Taking the construction of PPP project of Guangzhou North Railway Station Comprehensive Transportation Hub as an example,the related measures of construction project quality management and cost control are discussed i...Taking the construction of PPP project of Guangzhou North Railway Station Comprehensive Transportation Hub as an example,the related measures of construction project quality management and cost control are discussed in detail,and it is hoped to have reference.展开更多
The double-line five-step ship-lock of Three Gorges Project (TGP) is an extra-large navigation structure with the maximum design total head and single-step delivery head in the world and complicated technical problems...The double-line five-step ship-lock of Three Gorges Project (TGP) is an extra-large navigation structure with the maximum design total head and single-step delivery head in the world and complicated technical problems.The shiplock is a challenging and world-class project integrating the advanced techniques and equipment,the up-to-date technologies and materials,as well as the advanced project management.Through 17-year construction and 9-year operation of the ship-lock,various difficulties in design,construction,equipment manufacturing and installation as well as system debugging have been overcome effectively.The project management ideas,management system,management methods,technological innovation and team building are summarized according to the management practice of the second stage main work of Three Gorges ship-lock.展开更多
The turn-key construction project is implemented in Taiwan not by a single company but by a make-shift group of several companies. Hence,problems to coordinate the professional construction management (PCM) and the su...The turn-key construction project is implemented in Taiwan not by a single company but by a make-shift group of several companies. Hence,problems to coordinate the professional construction management (PCM) and the supervising architectural company often occur for the lack of long-term experience to work together. The various factors that affect the implementation of turn-key projects currently practiced in Taiwan are analyzed using the analytic network process (ANP). The objective is to study how the twelve key factors in the four layers of "Role assignment","Signing contract","Operational procedures" and "Losing capital investment" affect the progress of implementing the turn-key project in Taiwan. The results reveal that "Delay in payment" has the most negative influence with 15.62% weighing factor; "Latent risk" comes next with 11.14% weighing factor,and "Responsibility of construction company for project quality" is the third with 10.79% weighing factor.展开更多
Engineering project management refers to the management through the whole process of engineering construction, including quality, time project time limit, safety, cost, environmental protection, and innovation, etc. T...Engineering project management refers to the management through the whole process of engineering construction, including quality, time project time limit, safety, cost, environmental protection, and innovation, etc. The most important thing for construction enterprises to improve market competitiveness is to reduce enterprise costs by decreasing resource consumption in the construction, and control the consumptions within the project budget.展开更多
According to the actual requirement of project management on BIM application, the paper presents a new the overall implementation scheme and system architecture based on BIM project management. This paper established ...According to the actual requirement of project management on BIM application, the paper presents a new the overall implementation scheme and system architecture based on BIM project management. This paper established the engineering project management process that suitable for the situation of our country, design the organizational structure and verified the rationality through the example simulation based on the study of ideological characteristics of BIM combined with the modem project management theory and method. The research results has a certain theory reference value in our implementation and project management to improve the level of BIM information integration.展开更多
Managing a large-scale distributed engineering project needs skilled, motivated and committed personnel. Unified and aligned working methods are needed. Project alignment is the process of ensuring that key stakeholde...Managing a large-scale distributed engineering project needs skilled, motivated and committed personnel. Unified and aligned working methods are needed. Project alignment is the process of ensuring that key stakeholders share a common understanding of the project mission, goals, objectives, tactics, work processes and plans and have the required competences and skills. Based on current advances in the area of collaborative networked organizations, project management and Internet web 2.0 technologies, the authors have identified further needs and opportunities for development in the area of Collaborative Project Management. The Project Alignment Booster is a set of software services used to promote collaborative project management. The tool has been developed to suit industrial requirements in the area of large and complicated engineering project management, The paper reports the results of developing a toolkit to support collaborative project alignment.展开更多
How projects should be organized and managed are two important aspects of the role that Project Managers perform and the processes involved can be linked to the measurement of the project management outcome. Recent st...How projects should be organized and managed are two important aspects of the role that Project Managers perform and the processes involved can be linked to the measurement of the project management outcome. Recent studies indicate that these processes are not implemented and concerns have been raised. The authors present an investigation into the current practices of the three soft project management subject matters of selecting project team members, structuring the teams and the management style followed in the construction industry in UK and their reflection upon the project management outcome. The results confirm the concerns raised and indicate that the current levels of implementation by practitioners delivers only acceptable as opposed to successful level of project management outcome. The findings call for a reconsideration of the approach taken when deciding how to organize and manage project teams and a redress towards improving project management outcome.展开更多
Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face...Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face a more complex competitive environment and more powerful competitors. In order to compete for the market and living space, Enterprises should be in a strategic height, cultivate long- term competitive advantage. Cost management is a new tool to enhance the competitiveness of enterprises, Popularization and application of Construction project management to the scientific development of the project management made the following three aspects urgent requirement. First. establish a scientific system for the construction project management. Construction Project Management knowledge system is the foundation and needs for Construction Project Management scientific and professional.展开更多
Because of the discrepancy of project types,the project progress curves present different characteristics.Studying project progress curves can reduce management risk of project and overall grasp the enforcement condit...Because of the discrepancy of project types,the project progress curves present different characteristics.Studying project progress curves can reduce management risk of project and overall grasp the enforcement condition of the project.Combining project characteristic,this paper reaches 4 kinds of project progress curve patterns.If the front of the progress curve is concave,and its rear is protruding in the break point,it is named as S model.If its front is protruding and its rear is concave in the break point,it is named as the reverse side of S model.If the front and rear are concave in the break point,it is named as J model,and two half sections are both upward protruding,it is named as the reverse side of J model.Through a case study,it shows that application project progress curve model can better raise project management.展开更多
In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management ...In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management of the contract, can promote the reasonable and balanced investment cost allocation in the quality and safety and other aspects of the project, so that the construction project can obtain higher added value, and to further promote China' s economic construction and accelerate the pace of the city. This paper first briefly elaborates our construction project cost of the contract management on the present situation, and some problems are analyzed and discussed, and then puts forward some suggestions on the measures and countermeasures for cost management of construction engineering contract.展开更多
Public bidding is the international current practice to contract construction project. But the decision on the bidding often is made according to the qualitative evaluation based on the subjective opinion of specialis...Public bidding is the international current practice to contract construction project. But the decision on the bidding often is made according to the qualitative evaluation based on the subjective opinion of specialists. Therefore, the fuzzy mathematics principle was applied and a synthetic evaluation model was established to provide an effective method for the development of quantitative bidding decision in this paper.展开更多
Based on the study of supply chain(SC) and SC optimization in engineering projects, a mixed integer nonlinear programming(MINLP) optimization model is developed to minimize the total SC cost for international petroche...Based on the study of supply chain(SC) and SC optimization in engineering projects, a mixed integer nonlinear programming(MINLP) optimization model is developed to minimize the total SC cost for international petrochemical engineering projects. A steam cracking project is selected and analyzed, from which typical SC characteristics in international engineering projects in the area of petrochemical industry are summarized. The MINLP model is therefore developed and applied to projects with detailed data. The optimization results are analyzed and compared by the MINLP model, indicating that they are appropriate to SC management practice in engineering projects, and are consistent with the optimal priceeffective strategy in procurement. As a result, the model could provide useful guidance to SC optimization of international engineering projects in petrochemical industry, and improve SC management by selecting more reliable and qualified partner enterprises in SC for the project.展开更多
Building engineering management is a huge and complex work, which the key to ensure the quality ofconstruction projects. With the rapid development of the domestic construction industry, the traditional engineering ma...Building engineering management is a huge and complex work, which the key to ensure the quality ofconstruction projects. With the rapid development of the domestic construction industry, the traditional engineering management model can not meet the needs of a large number of construction project information exchanges. Only realizing informationization of construction engineering management, can reduce the cost of construction projects, improve the efficiency of project management and construction progress. This paper analyzes the current situation of construction management informatization, and puts forward some suggestions to strengthen the construction management information construction.展开更多
This research management, exp and lores preliminarily the practices of quality management, management commitment in quality quality management implementation problems in construction projects in the context of Malaysi...This research management, exp and lores preliminarily the practices of quality management, management commitment in quality quality management implementation problems in construction projects in the context of Malaysian construction industry. The research applies semi-structured interview approach with twelve project management practitioners. The findings of the study indicate that the state of quality management in construction projects in Malaysia needs to be strengthened and there are problems in relation to quality management implementation that require attention and further research. The paper provides an insight on the state of quality management in construction projects in Malaysia.展开更多
After the completion of design, the construction project shall begin its implementation, which should be taken effective measures to strengthen the management of project cost and properly manage the funds to achieve t...After the completion of design, the construction project shall begin its implementation, which should be taken effective measures to strengthen the management of project cost and properly manage the funds to achieve the overall goal of the construction projects. Control of the project cost in the project implementation is mainly divided into bidding, contracting, construction and settlement. The following is the analysis and discussions of the author's experiences to the control of the project cost in the project implementation and the management measures.展开更多
文摘Taking the construction of PPP project of Guangzhou North Railway Station Comprehensive Transportation Hub as an example,the related measures of construction project quality management and cost control are discussed in detail,and it is hoped to have reference.
