期刊文献+
共找到6篇文章
< 1 >
每页显示 20 50 100
浅谈煤矿安全培训中的模拟训练
1
作者 李耀永 《江苏煤炭》 2004年第1期50-51,共2页
目前,煤矿安全培训的地位不断提高,培训效果也更加引起人们的关注。本文就模拟训练在培训过程中运用的方式方法及教学效果,提出了自己的观点。
关键词 煤矿安全培训 模拟训练 矿井测风 瓦斯检
下载PDF
A new matrix-based mathematical model for determining unidirectional circuits in a ventilation network 被引量:2
2
作者 贾进章 《Journal of Coal Science & Engineering(China)》 2008年第2期260-262,共3页
The occurrence of local circulating ventilation can be caused by many factors, such as the airflow reversion during mine fire,the improper arrangement of local fan or underground fan station and the man-made error inp... The occurrence of local circulating ventilation can be caused by many factors, such as the airflow reversion during mine fire,the improper arrangement of local fan or underground fan station and the man-made error input of raw data before network solving. Once circulating ventilations occur,the corresponding branches in the ventilation network corresponding to the relevant airways in ventilation system form circuits,and all the direc- tions of the branches in the circuits are identical,which is the unidirectional problem in ventilation network.Based on the properties of node adjacent matrix,a serial of mathe- matical computation to node adjacent matrix were performed,and a mathematical model for determining unidirectional circuits based on node adjacent matrix was put forward. 展开更多
关键词 fluid network unidirectional circuit adjacent matrix
下载PDF
Sensitivity analysis of relevant parameters in complicated mine ventilation network by numerical test 被引量:1
3
作者 王从陆 吴超 王卫军 《Journal of Central South University of Technology》 2005年第2期205-208,共4页
Depending on the numerical test approach on a computer, the relationships among relevant parameters, eg branch number, node number, mesh number, computation accuracy, preliminary value of airflow rate, iteration numbe... Depending on the numerical test approach on a computer, the relationships among relevant parameters, eg branch number, node number, mesh number, computation accuracy, preliminary value of airflow rate, iteration number, computation time and convergence in a mine ventilation network analysis, were investigated based on 5 mine ventilation systems. The results show that a higher computation accuracy greatly influences the iteration number. When the accuracy reaches 10-6m3·s-1 for solving a complicated mine ventilation network, the running time is too long though a high-speed computer is used. The preliminary value of airflow rate in the range of 1100m3·s-1 has little effects the iteration number. The structure of network also has some effect on the iteration number. 展开更多
关键词 mine ventilation sensitivity analysis numerical test parameters adjustment
下载PDF
Real-time Diesel Particulate Matter ambient monitoring in underground mines
4
作者 Gillies A D S 《Journal of Coal Science & Engineering(China)》 2011年第3期225-231,共7页
A real-time Diesel Particulate Matter (DPM) monitor has been developed on the base of the successful National In- stitute of Occupational Health and Safety (NIOSH) designed Personal Dust Monitor (PDM) unit. The ... A real-time Diesel Particulate Matter (DPM) monitor has been developed on the base of the successful National In- stitute of Occupational Health and Safety (NIOSH) designed Personal Dust Monitor (PDM) unit. The objectives of a recently completed Australian Coal Association Research Program (ACARP) study was to modify the PDM to measure the submicrometre fraction of the aerosol in a real-time monitoring underground instrument. Mine testing focused on use of the monitor in engineering evaluations of Longwall (LW) moves demonstrated how DPM concentrations from vehicles fluctuate under varying ventilation and operational conditions. The strong influence of mine ventilation systems is reviewed. Correlation between the current SKC DPM measurement system and real-time DPM monitors were conducted and results from eight mines show a correlation between elemental carbon (EC) and the new monitor DPM mass ranging from 0.45 to 0.82 with R2〉0.86 in all but two cases. This differences in suspected to be due to variations from mine to mine in aspects such as mine atmospheric contamination, vehicle fleet variations, fuel type, engine maintenance, engine combustion efficiency, engine behavior or interference from other submicrometre aerosol. Real-time monitoring clearly reflects the movement of individual diesel vehicles and allows pin-pointing of high exposure zones such as those encountered where various vehicles engage in intense work in areas of constrained or difficult ventilation. DPM shift average monitoring approaches do not readily allow successful engineering evaluation exercises to determine acceptability of pollution levels. Identification of high DPM concentration zones allows efficient modification of mine ventilation, operator positioning and other work practices to reduce miners' exposures without waiting for laboratory analysis results. 展开更多
关键词 real-time diesel particulate matter total carbon elemental carbon
下载PDF
THE LEAST SQUARES COMPREHENSIVE ADJUSTMENT FOR MINE VENTILATION MEASUREMENTS
5
作者 王省身 刘雪峰 《Journal of China University of Mining and Technology》 1990年第1期49-59,共11页
This paper systematically introduced the method of direct, indirect and free-network adjustments and their application in data process of minewide ventilation measurements. The direct adjustment is suitable for errors... This paper systematically introduced the method of direct, indirect and free-network adjustments and their application in data process of minewide ventilation measurements. The direct adjustment is suitable for errors collating of the measurements of airflow rates. The indirect method is suitable for the adjustment of ventilation resistance. The free-net method is adapted to the combined adjustment of the measurements of both the ventilation in branches of the air network and the air pressure at nodes of the ventilation network, the partial adjustment is also introduced here to be used for saving the storage locations in computer required for the adjustment for large scale mine ventilation measurements. 展开更多
关键词 ventilation measurement adjustment least squares ventilation network
下载PDF
Experimental study on f-ω regulation model under abnormal methane emission
6
作者 Wu Zhengyan Jiang Shuguang +6 位作者 Wang Kai Shao Hao Zhou Song He Xinjian Han Jing Cui Chuanbo Pei Xiaodong 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第6期1153-1159,共7页
In view of the difficulty of automatic adjustment, the recovery lag and the major accident potential of the mine ventilation system, an experimental model of the pipe net was established according to the typical one m... In view of the difficulty of automatic adjustment, the recovery lag and the major accident potential of the mine ventilation system, an experimental model of the pipe net was established according to the typical one mine and one working face ventilation system of Daliuta coal mine. Using the best uniform approximation method of Chebyshev interpolation to fit the fan performance curve, we experimentally determined fan characteristics with different frequencies and establish the data base for the curves. Based on ventilation network monitoring theory, we designed a monitoring system for ventilation network parameter monitoring and fan operating frequency automatic control. Using the absolute methane emission quantity to predict the air quantity requirement of branch and fan frequency, we established a f-ω regulation model based on fan frequency and absolute methane emission quantity. After analysing methane emission and distribution characteristics, using CO_2 to simulate the methane emission characteristics from a working face, we verified the correctness and rationality of the f-ω regulation model. The fan operation frequency is adjusted by the method of air adjustment change with methane emission quantity and the curve searching method after determining air quantity requirements. The results show that the air quantity in a branch strictly changes according to the f-ω regulation model, in the airincreasing dilution by fan frequency regulation, the CO_2 concentration is limited to the set threshold value. The paper verifies the practicability of a frequency regulation system and the feasibility of the frequency adjustment scheme and provides guidance for the construction of automatic frequency conversion control system in coal mine ventilation networks. 展开更多
关键词 Pipe network model Frequency regulation f-ω regulation model Prediction of air quantity requirement Air-increasing dilution
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部