To protect trains against strong cross-wind along Qinghai-Tibet railway, a strong wind speed monitoring and warning system was developed. And to obtain high-precision wind speed short-term forecasting values for the s...To protect trains against strong cross-wind along Qinghai-Tibet railway, a strong wind speed monitoring and warning system was developed. And to obtain high-precision wind speed short-term forecasting values for the system to make more accurate scheduling decision, two optimization algorithms were proposed. Using them to make calculative examples for actual wind speed time series from the 18th meteorological station, the results show that: the optimization algorithm based on wavelet analysis method and improved time series analysis method can attain high-precision multi-step forecasting values, the mean relative errors of one-step, three-step, five-step and ten-step forecasting are only 0.30%, 0.75%, 1.15% and 1.65%, respectively. The optimization algorithm based on wavelet analysis method and Kalman time series analysis method can obtain high-precision one-step forecasting values, the mean relative error of one-step forecasting is reduced by 61.67% to 0.115%. The two optimization algorithms both maintain the modeling simple character, and can attain prediction explicit equations after modeling calculation.展开更多
Short circuit and ground failures that are quite common in power transmission lines are investigated. These failures are designed considering a system that is supplied by this wind system, and analyses are interpreted...Short circuit and ground failures that are quite common in power transmission lines are investigated. These failures are designed considering a system that is supplied by this wind system, and analyses are interpreted. In the study, a system is set up and it is fed by the wind turbine. Furthermore, the mathematical model of wind turbine and generator is prepared and the results obtained from the simulation are evaluated. The short circuit and ground fault analyzes were performed separately for each of the three phases. ATP (alternative transient program)-EMTP (electromagnetic transients program) program is used in the analysis and the results obtained were found to be quite compatible.展开更多
基金Project(2006BAC07B03) supported by the National Key Technology R & D Program of ChinaProject(2006G040-A) supported by the Foundation of the Science and Technology Section of Ministry of RailwayProject(2008yb044) supported by the Foundation of Excellent Doctoral Dissertation of Central South University
文摘To protect trains against strong cross-wind along Qinghai-Tibet railway, a strong wind speed monitoring and warning system was developed. And to obtain high-precision wind speed short-term forecasting values for the system to make more accurate scheduling decision, two optimization algorithms were proposed. Using them to make calculative examples for actual wind speed time series from the 18th meteorological station, the results show that: the optimization algorithm based on wavelet analysis method and improved time series analysis method can attain high-precision multi-step forecasting values, the mean relative errors of one-step, three-step, five-step and ten-step forecasting are only 0.30%, 0.75%, 1.15% and 1.65%, respectively. The optimization algorithm based on wavelet analysis method and Kalman time series analysis method can obtain high-precision one-step forecasting values, the mean relative error of one-step forecasting is reduced by 61.67% to 0.115%. The two optimization algorithms both maintain the modeling simple character, and can attain prediction explicit equations after modeling calculation.
文摘Short circuit and ground failures that are quite common in power transmission lines are investigated. These failures are designed considering a system that is supplied by this wind system, and analyses are interpreted. In the study, a system is set up and it is fed by the wind turbine. Furthermore, the mathematical model of wind turbine and generator is prepared and the results obtained from the simulation are evaluated. The short circuit and ground fault analyzes were performed separately for each of the three phases. ATP (alternative transient program)-EMTP (electromagnetic transients program) program is used in the analysis and the results obtained were found to be quite compatible.