文摘The double-line five-step ship-lock of Three Gorges Project (TGP) is an extra-large navigation structure with the maximum design total head and single-step delivery head in the world and complicated technical problems.The shiplock is a challenging and world-class project integrating the advanced techniques and equipment,the up-to-date technologies and materials,as well as the advanced project management.Through 17-year construction and 9-year operation of the ship-lock,various difficulties in design,construction,equipment manufacturing and installation as well as system debugging have been overcome effectively.The project management ideas,management system,management methods,technological innovation and team building are summarized according to the management practice of the second stage main work of Three Gorges ship-lock.
文摘The turn-key construction project is implemented in Taiwan not by a single company but by a make-shift group of several companies. Hence,problems to coordinate the professional construction management (PCM) and the supervising architectural company often occur for the lack of long-term experience to work together. The various factors that affect the implementation of turn-key projects currently practiced in Taiwan are analyzed using the analytic network process (ANP). The objective is to study how the twelve key factors in the four layers of "Role assignment","Signing contract","Operational procedures" and "Losing capital investment" affect the progress of implementing the turn-key project in Taiwan. The results reveal that "Delay in payment" has the most negative influence with 15.62% weighing factor; "Latent risk" comes next with 11.14% weighing factor,and "Responsibility of construction company for project quality" is the third with 10.79% weighing factor.
文摘Engineering project management refers to the management through the whole process of engineering construction, including quality, time project time limit, safety, cost, environmental protection, and innovation, etc. The most important thing for construction enterprises to improve market competitiveness is to reduce enterprise costs by decreasing resource consumption in the construction, and control the consumptions within the project budget.
文摘According to the actual requirement of project management on BIM application, the paper presents a new the overall implementation scheme and system architecture based on BIM project management. This paper established the engineering project management process that suitable for the situation of our country, design the organizational structure and verified the rationality through the example simulation based on the study of ideological characteristics of BIM combined with the modem project management theory and method. The research results has a certain theory reference value in our implementation and project management to improve the level of BIM information integration.
文摘Managing a large-scale distributed engineering project needs skilled, motivated and committed personnel. Unified and aligned working methods are needed. Project alignment is the process of ensuring that key stakeholders share a common understanding of the project mission, goals, objectives, tactics, work processes and plans and have the required competences and skills. Based on current advances in the area of collaborative networked organizations, project management and Internet web 2.0 technologies, the authors have identified further needs and opportunities for development in the area of Collaborative Project Management. The Project Alignment Booster is a set of software services used to promote collaborative project management. The tool has been developed to suit industrial requirements in the area of large and complicated engineering project management, The paper reports the results of developing a toolkit to support collaborative project alignment.
