This paper discussed the necessity of establishing a computer network in a mining railway transport management system. The network structure and the system security design, associated with the real development conditi...This paper discussed the necessity of establishing a computer network in a mining railway transport management system. The network structure and the system security design, associated with the real development condition of a mining area, were brought forward, and the system evaluation was given.展开更多
The method of reliability analysis of mineral reserve estimation, mining construction, mining technological system and surface mine investment in mine design is discussed in this paper. On the basis of this method, th...The method of reliability analysis of mineral reserve estimation, mining construction, mining technological system and surface mine investment in mine design is discussed in this paper. On the basis of this method, the questions, such as "whether the planned production and predicted economic effectiveness could be obtained", can be answered, and corresponding measures can be taken.展开更多
Production system of fully-mechanized face is a complicated system composed of human, machine and environment, meantime influenced by various random factors. Analyzing the reliability of system needs plentiful data by...Production system of fully-mechanized face is a complicated system composed of human, machine and environment, meantime influenced by various random factors. Analyzing the reliability of system needs plentiful data by means of system faults statistic. Based on the viewpoint that shift output of fully-mechanized face is the result of various random factors’ synthetical influence, the process of how to analyze its reliability was deduced by using probability theory, symbolic statistics theory and systematic reliability theory combined with the concrete case study in this paper. And it has been proved that this method is feasible and valuable.展开更多
Based on the function analysis of surge bunker in mine haulage system, the authors raise the calculation methods of the total output of a mine haulage system. Taking the maximum of system’s total throughput as a obje...Based on the function analysis of surge bunker in mine haulage system, the authors raise the calculation methods of the total output of a mine haulage system. Taking the maximum of system’s total throughput as a objective, the method of determining the surge bunker’s rational size is put forward. Also, the problems of rational position of surge bunker are analysesed.展开更多
There are a lot of uncertainties in the mining engineering, and they make a notable impact on the engineering. The uncertainties of the physical and mechanical properties of geotectonic mass, the surrounding rock stab...There are a lot of uncertainties in the mining engineering, and they make a notable impact on the engineering. The uncertainties of the physical and mechanical properties of geotectonic mass, the surrounding rock stability, the nature condition, the equipment operation, the personnel and the external environment are proposed and described. The stochastic analysis should be widely used for considering the impacts of the uncertainty on the mining engineering. The economical risk analysis and the stochastic index system should also be set up in the mining engineering.展开更多
文摘This paper discussed the necessity of establishing a computer network in a mining railway transport management system. The network structure and the system security design, associated with the real development condition of a mining area, were brought forward, and the system evaluation was given.
基金This project is supported by the doctorate fund of State Education Commission
文摘The method of reliability analysis of mineral reserve estimation, mining construction, mining technological system and surface mine investment in mine design is discussed in this paper. On the basis of this method, the questions, such as "whether the planned production and predicted economic effectiveness could be obtained", can be answered, and corresponding measures can be taken.
基金Project 50474069 supported by National Natural Science Foundation of China Project 20020290005 supported by Specialized Research Fund for theDoctoral Program of Higher Education
文摘Production system of fully-mechanized face is a complicated system composed of human, machine and environment, meantime influenced by various random factors. Analyzing the reliability of system needs plentiful data by means of system faults statistic. Based on the viewpoint that shift output of fully-mechanized face is the result of various random factors’ synthetical influence, the process of how to analyze its reliability was deduced by using probability theory, symbolic statistics theory and systematic reliability theory combined with the concrete case study in this paper. And it has been proved that this method is feasible and valuable.
文摘Based on the function analysis of surge bunker in mine haulage system, the authors raise the calculation methods of the total output of a mine haulage system. Taking the maximum of system’s total throughput as a objective, the method of determining the surge bunker’s rational size is put forward. Also, the problems of rational position of surge bunker are analysesed.
文摘There are a lot of uncertainties in the mining engineering, and they make a notable impact on the engineering. The uncertainties of the physical and mechanical properties of geotectonic mass, the surrounding rock stability, the nature condition, the equipment operation, the personnel and the external environment are proposed and described. The stochastic analysis should be widely used for considering the impacts of the uncertainty on the mining engineering. The economical risk analysis and the stochastic index system should also be set up in the mining engineering.