Surface mining operations extract a large quantity of waste material,which is generally disposed into a dump area.This waste can cause a series of environmental problems ranging from landscape deterioration to acidic ...Surface mining operations extract a large quantity of waste material,which is generally disposed into a dump area.This waste can cause a series of environmental problems ranging from landscape deterioration to acidic water generation and water pollution.Therefore,mine waste management is a significant task in mining operations.As known,in strip mining,the overburden is not transported to waste dumps but disposed directly into adjacent strip which was mined out.This concept can be adapted for mine planning of relatively horizontal deposits through a mixed integer programming(MIP)model.The main idea behind this work is that,in one pit,production voids created in early year of mining are used for waste landfilling in late years of production.In other words,in addition to external dumping,a landfilling option within the same pit is proposed for mine design optimization.The problem is formulated as maximization of the net present value(NPV)of the mining project under the constraints of access,landfill waste handling,mining and processing capacities.A case study using a data set was carried out to see the performance of the proposed approach.The findings showed that this approach could be used in waste management incorporating a landfilling option into mine planning.As a result,material handling costs decrease,and environmental compliance increases due to less external waste quantity.展开更多
To protect mining areas from electrical fire, it is very important to install electrical nre momtormg system to ensure safety in development of mineral resources and for buildings. In this paper, design for electrical...To protect mining areas from electrical fire, it is very important to install electrical nre momtormg system to ensure safety in development of mineral resources and for buildings. In this paper, design for electrical fire monitoring and detection system with optional sensor modules has been proposed. In addition, necessity and suitability of electrical fire monitoring and detection system with optional sensor modules in mining areas have been reviewed. The designed electrical fire monitoring and detection system suit- able for work environment of mining industry is composed by host-computer monitoring software and slave-computer detectors. Monitoring detectors are manufactured by using embedded technology. Exter- nal shells deployed have superior enclosure performances and explosion-proof properties. It is easy to install and maintain the system. In general, the system has reached, or even exceeded standards specified in national standards for performances and appearances of such devices. Test results show application of electrical fire monitoring and detection system can effectively enhance monitoring intensity over the mining areas and provide reliable guarantee to ensure orderly development of mineral resources and to protect physical and property safety of citizens in these areas.展开更多
Three drums with different helical angles (15°, 20°, and 25°) were developed to investigate improved loading performance of the shearer drum. Nine trials were performed at different drum rotation spee...Three drums with different helical angles (15°, 20°, and 25°) were developed to investigate improved loading performance of the shearer drum. Nine trials were performed at different drum rotation speeds (80, 100, and 120 r/min) and different haulage speeds (1.5, 2.0, and 2.5 m/min) in an orthogonal test design. Loaded coal quantity and cutting power of the drum were the responses measured under the dif- ferent conditions. The effect of the parameters was determined by means of the extreme difference method. The significance of the effects was determined by analysis of variance. The results indicate that the effect from changes in the helical vane on loading performance of the drum is the largest in magnitude. The haulage speed has the least affect on loading performance. The helical angle has the least affect on cutting power of the drum. Haulage speed has the largest affect on the cutting power of the drum. 2011 Published by Elsevier B.V. on behalf of China University of Mining & Technology.展开更多
An expert decision support system (EDSS) for multi-bins balance and contro1 of orequality in production ore bins of some large-scale open pit iron mine in China has been developed byexpert svitem tool software VP-EXPE...An expert decision support system (EDSS) for multi-bins balance and contro1 of orequality in production ore bins of some large-scale open pit iron mine in China has been developed byexpert svitem tool software VP-EXPERT and integration software LOTUS 1-2-3 in this paper. Itis known by practicing that a medium-scale EDSS constructed on microcomputer is completcly, feaasible by means of VP-EXEPERT to construct knowledge base system (KBS), LOTUS 1-2-3 tomake decision support system (DSS) and link them with BAT.展开更多
文摘Surface mining operations extract a large quantity of waste material,which is generally disposed into a dump area.This waste can cause a series of environmental problems ranging from landscape deterioration to acidic water generation and water pollution.Therefore,mine waste management is a significant task in mining operations.As known,in strip mining,the overburden is not transported to waste dumps but disposed directly into adjacent strip which was mined out.This concept can be adapted for mine planning of relatively horizontal deposits through a mixed integer programming(MIP)model.The main idea behind this work is that,in one pit,production voids created in early year of mining are used for waste landfilling in late years of production.In other words,in addition to external dumping,a landfilling option within the same pit is proposed for mine design optimization.The problem is formulated as maximization of the net present value(NPV)of the mining project under the constraints of access,landfill waste handling,mining and processing capacities.A case study using a data set was carried out to see the performance of the proposed approach.The findings showed that this approach could be used in waste management incorporating a landfilling option into mine planning.As a result,material handling costs decrease,and environmental compliance increases due to less external waste quantity.
基金the Science & Technology Research and Development Project of Langfang Municipal City for the Year 2013 (No.2013011048)Baoding GEEHO Electric Technology Development Co.,Ltd.for financial support and help in data acquisition and statistics during preparation of this paper
文摘To protect mining areas from electrical fire, it is very important to install electrical nre momtormg system to ensure safety in development of mineral resources and for buildings. In this paper, design for electrical fire monitoring and detection system with optional sensor modules has been proposed. In addition, necessity and suitability of electrical fire monitoring and detection system with optional sensor modules in mining areas have been reviewed. The designed electrical fire monitoring and detection system suit- able for work environment of mining industry is composed by host-computer monitoring software and slave-computer detectors. Monitoring detectors are manufactured by using embedded technology. Exter- nal shells deployed have superior enclosure performances and explosion-proof properties. It is easy to install and maintain the system. In general, the system has reached, or even exceeded standards specified in national standards for performances and appearances of such devices. Test results show application of electrical fire monitoring and detection system can effectively enhance monitoring intensity over the mining areas and provide reliable guarantee to ensure orderly development of mineral resources and to protect physical and property safety of citizens in these areas.
基金support for this work was provided by the National Natural Science Foundation of China (No. 51005232)the China Postdoctoral Science Foundation (No. 20100481176)
文摘Three drums with different helical angles (15°, 20°, and 25°) were developed to investigate improved loading performance of the shearer drum. Nine trials were performed at different drum rotation speeds (80, 100, and 120 r/min) and different haulage speeds (1.5, 2.0, and 2.5 m/min) in an orthogonal test design. Loaded coal quantity and cutting power of the drum were the responses measured under the dif- ferent conditions. The effect of the parameters was determined by means of the extreme difference method. The significance of the effects was determined by analysis of variance. The results indicate that the effect from changes in the helical vane on loading performance of the drum is the largest in magnitude. The haulage speed has the least affect on loading performance. The helical angle has the least affect on cutting power of the drum. Haulage speed has the largest affect on the cutting power of the drum. 2011 Published by Elsevier B.V. on behalf of China University of Mining & Technology.
文摘An expert decision support system (EDSS) for multi-bins balance and contro1 of orequality in production ore bins of some large-scale open pit iron mine in China has been developed byexpert svitem tool software VP-EXPERT and integration software LOTUS 1-2-3 in this paper. Itis known by practicing that a medium-scale EDSS constructed on microcomputer is completcly, feaasible by means of VP-EXEPERT to construct knowledge base system (KBS), LOTUS 1-2-3 tomake decision support system (DSS) and link them with BAT.