期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
某工程板块争取稳定工作量的思考
1
作者 张杰 王在峰 《中国高新技术企业》 2017年第1期176-177,共2页
文章对为什么要争取稳定工作量、哪些是长期稳定的工作量、如何争取长期稳定的工作量进行了讨论分析,重点就基础观测、观测分析、工程服务、工程测量、工程评价5个专业进行了分门别类的探讨,在对未来如何争取工作量方面提出了建设性意见。
关键词 稳定工作量 工作量争取 业务发展 业务投入 工程板块
下载PDF
科学规划 内外兼顾 多措并举 以工作量稳定推进油田科学发展
2
作者 刘明亮 《内蒙古石油化工》 CAS 2008年第10期61-62,共2页
工作量稳定是油田整体发展的内在需求,是油气产量稳定的必要手段和保障措施。必须深刻认识和科学把握"工作量稳定"在油田发展中的重要作用,内外兼顾,多措并举,统筹发展,确保工作量长期稳定。
关键词 工作量稳定 存续经济 保障措施
下载PDF
Patterns and security technologies for co-extraction of coal and gas in deep mines without entry pillars 被引量:5
3
作者 Nong Zhang Fei Xue Nianchao Zhang Xiaowei Feng 《International Journal of Coal Science & Technology》 EI 2015年第1期66-75,共10页
Retaining gob-side entryways and the stability of gas drainage boreholes are two essential techniques in the co-extraction of coal and gas without entry pillars (CECGWEP). However, retained entryways located in deep... Retaining gob-side entryways and the stability of gas drainage boreholes are two essential techniques in the co-extraction of coal and gas without entry pillars (CECGWEP). However, retained entryways located in deep coal mines are hard to maintain, especially for constructing boreholes in confined spaces, owing to major deformations. Consequently, it is difficult to drill boreholes and maintain their stability, which therefore cannot guarantee the effectiveness of gas drainage. This paper presents three measures for conducting CECGWEP in deep mines on the basis of effective space in retained entryways for gas drainage, They are combinations of retaining roadways and face-lagging inclined boreholes, retaining roadways and face-advancing inclined boreholes, and retaining roadways and high return airway inclined boreholes. Several essential techniques are suggested to improve the maintenance of retained entryways and the stabilization of boreholes. For the particular cases considered in this study, two field trials have verified the latter two measures from the results obtained from the faces 1111(1) and 11112(1) in the Zhuji Mine. The results indicate that these models can effectively solve the problems in deep mines. The maximum gas drainage flow for a single hole can reach 8.1 m^3/min and the effective drainage distance can be extended up to 150 m or more. 展开更多
关键词 Retaining gob-side entryways Stability of borehole Gas pressure relief Co-extraction of coal and gas without the entry pillar
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部