The importance and complexity of prioritizing construction projects (PCP) in urban road network planning lead to the necessity to develop an aided decision making program (ADMP). Cost benefit ratio model and stage rol...The importance and complexity of prioritizing construction projects (PCP) in urban road network planning lead to the necessity to develop an aided decision making program (ADMP). Cost benefit ratio model and stage rolled method are chosen as the theoretical foundations of the program, and then benefit model is improved to accord with the actuality of urban traffic in China. Consequently, program flows, module functions and data structures are designed, and particularly an original data structure of road ...展开更多
The application of multi-level fuzzy comprehensive appraisal on social effects of projects has been studied. The principles for setting up an index system have been analyzed and the index system has been set up accord...The application of multi-level fuzzy comprehensive appraisal on social effects of projects has been studied. The principles for setting up an index system have been analyzed and the index system has been set up according to projects of construction. Models for multi-level fuzzy comprehensive appraisal have been offered and relative calculation steps have been given according to project instances.展开更多
Weak rock zone (soft interlayer, fault zone and soft rock) is the highlight of large-scale geological engineering research. It is an important boundary for analysis of rock mass stability. Weak rock zone has been form...Weak rock zone (soft interlayer, fault zone and soft rock) is the highlight of large-scale geological engineering research. It is an important boundary for analysis of rock mass stability. Weak rock zone has been formed in a long geological period, and in this period, various rocks have undergone long-term consolidation of geostatic stress and tectonic stress; therefore, under in-situ conditions, their density and modulus of deformation are relatively high. Due to its fragmentary nature, once being exposed to the earth's surface, the structure of weak rock zone will soon be loosened, its density will be reduced, and its modulus of deformation will also be reduced significantly. Generally, weak rock zone can be found in large construction projects, especially in the dam foundation rocks of hydropower stations. These rocks cannot be eliminated completely by excavation. Furthermore, all tests nowadays are carried out after the exposure of weak rock zone, modulus of deformation under in-situ conditions cannot be revealed. In this paper, a test method explored by the authors has been introduced. This method is a whole multilayered medium deformation method. It is unnecessary to eliminate the relatively complete rocks covering on weak rock zone. A theoretical formula to obtain the modulus of deformation in various mediums has also been introduced. On-site comparative trials and indoor deformation modulus tests under equivalent density conditions have been carried out. We adopted several methods for the prediction researches of the deformation modulus of weak rock zone under in-situ conditions, and revealed a fact that under in-situ conditions, the deformation modulus of weak rock zone are several times higher than the test results obtained after the exposure. In a perspective of geological engineering, the research findings have fundamentally changed peoples' concepts on the deformation modulus of weak rock zone, provided important theories and methods for precise definition of deformation modulus of deep weak rock zone under cap rock conditions, as well as for reasonable engineering applications.展开更多
Cost estimation has its proven importance as one of essential factors for project success. The aim of this research is to predict the early project cost using neural network. Early project cost represents a key compon...Cost estimation has its proven importance as one of essential factors for project success. The aim of this research is to predict the early project cost using neural network. Early project cost represents a key component in business unit decisions. The most important factors influencing on the parametric cost estimation in construction building projects in Gaza Strip were defined and investigated. A questionnaire survey and relative index ranking technique were used to conclude the most important factors. Fourteen most effective factors were identified. One hundred and six case studies from real executed construction project in Gaza Strip were collected for training and testing the model. The cases were prepared to be used in cost estimate neural networks model. Eighty percent of case studies were used to train and test the model. The remaining 20% was used for model verification. The results revealed the ability to the model to predict cost estimate to an acceptable degree of accuracy. The minimum squares error with 0.005 in training stage and 0.021 in testing stage were recorded.展开更多
