期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
砂石地质条件下冲击钻孔桩坍孔的预防及处理 被引量:4
1
作者 袁丰田 《山西建筑》 2006年第6期94-95,共2页
结合赤(峰)大(板)高速公路第三合同段阴河大桥钻孔灌注桩施工过程,对施工过程中出现的坍孔进行了分析,详细阐述了砂石地质条件下发生坍孔的原因及预防处理措施,收到了很好的效果。
关键词 砂石地质 冲击钻孔桩 坍孔 预防处理
下载PDF
河床砂石地质状况深基坑降水及开挖施工技术 被引量:1
2
作者 光俊民 《山西建筑》 2015年第33期94-96,共3页
结合甘肃泾川污水处理工程粗格栅基坑施工实例,介绍了基坑施工的方案,对降水、开挖、垫层施工等关键工序的施工方法控制要点进行了阐述,通过对基坑边坡及水位的监测,提出了安全保证措施。
关键词 砂石地质 深基坑 管井降水 水位监测
下载PDF
Transitional geology and its effects on development and longwall mining in Pittsburgh Seam 被引量:3
3
作者 Lu Jun Van Dyke Mark +1 位作者 Su Daniel W.H. Hasenfus Greg 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第1期31-37,共7页
This paper presents the geologic and ground control challenges that were encountered by Consol Energy's coal mining operations in southwestem Pennsylvania, USA. Geologic encounters, such as sandstone- to-limestone ge... This paper presents the geologic and ground control challenges that were encountered by Consol Energy's coal mining operations in southwestem Pennsylvania, USA. Geologic encounters, such as sandstone- to-limestone geology transition, massive sandstone channels, shale channels, pyritic rich green claystone, laminated roof, and soft floor, have significantly impacted the development and longwall mining in Consol's Pittsburgh Seam coal mines. Experience from different mines shows that, in the sandstone-to-limestone geology transition zone, 1.83 m high-tension, fully-grouted primary bolts employed along with 4.88 m cen- ter cable bolts at every other strap greatly improved beam building and ensured proper anchorage into the competent roof. Hydraulic fracturing of the massive sandstone was often necessary to enhance caving of the massive sandstone behind the shields to relieve pressure at the face. The presence of soft floor coupled with presence of thick floor coal and deep cover, induced excessive headgate convergence during retreat of the first right hand longwall panel. In all, it is important to explore the roof and in-seam geology in detail to delineate normal and anomalous geologic conditions prior to and during development. With diligent geologic reconnaissance, geotechnical monitoring, and assessment, site-specific geotechnical solutions have been provided to mine operations to improve safety and productivity. 展开更多
关键词 Coal miningGeology transition zoneGround controlRoof bolt
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部