezing effect and tool change of shield machine with a frozen cutterhead 被引量:6
2
作者 DAI Wei XIA Yi-min +1 位作者 XU Hai-liang YANG Mei 《Journal of Central South University》 SCIE EI CAS CSCD 2020年第4期1262-1272,共11页
A shield machine with freezing function is proposed in order to realize tool change operation at atmospheric pressure. Furthermore, the transformation project of freezing cutterhead and tool change maintenance method ... A shield machine with freezing function is proposed in order to realize tool change operation at atmospheric pressure. Furthermore, the transformation project of freezing cutterhead and tool change maintenance method are put forward. Taking the shield construction of Huanxi Power Tunnel as an example, a numerical analysis of the freezing cutter head of the project was carried out. The results show that when the brine temperature is-25 °C, after 30 d of freezing, the thickness of the frozen wall can reach 0.67 m and the average temperature drops to-9.9 °C. When the brine temperature is-30 °C, after 50 d of freezing, the thickness of the frozen wall can reach 1.01 m and the average temperature drops to-12.4 °C. If the thickness of the frozen wall is 0.5 m and the average temperature is-10 °C, as the design index of the frozen wall, the brine temperature should be lower than-28 °C to meet the excavation requirements in 30 d. Analyzing the frozen wall stress under 0.5 m thickness and-10 °C average temperature condition, the tensile safety factor and compressive safety factor are both greater than 2 at the most dangerous position, which can meet the tool change requirements for shield construction. 展开更多
关键词 shield machine CONSTRUCTION frozen cutterhead tool change maintenance finite element simulation
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部