Today, most construction projects in urban environments are complex high-rise buildings that present unique challenges, including local building ordinances and restrictions, adjoining public and residential areas, nar...Today, most construction projects in urban environments are complex high-rise buildings that present unique challenges, including local building ordinances and restrictions, adjoining public and residential areas, narrow sidewalks and streets, and underground utilities, all of which require extensive planning and tight schedules. A major problem facing such projects is to formulate realistic schedules that will make it possible to meet contractual completion dates with limited resources and budgets. The scheduling software products currently used in construction projects, which include Primavera P6, Microsoft Project, etc., are not actually applied as a scheduling tool in practical construction projects, which instead generally depend on Microsoft Excel or a bar-chart. This is because the existing scheduling programs cannot provide more user-oriented schedule format such as representing two-way multiple overlapping relationships. To overcome this deficiency, the BDM (beeline diagramming method) is proposed as a new networking technique in 2010. But two-way multiple overlapping relationships generate the loop in a conventional schedule computation process. This paper addresses the loop phenomenon of two-way multiple overlapping relationships in a BDM network as well as proposes the solutions of them, and then presents a practical application of two-way multiple overlapping relationships at a real project.展开更多
in recent years, as the project of our country is increasing, investment growth, put forward new challenges to investment in construction projects. Research from the research status of investment in construction, the ...in recent years, as the project of our country is increasing, investment growth, put forward new challenges to investment in construction projects. Research from the research status of investment in construction, the implementation process in accordance with the construction project, followed by analysis of the construction project investment the currently existing problems, and puts forward the implementation of the project the whole process as the main line, to scientific decision-making, rational design, bidding, construction control standard and completion of review strategies as the core.展开更多
In this paper, highway-related human activities are defined as well as the human activities related to highway for keeping a normal production and livelihood. They include highway research, highway education, highway ...In this paper, highway-related human activities are defined as well as the human activities related to highway for keeping a normal production and livelihood. They include highway research, highway education, highway legislation, administration of justice of highway case and enforce the law, assessment, planning, design, construction and management, decision-making of highway projects. Therefore, highway-related human activities are not equal to construction of highway projects.展开更多
After the completion of design, the construction project shall begin its implementation, which should be taken effective measures to strengthen the management of project cost and properly manage the funds to achieve t...After the completion of design, the construction project shall begin its implementation, which should be taken effective measures to strengthen the management of project cost and properly manage the funds to achieve the overall goal of the construction projects. Control of the project cost in the project implementation is mainly divided into bidding, contracting, construction and settlement. The following is the analysis and discussions of the author's experiences to the control of the project cost in the project implementation and the management measures.展开更多
Approximately 331 million ha, one-third of China's total land, is prone to desertification processes, leading to natural disasters and economic losses. In this study, the situation, tendency, their influences and the...Approximately 331 million ha, one-third of China's total land, is prone to desertification processes, leading to natural disasters and economic losses. In this study, the situation, tendency, their influences and their risk governance of desertification and blown sand disaster in China were examined using satellite images, field photographs, field data and a literature review. The desiccated areas in Lop Nor and the lower Heihe River fluvial plain covered about 50,000 km2 and 40,000 km2, respectively. In Ejina, about 100 species of vegetation became extinct. The rate of wind erosion in China was between 1,000 tons/km2/year and 2,000 tons/km2/year. There were 12 sand deserts and sandy lands, occupying a total of 710,000 km2. Salinized soils occurred across 99.1 million ha. The two main sand and dust storm-prone areas in China were the Tarim Basin and its surroundings, and the Alxa Plateau and its surroundings. From 1981 to 2007, the annual average frequency of sand and dust storms varied from 1 d to 37 d with a general increase from southeast to northwest. Since 1978, China has implemented a number of ecological construction projects that have reduced desertification from 1999 to 2004 and from 2005 to 2009, and the number of dust and sand storm days from 9.3 d between 1954 and 1959 to 4.4 d between 2000 and 2007. The results could improve understanding of desertification and blown sand disasters in China and provide valuable experiences for global desertification control.展开更多
It is difficult to analyze the inter-relationship for the construction layout of a reservoir project scientifically and intuitively.According to the characteristics of broad field and huge information,the modeling met...It is difficult to analyze the inter-relationship for the construction layout of a reservoir project scientifically and intuitively.According to the characteristics of broad field and huge information,the modeling methods of digital terrain and solid model as well as the techniques of texture mapping and scene navigation are adopted.The simulation system is developed by C program language,which includes the functions of the interactive navigation of 3D scene,the visual inquiry of project digital model information,the storage and management of project information.A certain reservoir is taken as a case.The 3D visual analysis for the construction layout and engineering information are obtained.The proposed system is of great advantages in dealing with large amount of information and the method provides a theoretical basis and technical support for the construction layout of a reservoir project.展开更多
