Open pit mining operations utilize large scale and expensive equipment. For the mines implementing shovel and truck operation system, trucks constitute a large portion of these equipment and are used for hauling the m...Open pit mining operations utilize large scale and expensive equipment. For the mines implementing shovel and truck operation system, trucks constitute a large portion of these equipment and are used for hauling the mined materials. In order to have sustainable and viable operation, these equipment need to be utilized efficiently with minimum operating cost. Maintenance cost is a significant proportion of the overall operating costs. The maintenance cost of a truck changes non-linearly depending on the type, age and truck types. A new approach based on stochastic integer programming (SIP) techniques is used for annually scheduling a fixed fleet of mining trucks in a given operation, over the life of mine (multi-year time horizon) to minimize maintenance cost. The maintenance cost data in mining usually has uncertainty caused from the variability of the operational conditions at mines. To estimate the cost, usually historic data from different operations for new mines, and/or the historic data at the operating mines are used. However, maintenance cost varies depending on road conditions, age of equipment and many other local conditions at an operation. Traditional models aim to estimate the maintenance cost as a deterministic single value and financial evaluations are based on the estimated value. However, it does not provide a confidence on the estimate. The proposed model in this study assumes the truck maintenance cost is a stochastic parameter due to the significant level of uncertainty in the data and schedules the available fleet to meet the annual production targets. The scheduling has been performed by applying both the proposed stochastic and deterministic approaches. The approach provides a distribution for the maintenance cost of the optimized equipment schedule minimizing the cost.展开更多
Along with the development of automatical truck dispatching in open pits, it is important to es-tablish general-gurpose criteria for truck dispatching optimization. The existing dispatching criteria are briefly introd...Along with the development of automatical truck dispatching in open pits, it is important to es-tablish general-gurpose criteria for truck dispatching optimization. The existing dispatching criteria are briefly introduced and optimal dispatching criteria for different haulage systems are recommended. Obvious economic results have been obtained from case studies applying the recommended dispatching criteria.展开更多
The development and experiment of a computer-controlled truck dispatching system in Surface mine is presented in this paper.It includes the system overall design, the system working mode design, the selection of the b...The development and experiment of a computer-controlled truck dispatching system in Surface mine is presented in this paper.It includes the system overall design, the system working mode design, the selection of the best truck travel path, the development of truck fleet programming, the development of database management system, and the development of truck real time dispatching, etc. The successful experiment is carried out in Huolinhe surface mine, and the satisfied results are obtained. Application of this system can improve the system production and the mine management. This system is the first one in our country at present.展开更多
文摘Open pit mining operations utilize large scale and expensive equipment. For the mines implementing shovel and truck operation system, trucks constitute a large portion of these equipment and are used for hauling the mined materials. In order to have sustainable and viable operation, these equipment need to be utilized efficiently with minimum operating cost. Maintenance cost is a significant proportion of the overall operating costs. The maintenance cost of a truck changes non-linearly depending on the type, age and truck types. A new approach based on stochastic integer programming (SIP) techniques is used for annually scheduling a fixed fleet of mining trucks in a given operation, over the life of mine (multi-year time horizon) to minimize maintenance cost. The maintenance cost data in mining usually has uncertainty caused from the variability of the operational conditions at mines. To estimate the cost, usually historic data from different operations for new mines, and/or the historic data at the operating mines are used. However, maintenance cost varies depending on road conditions, age of equipment and many other local conditions at an operation. Traditional models aim to estimate the maintenance cost as a deterministic single value and financial evaluations are based on the estimated value. However, it does not provide a confidence on the estimate. The proposed model in this study assumes the truck maintenance cost is a stochastic parameter due to the significant level of uncertainty in the data and schedules the available fleet to meet the annual production targets. The scheduling has been performed by applying both the proposed stochastic and deterministic approaches. The approach provides a distribution for the maintenance cost of the optimized equipment schedule minimizing the cost.
文摘Along with the development of automatical truck dispatching in open pits, it is important to es-tablish general-gurpose criteria for truck dispatching optimization. The existing dispatching criteria are briefly introduced and optimal dispatching criteria for different haulage systems are recommended. Obvious economic results have been obtained from case studies applying the recommended dispatching criteria.
文摘The development and experiment of a computer-controlled truck dispatching system in Surface mine is presented in this paper.It includes the system overall design, the system working mode design, the selection of the best truck travel path, the development of truck fleet programming, the development of database management system, and the development of truck real time dispatching, etc. The successful experiment is carried out in Huolinhe surface mine, and the satisfied results are obtained. Application of this system can improve the system production and the mine management. This system is the first one in our country at present.