A laser technique based scanning system was employed to make a comprehensive scanning through borehole forunmapped cavity under open pit bench,then the three-dimensional data will be obtained,and these data were used ...A laser technique based scanning system was employed to make a comprehensive scanning through borehole forunmapped cavity under open pit bench,then the three-dimensional data will be obtained,and these data were used for theoreticalanalysis and numerical simulation to analyze the stability of cap rock.Acoustic emission techniques were also adopted to carry outlong term real time rupture monitoring in cap rock.Therefore,a complete safety evaluation system for the cap rock was establishedto ensure safe operation of subsequent blasting processes.The ideal way of eliminating collapse hazard of such cavity is cap rockcaving through deep-hole blasting,thus,two deep-hole blasting schemes named as vertical deep-hole blasting scheme and one-timeraise driving integrated with deep-hole bench blasting scheme were proposed.The vertical deep-hole blasting scheme has moreexplosive consumption,but the relatively simple blasting net work structure can greatly reduce workloads.However,the one-timeraise driving integrated with deep-hole bench blasting scheme can obviously reduce explosive consumption,but the higher technicalrequirements on drilling,explosive charging and blasting network will increase workloads.展开更多
This paper outlines the results obtained from real time microseismic monitoring of an opencast coal mine in South India.The objective of the study is to investigate the stress changes within the rockmass along the slo...This paper outlines the results obtained from real time microseismic monitoring of an opencast coal mine in South India.The objective of the study is to investigate the stress changes within the rockmass along the slope due to underground mine development operation and their impact on the stability of the highwall slope.The installed microseismic systems recorded the seismic triggerings down toà2 moment magnitude.In general,most of the events recorded during the monitoring period are weak in seismic energy.The study adopts a simple and more reliable tool to characterize the seismically active zone for assessing the stability of the highwall in real time.The impact of underground working on the slope is studied on the basis of the seismic event impact contours and seismic clusters.During the monitoring period,it is observed that the intensity of the overall microseismic activity along the slope due to the mine development operations did not cause any adverse impact on the highwall stability.展开更多
Aiming at evaluating the stability of a rock mass near a fault,a microseismic(MS) monitoring system was established in Hongtoushan copper mine.The distribution of displacement and log(/),the relationship between MS ac...Aiming at evaluating the stability of a rock mass near a fault,a microseismic(MS) monitoring system was established in Hongtoushan copper mine.The distribution of displacement and log(/),the relationship between MS activity and the exploitation process,and the stability of the rock mass controlled by a fault were studied.The results obtained from microseismic data showed that MS events were mainly concentrated al the footwall of the fault.When the distance to the fault exceeded 20 m,the rock mass reached a relatively stable state.MS activity is closely related to the mining process.Under the strong disturbance from blasting,the initiation and propagation of cracks is much faster.MS activity belongs in the category of aftershocks after large scale excavation.The displacement and log(C/) obtained from MS events can reflect the difference in physical and mechanical behavior of different areas within the rock mass,which is useful in judging the integrity and degradation of the rock mass.展开更多
Slope stability estimation is an engineering problem that involves several parameters. To address these problems, a hybrid model based on the combination of support vector machine(SVM) and particle swarm optimization(...Slope stability estimation is an engineering problem that involves several parameters. To address these problems, a hybrid model based on the combination of support vector machine(SVM) and particle swarm optimization(PSO) is proposed in this study to improve the forecasting performance. PSO was employed in selecting the appropriate SVM parameters to enhance the forecasting accuracy. Several important parameters, including the magnitude of unit weight, cohesion, angle of internal friction, slope angle, height, pore water pressure coefficient, were used as the input parameters, while the status of slope was the output parameter. The results show that the PSO-SVM is a powerful computational tool that can be used to predict the slope stability.展开更多
基金Projects(51204206,41272304,41372278) supported by the National Natural Science Foundation of China
文摘A laser technique based scanning system was employed to make a comprehensive scanning through borehole forunmapped cavity under open pit bench,then the three-dimensional data will be obtained,and these data were used for theoreticalanalysis and numerical simulation to analyze the stability of cap rock.Acoustic emission techniques were also adopted to carry outlong term real time rupture monitoring in cap rock.Therefore,a complete safety evaluation system for the cap rock was establishedto ensure safe operation of subsequent blasting processes.The ideal way of eliminating collapse hazard of such cavity is cap rockcaving through deep-hole blasting,thus,two deep-hole blasting schemes named as vertical deep-hole blasting scheme and one-timeraise driving integrated with deep-hole bench blasting scheme were proposed.The vertical deep-hole blasting scheme has moreexplosive consumption,but the relatively simple blasting net work structure can greatly reduce workloads.However,the one-timeraise driving integrated with deep-hole bench blasting scheme can obviously reduce explosive consumption,but the higher technicalrequirements on drilling,explosive charging and blasting network will increase workloads.
基金the S&T project ‘‘High resolution microseismic monitoring for early detection and analysis of slope failure in opencast mines’’ funded by inistry of Coal,Government of IndiaThe Singareni Collieries Co Ltd (SCCL),Andhra Pradesh
文摘This paper outlines the results obtained from real time microseismic monitoring of an opencast coal mine in South India.The objective of the study is to investigate the stress changes within the rockmass along the slope due to underground mine development operation and their impact on the stability of the highwall slope.The installed microseismic systems recorded the seismic triggerings down toà2 moment magnitude.In general,most of the events recorded during the monitoring period are weak in seismic energy.The study adopts a simple and more reliable tool to characterize the seismically active zone for assessing the stability of the highwall in real time.The impact of underground working on the slope is studied on the basis of the seismic event impact contours and seismic clusters.During the monitoring period,it is observed that the intensity of the overall microseismic activity along the slope due to the mine development operations did not cause any adverse impact on the highwall stability.
基金financially supported by Projects of the National Key Technology R&D Program of China(Nos.2013BAB02B01 and2013BAB02B03)the National Natural Science Foundation of China(Nos.51274055 and 51204030)+1 种基金the Fundamental Research Funds for the Central University of China(Nos.N130401006,N120801002 and N120701001)the Key Science&Technology Special Project of Third Five-Year Plan of MCC(No.0012012009)
文摘Aiming at evaluating the stability of a rock mass near a fault,a microseismic(MS) monitoring system was established in Hongtoushan copper mine.The distribution of displacement and log(/),the relationship between MS activity and the exploitation process,and the stability of the rock mass controlled by a fault were studied.The results obtained from microseismic data showed that MS events were mainly concentrated al the footwall of the fault.When the distance to the fault exceeded 20 m,the rock mass reached a relatively stable state.MS activity is closely related to the mining process.Under the strong disturbance from blasting,the initiation and propagation of cracks is much faster.MS activity belongs in the category of aftershocks after large scale excavation.The displacement and log(C/) obtained from MS events can reflect the difference in physical and mechanical behavior of different areas within the rock mass,which is useful in judging the integrity and degradation of the rock mass.
文摘Slope stability estimation is an engineering problem that involves several parameters. To address these problems, a hybrid model based on the combination of support vector machine(SVM) and particle swarm optimization(PSO) is proposed in this study to improve the forecasting performance. PSO was employed in selecting the appropriate SVM parameters to enhance the forecasting accuracy. Several important parameters, including the magnitude of unit weight, cohesion, angle of internal friction, slope angle, height, pore water pressure coefficient, were used as the input parameters, while the status of slope was the output parameter. The results show that the PSO-SVM is a powerful computational tool that can be used to predict the slope stability.