The paper systemizes standard methods of planning, monitoring and controlling the realization of construction works in civil engineering projects and overviews the implementation of the methods in Team Co Cakovec from...The paper systemizes standard methods of planning, monitoring and controlling the realization of construction works in civil engineering projects and overviews the implementation of the methods in Team Co Cakovec from Croatia. The specificities of the methods are shown through the different construction works projects. Also, paper reviews the implementation, modification and improvement of existing methods for planning, monitoring and controlling the realization of projects in Team Co.展开更多
Selecting right equipment has been playing an important role in the success of construction projects. This paper presents a computer model, ESCMODEL, for equipment selection in Earth-fill dam projects. The proposed mo...Selecting right equipment has been playing an important role in the success of construction projects. This paper presents a computer model, ESCMODEL, for equipment selection in Earth-fill dam projects. The proposed model is capable of assisting the users in making decisions to determine the size, number, type and schedule of presence of dozers, loaders, graders, excavators, trucks, sheepsfoot rollers and smooth wheel rollers. ESCMODEL can contribute to resolve this selection process through the application of an optimization technique, based on nonlinear programming. Three actual case studies of earth-fill dam projects are presented in order to illustrate the effectiveness and performance of the model.展开更多
This research management, exp and lores preliminarily the practices of quality management, management commitment in quality quality management implementation problems in construction projects in the context of Malaysi...This research management, exp and lores preliminarily the practices of quality management, management commitment in quality quality management implementation problems in construction projects in the context of Malaysian construction industry. The research applies semi-structured interview approach with twelve project management practitioners. The findings of the study indicate that the state of quality management in construction projects in Malaysia needs to be strengthened and there are problems in relation to quality management implementation that require attention and further research. The paper provides an insight on the state of quality management in construction projects in Malaysia.展开更多
With rapid development of PetroChina's Qinghai Oilfield, engineering construction quality becomes more and more important in infrastructure construction of the oilfield. Generally speaking, engineering construction q...With rapid development of PetroChina's Qinghai Oilfield, engineering construction quality becomes more and more important in infrastructure construction of the oilfield. Generally speaking, engineering construction quality is related both to national economic development and safety of people and assets. To turn a design map into a materialized object, the construction project involves a large number of elements, such as design, materials, machinery, landform, geological factors, meteorological factors, construction process, technological measures and supervision system. Therefore, quality control holds the key to a construction project.展开更多
The modern TSs (total stations) have reached a very high level in the provided reading and reliability (accuracy and precision) of their measurements. The evolution of the digital technology has helped in this dir...The modern TSs (total stations) have reached a very high level in the provided reading and reliability (accuracy and precision) of their measurements. The evolution of the digital technology has helped in this direction. Thus, the TSs can support all requirements for the stake out and monitoring of modern survey engineering and constructions projects. Their complicated manufacturing process and the sensitivity of their components require gauging, adjusting and calibration at certain time intervals. This appears to be the only way in order to assure the precision of measurements provided by the manufacturer and the reliability of the works they are used for. The goal of this paper is to propose a method for the estimation of the gauging time interval for modern YSs. which could be used by any user. More specifically, the indispensable need for the TSs gauging is elevated and documented. All the parameters that influence their operation are registered. A model expressed by a scale of grades is defined, leading thus to an equation for the calculation of the time interval for the next needed gauging and calibration.展开更多
文摘The importance and complexity of prioritizing construction projects (PCP) in urban road network planning lead to the necessity to develop an aided decision making program (ADMP). Cost benefit ratio model and stage rolled method are chosen as the theoretical foundations of the program, and then benefit model is improved to accord with the actuality of urban traffic in China. Consequently, program flows, module functions and data structures are designed, and particularly an original data structure of road ...
文摘The application of multi-level fuzzy comprehensive appraisal on social effects of projects has been studied. The principles for setting up an index system have been analyzed and the index system has been set up according to projects of construction. Models for multi-level fuzzy comprehensive appraisal have been offered and relative calculation steps have been given according to project instances.