文摘How projects should be organized and managed are two important aspects of the role that Project Managers perform and the processes involved can be linked to the measurement of the project management outcome. Recent studies indicate that these processes are not implemented and concerns have been raised. The authors present an investigation into the current practices of the three soft project management subject matters of selecting project team members, structuring the teams and the management style followed in the construction industry in UK and their reflection upon the project management outcome. The results confirm the concerns raised and indicate that the current levels of implementation by practitioners delivers only acceptable as opposed to successful level of project management outcome. The findings call for a reconsideration of the approach taken when deciding how to organize and manage project teams and a redress towards improving project management outcome.
文摘Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face a more complex competitive environment and more powerful competitors. In order to compete for the market and living space, Enterprises should be in a strategic height, cultivate long- term competitive advantage. Cost management is a new tool to enhance the competitiveness of enterprises, Popularization and application of Construction project management to the scientific development of the project management made the following three aspects urgent requirement. First. establish a scientific system for the construction project management. Construction Project Management knowledge system is the foundation and needs for Construction Project Management scientific and professional.
文摘Because of the discrepancy of project types,the project progress curves present different characteristics.Studying project progress curves can reduce management risk of project and overall grasp the enforcement condition of the project.Combining project characteristic,this paper reaches 4 kinds of project progress curve patterns.If the front of the progress curve is concave,and its rear is protruding in the break point,it is named as S model.If its front is protruding and its rear is concave in the break point,it is named as the reverse side of S model.If the front and rear are concave in the break point,it is named as J model,and two half sections are both upward protruding,it is named as the reverse side of J model.Through a case study,it shows that application project progress curve model can better raise project management.
文摘In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management of the contract, can promote the reasonable and balanced investment cost allocation in the quality and safety and other aspects of the project, so that the construction project can obtain higher added value, and to further promote China' s economic construction and accelerate the pace of the city. This paper first briefly elaborates our construction project cost of the contract management on the present situation, and some problems are analyzed and discussed, and then puts forward some suggestions on the measures and countermeasures for cost management of construction engineering contract.
文摘Public bidding is the international current practice to contract construction project. But the decision on the bidding often is made according to the qualitative evaluation based on the subjective opinion of specialists. Therefore, the fuzzy mathematics principle was applied and a synthetic evaluation model was established to provide an effective method for the development of quantitative bidding decision in this paper.
文摘Based on the study of supply chain(SC) and SC optimization in engineering projects, a mixed integer nonlinear programming(MINLP) optimization model is developed to minimize the total SC cost for international petrochemical engineering projects. A steam cracking project is selected and analyzed, from which typical SC characteristics in international engineering projects in the area of petrochemical industry are summarized. The MINLP model is therefore developed and applied to projects with detailed data. The optimization results are analyzed and compared by the MINLP model, indicating that they are appropriate to SC management practice in engineering projects, and are consistent with the optimal priceeffective strategy in procurement. As a result, the model could provide useful guidance to SC optimization of international engineering projects in petrochemical industry, and improve SC management by selecting more reliable and qualified partner enterprises in SC for the project.
文摘Building engineering management is a huge and complex work, which the key to ensure the quality ofconstruction projects. With the rapid development of the domestic construction industry, the traditional engineering management model can not meet the needs of a large number of construction project information exchanges. Only realizing informationization of construction engineering management, can reduce the cost of construction projects, improve the efficiency of project management and construction progress. This paper analyzes the current situation of construction management informatization, and puts forward some suggestions to strengthen the construction management information construction.
文摘This research management, exp and lores preliminarily the practices of quality management, management commitment in quality quality management implementation problems in construction projects in the context of Malaysian construction industry. The research applies semi-structured interview approach with twelve project management practitioners. The findings of the study indicate that the state of quality management in construction projects in Malaysia needs to be strengthened and there are problems in relation to quality management implementation that require attention and further research. The paper provides an insight on the state of quality management in construction projects in Malaysia.
文摘After the completion of design, the construction project shall begin its implementation, which should be taken effective measures to strengthen the management of project cost and properly manage the funds to achieve the overall goal of the construction projects. Control of the project cost in the project implementation is mainly divided into bidding, contracting, construction and settlement. The following is the analysis and discussions of the author's experiences to the control of the project cost in the project implementation and the management measures.