Based on the construction bridge of Xiamen-Shenzhen high-speed railway(9-32 m simply-supported beam + 6×32 m continuous beam),the pier-beam-track finite element model,where the continuous beam of the ballast trac...Based on the construction bridge of Xiamen-Shenzhen high-speed railway(9-32 m simply-supported beam + 6×32 m continuous beam),the pier-beam-track finite element model,where the continuous beam of the ballast track and simply-supported beam are combined with each other,was established.The laws of the track stress,the pier longitudinal stress and the beam-track relative displacement were analyzed.The results show that reducing the longitudinal resistance can effectively reduce the track stress and the pier stress of the continuous beam,and increase the beam-track relative displacement.Increasing the rigid pier stiffness of continuous beam can reduce the track braking stress,increase the pier longitudinal stress and reduce the beam-track relative displacement,Increasing the rigid pier stiffness of simply-supported beam can reduce the track braking stress,the rigid pier longitudinal stress and the beam-track relative displacement.展开更多
It has been proven that longwall faces can be moved safely and efficiently. However,abutment pressures and poor ground control conditions can halt operations and be hazardous to coal miners. Recently at a mine in Sout...It has been proven that longwall faces can be moved safely and efficiently. However,abutment pressures and poor ground control conditions can halt operations and be hazardous to coal miners. Recently at a mine in Southwestern Pennsylvania,roof material collapsed above shields that created two large voids and caused major challenges for shield recovery. A unique,engineering solution was developed that utilized a modified concrete material to fill the voids,creating stability in the affected area. The many phases of this project included the construction phase,void pumping,cutting out,and bolting of the concrete material. This project eliminated the hazards associated with bolting the recovery face and removing shields in adverse conditions,making it possible for the mine operator to safely complete the longwall move.展开更多
The most relevant aspects related to the phase mask dithering/moving method for the fabrication of complex Bragg grating designs are reviewed. Details for experimental implementation of this technique is presented, in...The most relevant aspects related to the phase mask dithering/moving method for the fabrication of complex Bragg grating designs are reviewed. Details for experimental implementation of this technique is presented, including theoretical analysis of the calibration functions for the correct dither/displacement. Results from tailored Bragg grating structures fabricated by this method are shown. Apodized Bragg gratings with modeled spatial profiles were implemented, resulting in side mode suppression levels of more than 20 dB in gratings showing transmission filtering level higher than 30 dB. Chirped gratings with the spectral bandwidth up to 4 nm, π-shift and sampled Bragg gratings with equalized peaks equally spaced by 0.8 nm (100 GHz) were also fabricated.展开更多
基金Project(50678176) supported by the National Natural Science Foundation of China
文摘Based on the construction bridge of Xiamen-Shenzhen high-speed railway(9-32 m simply-supported beam + 6×32 m continuous beam),the pier-beam-track finite element model,where the continuous beam of the ballast track and simply-supported beam are combined with each other,was established.The laws of the track stress,the pier longitudinal stress and the beam-track relative displacement were analyzed.The results show that reducing the longitudinal resistance can effectively reduce the track stress and the pier stress of the continuous beam,and increase the beam-track relative displacement.Increasing the rigid pier stiffness of continuous beam can reduce the track braking stress,increase the pier longitudinal stress and reduce the beam-track relative displacement,Increasing the rigid pier stiffness of simply-supported beam can reduce the track braking stress,the rigid pier longitudinal stress and the beam-track relative displacement.
文摘It has been proven that longwall faces can be moved safely and efficiently. However,abutment pressures and poor ground control conditions can halt operations and be hazardous to coal miners. Recently at a mine in Southwestern Pennsylvania,roof material collapsed above shields that created two large voids and caused major challenges for shield recovery. A unique,engineering solution was developed that utilized a modified concrete material to fill the voids,creating stability in the affected area. The many phases of this project included the construction phase,void pumping,cutting out,and bolting of the concrete material. This project eliminated the hazards associated with bolting the recovery face and removing shields in adverse conditions,making it possible for the mine operator to safely complete the longwall move.
文摘The most relevant aspects related to the phase mask dithering/moving method for the fabrication of complex Bragg grating designs are reviewed. Details for experimental implementation of this technique is presented, including theoretical analysis of the calibration functions for the correct dither/displacement. Results from tailored Bragg grating structures fabricated by this method are shown. Apodized Bragg gratings with modeled spatial profiles were implemented, resulting in side mode suppression levels of more than 20 dB in gratings showing transmission filtering level higher than 30 dB. Chirped gratings with the spectral bandwidth up to 4 nm, π-shift and sampled Bragg gratings with equalized peaks equally spaced by 0.8 nm (100 GHz) were also fabricated.