文摘Weak rock zone (soft interlayer, fault zone and soft rock) is the highlight of large-scale geological engineering research. It is an important boundary for analysis of rock mass stability. Weak rock zone has been formed in a long geological period, and in this period, various rocks have undergone long-term consolidation of geostatic stress and tectonic stress; therefore, under in-situ conditions, their density and modulus of deformation are relatively high. Due to its fragmentary nature, once being exposed to the earth's surface, the structure of weak rock zone will soon be loosened, its density will be reduced, and its modulus of deformation will also be reduced significantly. Generally, weak rock zone can be found in large construction projects, especially in the dam foundation rocks of hydropower stations. These rocks cannot be eliminated completely by excavation. Furthermore, all tests nowadays are carried out after the exposure of weak rock zone, modulus of deformation under in-situ conditions cannot be revealed. In this paper, a test method explored by the authors has been introduced. This method is a whole multilayered medium deformation method. It is unnecessary to eliminate the relatively complete rocks covering on weak rock zone. A theoretical formula to obtain the modulus of deformation in various mediums has also been introduced. On-site comparative trials and indoor deformation modulus tests under equivalent density conditions have been carried out. We adopted several methods for the prediction researches of the deformation modulus of weak rock zone under in-situ conditions, and revealed a fact that under in-situ conditions, the deformation modulus of weak rock zone are several times higher than the test results obtained after the exposure. In a perspective of geological engineering, the research findings have fundamentally changed peoples' concepts on the deformation modulus of weak rock zone, provided important theories and methods for precise definition of deformation modulus of deep weak rock zone under cap rock conditions, as well as for reasonable engineering applications.
文摘Cost estimation has its proven importance as one of essential factors for project success. The aim of this research is to predict the early project cost using neural network. Early project cost represents a key component in business unit decisions. The most important factors influencing on the parametric cost estimation in construction building projects in Gaza Strip were defined and investigated. A questionnaire survey and relative index ranking technique were used to conclude the most important factors. Fourteen most effective factors were identified. One hundred and six case studies from real executed construction project in Gaza Strip were collected for training and testing the model. The cases were prepared to be used in cost estimate neural networks model. Eighty percent of case studies were used to train and test the model. The remaining 20% was used for model verification. The results revealed the ability to the model to predict cost estimate to an acceptable degree of accuracy. The minimum squares error with 0.005 in training stage and 0.021 in testing stage were recorded.
文摘Today, most construction projects in urban environments are complex high-rise buildings that present unique challenges, including local building ordinances and restrictions, adjoining public and residential areas, narrow sidewalks and streets, and underground utilities, all of which require extensive planning and tight schedules. A major problem facing such projects is to formulate realistic schedules that will make it possible to meet contractual completion dates with limited resources and budgets. The scheduling software products currently used in construction projects, which include Primavera P6, Microsoft Project, etc., are not actually applied as a scheduling tool in practical construction projects, which instead generally depend on Microsoft Excel or a bar-chart. This is because the existing scheduling programs cannot provide more user-oriented schedule format such as representing two-way multiple overlapping relationships. To overcome this deficiency, the BDM (beeline diagramming method) is proposed as a new networking technique in 2010. But two-way multiple overlapping relationships generate the loop in a conventional schedule computation process. This paper addresses the loop phenomenon of two-way multiple overlapping relationships in a BDM network as well as proposes the solutions of them, and then presents a practical application of two-way multiple overlapping relationships at a real project.
文摘in recent years, as the project of our country is increasing, investment growth, put forward new challenges to investment in construction projects. Research from the research status of investment in construction, the implementation process in accordance with the construction project, followed by analysis of the construction project investment the currently existing problems, and puts forward the implementation of the project the whole process as the main line, to scientific decision-making, rational design, bidding, construction control standard and completion of review strategies as the core.
基金Acknowledgement: This project was financially supported by Hunan Provincial Natural Science Foundation of China (No. 09JJ6065) and Engineering Research Center of Road Disaster Prevention and Transportation Safety of Ministry of Education (No. k0080306).
文摘In this paper, highway-related human activities are defined as well as the human activities related to highway for keeping a normal production and livelihood. They include highway research, highway education, highway legislation, administration of justice of highway case and enforce the law, assessment, planning, design, construction and management, decision-making of highway projects. Therefore, highway-related human activities are not equal to construction of highway projects.
文摘After the completion of design, the construction project shall begin its implementation, which should be taken effective measures to strengthen the management of project cost and properly manage the funds to achieve the overall goal of the construction projects. Control of the project cost in the project implementation is mainly divided into bidding, contracting, construction and settlement. The following is the analysis and discussions of the author's experiences to the control of the project cost in the project implementation and the management measures.
