Drilling and blasting play vital roles in opencast mining. These operations not only affect the cost of production directly but as well and significantly, the overall operational costs. This research was carried out t...Drilling and blasting play vital roles in opencast mining. These operations not only affect the cost of production directly but as well and significantly, the overall operational costs. This research was carried out to find a possible way of optimizing the drilling and blasting operations in an open pit mine of Somair (Société des Mines de l’Air), in the Niger Republic. In order to optimize the drilling operation, the time taken by two drilling machines to accomplish the same task was analyzed statistically. The result indicates that the Down the Hole Hammer Drilling Rig (DMNo406) is more efficient than the Drill Master (DM405). The relative unit consumption of two explosives (Explus and Nitram 9), when used under the same operating conditions, were also considered and the results indicate Explus to be more economical per unit consumption with a range of 0.15 g/t–0.183 g/t, when compared with Nitram 9 with a unit consumption range of 0.19 g/t-0.24 g/t in the study area.展开更多
The scalloped medium-length hole blasting mining method used in Dahongshan Copper Mine accounted for more than 61%of the total amount of mining,but the large boulder yield restricted the intensity of ore supply for mi...The scalloped medium-length hole blasting mining method used in Dahongshan Copper Mine accounted for more than 61%of the total amount of mining,but the large boulder yield restricted the intensity of ore supply for mines,and the average boulder yield was as high as 22.7%.In order to develop the mine production efficiency,the circular medium-length hole blasting technology was proposed and field tests were carried out.The test results showed that circular medium-length hole blasting mining can reduce the average boulder yield to 10.3%.Compared with the traditional scalloped medium-length hole blasting mining,the average boulder yield was decreased by 12.4%.The daily yield of ore for the panel on duty was increased by 152.29 t,and the growth rate was 51.1%.The new technology can reduce the time for the handling of boulder and the consumption of explosives and detonators for recrushing,and increase the efficiency of mining while reduce the mining cost,which has received good blasting effects.展开更多
文摘Drilling and blasting play vital roles in opencast mining. These operations not only affect the cost of production directly but as well and significantly, the overall operational costs. This research was carried out to find a possible way of optimizing the drilling and blasting operations in an open pit mine of Somair (Société des Mines de l’Air), in the Niger Republic. In order to optimize the drilling operation, the time taken by two drilling machines to accomplish the same task was analyzed statistically. The result indicates that the Down the Hole Hammer Drilling Rig (DMNo406) is more efficient than the Drill Master (DM405). The relative unit consumption of two explosives (Explus and Nitram 9), when used under the same operating conditions, were also considered and the results indicate Explus to be more economical per unit consumption with a range of 0.15 g/t–0.183 g/t, when compared with Nitram 9 with a unit consumption range of 0.19 g/t-0.24 g/t in the study area.
基金National Natural Science Foundation of China (No. 51304087) Foundation Projects of Yun- nan Province (No. KKSY201404056, No. KKSA201121083)
文摘The scalloped medium-length hole blasting mining method used in Dahongshan Copper Mine accounted for more than 61%of the total amount of mining,but the large boulder yield restricted the intensity of ore supply for mines,and the average boulder yield was as high as 22.7%.In order to develop the mine production efficiency,the circular medium-length hole blasting technology was proposed and field tests were carried out.The test results showed that circular medium-length hole blasting mining can reduce the average boulder yield to 10.3%.Compared with the traditional scalloped medium-length hole blasting mining,the average boulder yield was decreased by 12.4%.The daily yield of ore for the panel on duty was increased by 152.29 t,and the growth rate was 51.1%.The new technology can reduce the time for the handling of boulder and the consumption of explosives and detonators for recrushing,and increase the efficiency of mining while reduce the mining cost,which has received good blasting effects.