期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
广西盘龙铅锌矿多中段层叠采空区尾砂胶结充填法的应用 被引量:1
1
作者 马庶曦 庞欣荣 《建材与装饰》 2013年第39期105-106,共2页
全尾砂干排胶结充填法,其充填系统由四条生产线组成:①尾砂干排处理及输送线;②水泥输送线;③供水线;④充填料浆制备及料浆输送线。充填原料主要是尾砂、水泥(添加和易剂)、水,采用螺旋计量秤自动化计量配比,通过双轴搅拌机与... 全尾砂干排胶结充填法,其充填系统由四条生产线组成:①尾砂干排处理及输送线;②水泥输送线;③供水线;④充填料浆制备及料浆输送线。充填原料主要是尾砂、水泥(添加和易剂)、水,采用螺旋计量秤自动化计量配比,通过双轴搅拌机与高效活化搅拌机组成的两级搅拌形成高质量的充填料浆。充填料浆由料浆输送线和充填钻孔输送至充填区,完成充填工作。经过对采空区的充填处理能够有效遏制因采空区引发的大面积冒顶、片帮、地表下沉等重特大安全事故的发生,消除重大事故隐患,实现金属非金属地下矿山安全生产。 展开更多
关键词 浅表多中段层叠采空区 充填体强度优化 低扰动回收技术 分级尾砂高浓度抗离析充填技术 矿柱回收率
下载PDF
Orthogonal design and numerical simulation of room and pillar configurations in fractured stopes 被引量:7
2
作者 吴爱祥 黄明清 +3 位作者 韩斌 王贻明 于少峰 缪秀秀 《Journal of Central South University》 SCIE EI CAS 2014年第8期3338-3344,共7页
Room and pillar sizes are key factors for safe mining and ore recovery in open-stope mining. To investigate the influence of room and pillar configurations on stope stability in highly fractured and weakened areas, an... Room and pillar sizes are key factors for safe mining and ore recovery in open-stope mining. To investigate the influence of room and pillar configurations on stope stability in highly fractured and weakened areas, an orthogonal design with two factors, three levels and nine runs was proposed, followed by three-dimensional numerical simulation using ANSYS and FLAC3~. Results show that surface settlement after excavation is concentrically ringed, and increases with the decrease of pillar width and distances to stope gobs. In the meantime, the ore-control fault at the ore-rock boundary and the fractured argillaceous dolomite with intercalated slate at the hanging wall deteriorate the roof settlement. Additionally, stope stability is challenged due to pillar rheological yield and stress concentration, and both are induced by redistribution of stress and plastic zones after mining. Following an objective function and a constraint function, room and pillar configuration with widths of 14 m and 16 m, respectively, is presented as the optimization for improving the ore recovery rate while maintaining a safe working environment. 展开更多
关键词 orthogonal design numerical simulation surface movement roof settlement stope stability room and pillarconfiguration
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部