文摘Approximately 331 million ha, one-third of China's total land, is prone to desertification processes, leading to natural disasters and economic losses. In this study, the situation, tendency, their influences and their risk governance of desertification and blown sand disaster in China were examined using satellite images, field photographs, field data and a literature review. The desiccated areas in Lop Nor and the lower Heihe River fluvial plain covered about 50,000 km2 and 40,000 km2, respectively. In Ejina, about 100 species of vegetation became extinct. The rate of wind erosion in China was between 1,000 tons/km2/year and 2,000 tons/km2/year. There were 12 sand deserts and sandy lands, occupying a total of 710,000 km2. Salinized soils occurred across 99.1 million ha. The two main sand and dust storm-prone areas in China were the Tarim Basin and its surroundings, and the Alxa Plateau and its surroundings. From 1981 to 2007, the annual average frequency of sand and dust storms varied from 1 d to 37 d with a general increase from southeast to northwest. Since 1978, China has implemented a number of ecological construction projects that have reduced desertification from 1999 to 2004 and from 2005 to 2009, and the number of dust and sand storm days from 9.3 d between 1954 and 1959 to 4.4 d between 2000 and 2007. The results could improve understanding of desertification and blown sand disasters in China and provide valuable experiences for global desertification control.
基金Supported by the Science Fund for Creative Research Groups of National Natural Science Foundation of China(No.51021004)Tianjin Research Program of Application Foundation and Advanced Technology(No.12JCZDJC29200)National Key Technology R and D Program in the 12th Five-Year Plan of China(No.2011BAB10B06)
文摘It is difficult to analyze the inter-relationship for the construction layout of a reservoir project scientifically and intuitively.According to the characteristics of broad field and huge information,the modeling methods of digital terrain and solid model as well as the techniques of texture mapping and scene navigation are adopted.The simulation system is developed by C program language,which includes the functions of the interactive navigation of 3D scene,the visual inquiry of project digital model information,the storage and management of project information.A certain reservoir is taken as a case.The 3D visual analysis for the construction layout and engineering information are obtained.The proposed system is of great advantages in dealing with large amount of information and the method provides a theoretical basis and technical support for the construction layout of a reservoir project.
文摘The paper systemizes standard methods of planning, monitoring and controlling the realization of construction works in civil engineering projects and overviews the implementation of the methods in Team Co Cakovec from Croatia. The specificities of the methods are shown through the different construction works projects. Also, paper reviews the implementation, modification and improvement of existing methods for planning, monitoring and controlling the realization of projects in Team Co.
文摘Selecting right equipment has been playing an important role in the success of construction projects. This paper presents a computer model, ESCMODEL, for equipment selection in Earth-fill dam projects. The proposed model is capable of assisting the users in making decisions to determine the size, number, type and schedule of presence of dozers, loaders, graders, excavators, trucks, sheepsfoot rollers and smooth wheel rollers. ESCMODEL can contribute to resolve this selection process through the application of an optimization technique, based on nonlinear programming. Three actual case studies of earth-fill dam projects are presented in order to illustrate the effectiveness and performance of the model.
文摘This research management, exp and lores preliminarily the practices of quality management, management commitment in quality quality management implementation problems in construction projects in the context of Malaysian construction industry. The research applies semi-structured interview approach with twelve project management practitioners. The findings of the study indicate that the state of quality management in construction projects in Malaysia needs to be strengthened and there are problems in relation to quality management implementation that require attention and further research. The paper provides an insight on the state of quality management in construction projects in Malaysia.
文摘With rapid development of PetroChina's Qinghai Oilfield, engineering construction quality becomes more and more important in infrastructure construction of the oilfield. Generally speaking, engineering construction quality is related both to national economic development and safety of people and assets. To turn a design map into a materialized object, the construction project involves a large number of elements, such as design, materials, machinery, landform, geological factors, meteorological factors, construction process, technological measures and supervision system. Therefore, quality control holds the key to a construction project.
文摘The modern TSs (total stations) have reached a very high level in the provided reading and reliability (accuracy and precision) of their measurements. The evolution of the digital technology has helped in this direction. Thus, the TSs can support all requirements for the stake out and monitoring of modern survey engineering and constructions projects. Their complicated manufacturing process and the sensitivity of their components require gauging, adjusting and calibration at certain time intervals. This appears to be the only way in order to assure the precision of measurements provided by the manufacturer and the reliability of the works they are used for. The goal of this paper is to propose a method for the estimation of the gauging time interval for modern YSs. which could be used by any user. More specifically, the indispensable need for the TSs gauging is elevated and documented. All the parameters that influence their operation are registered. A model expressed by a scale of grades is defined, leading thus to an equation for the calculation of the time interval for the next needed gauging and calibration.