In the design,construction and operation periods of the Three Gorges Project (TGP),great challenges have been met in different fields such as water resources and hydropower project construction,electromechanical equip...In the design,construction and operation periods of the Three Gorges Project (TGP),great challenges have been met in different fields such as water resources and hydropower project construction,electromechanical equipment manufacture and ecological environment protection.In view of the key techniques and difficulties in the construction period,scientific and technological breakthroughs have been made by the experts and scholars of various fields and a series of innovative achievements are gained,which make the scientific and technological levels in relevant fields improved.Some major innovative achievements in the construction and operation of TGP are enumerated,which are significant for the hydropower project construction and clean energy development in the future in China.展开更多
The paper provides an insight into key engineering aspects of Kuwait Oil Company's existing projects, facilities and equipment both current and from nearly 30 years of projects development. It deals with engineering ...The paper provides an insight into key engineering aspects of Kuwait Oil Company's existing projects, facilities and equipment both current and from nearly 30 years of projects development. It deals with engineering features of mainly process and mechanical equipment, both static and rotating besides others, used for collection, separation, desalting, heat transfer, chemical treatment, storage, transmission, pipelines and similar facilities utilized for upstream oil and gas production, both sweet and sour. Engineering highlights include certain technological developments, metallurgical aspects, few best practices and lessons learnt as well. Seven (7) case studies are included towards the end that show case some of the engineering aspects of facility equipment, lessons learned from their engineering and conclusions drawn that, emphasize the need to focus on initial, preliminary engineering aspects of projects and could provide useful tips for oil and gas engineers and designers.展开更多
文摘In the design,construction and operation periods of the Three Gorges Project (TGP),great challenges have been met in different fields such as water resources and hydropower project construction,electromechanical equipment manufacture and ecological environment protection.In view of the key techniques and difficulties in the construction period,scientific and technological breakthroughs have been made by the experts and scholars of various fields and a series of innovative achievements are gained,which make the scientific and technological levels in relevant fields improved.Some major innovative achievements in the construction and operation of TGP are enumerated,which are significant for the hydropower project construction and clean energy development in the future in China.
文摘The paper provides an insight into key engineering aspects of Kuwait Oil Company's existing projects, facilities and equipment both current and from nearly 30 years of projects development. It deals with engineering features of mainly process and mechanical equipment, both static and rotating besides others, used for collection, separation, desalting, heat transfer, chemical treatment, storage, transmission, pipelines and similar facilities utilized for upstream oil and gas production, both sweet and sour. Engineering highlights include certain technological developments, metallurgical aspects, few best practices and lessons learnt as well. Seven (7) case studies are included towards the end that show case some of the engineering aspects of facility equipment, lessons learned from their engineering and conclusions drawn that, emphasize the need to focus on initial, preliminary engineering aspects of projects and could provide useful tips for oil and gas engineers and designers.