A series of 2D model tests were conducted to assess the foundation stability of composite vertical breakwaters. In this paper, the results from the experimental study are presented conjointly with a formula to estimat...A series of 2D model tests were conducted to assess the foundation stability of composite vertical breakwaters. In this paper, the results from the experimental study are presented conjointly with a formula to estimate the stability number of foundation, which is the most important parameter for evaluation of foundation stability of such structures. The influences of wave height, wave period and the berm width on the stability of compo^ite breakwaters with different armor stone sizes were investigated. Forty-five tests were performed to cover the influences of these parameters. According to the present research, berm width is a significant parameter concerning erosion of armor foundation. As the berm width increases, the amount of berm erosion decreases. Comparisons are made between results of present study and the estimated stability number proposed by Kimura et al. (1994), which is extension of Tanimoto formula. Results show that the later formula underestimates the stability number. However, by applying an enhancement factor about 1.7 meters to Kimura et al. formula, results correlated with the present experimental results..展开更多
The rigid body limit equilibrium method(RBLEM) and finite element method(FEM) are two widely used approaches for rock slope's stability analysis currently. RBLEM introduced plethoric assumptions; while traditional...The rigid body limit equilibrium method(RBLEM) and finite element method(FEM) are two widely used approaches for rock slope's stability analysis currently. RBLEM introduced plethoric assumptions; while traditional FEM relied on artificial factors when determining factor of safety(FOS) and sliding surfaces. Based on the definition of structure instability that an elasto-plastic structure is not stable if it is unable to satisfy simultaneously equilibrium condition, kinematical admissibility and constitutive equations under given external loads, deformation reinforcement theory(DRT) is developed. With this theory, plastic complementary energy(PCE) can be used to evaluate the overall stability of rock slope, and the unbalanced force beyond the yield surface could be the identification of local failure. Compared with traditional slope stability analysis approaches, the PCE norm curve to strength reduced factor is introduced and the unbalanced force is applied to the determination of key sliding surfaces and required reinforcement. Typical and important issues in rock slope stability are tested in TFINE(a three-dimensional nonlinear finite element program), which is further applied to several representatives of high rock slope's stability evaluation and reinforcement engineering practice in southwest of China.展开更多
The geometry of a landslide dam is an important component of evaluating dam stability.However,the geometry of a natural dam commonly cannot be obtained immediately with field investigations due to their remote locatio...The geometry of a landslide dam is an important component of evaluating dam stability.However,the geometry of a natural dam commonly cannot be obtained immediately with field investigations due to their remote locations.A rapid evaluation model is presented to estimate the geometries of natural dams based on the slope of the stream,volume of landslides,and the properties of the deposit.The proposed model uses high resolution satellite images to determine the geometry of the landside dam.These satellite images are the basic information to a preliminary stability analysis of a natural dam.This study applies the proposed method to two case studies in Taiwan.One is the earthquakeinduced Lung-Chung landslide dam in Taitung,and the second is the rainfall-induced Shih-Wun landslide dam in Pingtung.展开更多
A reasonable unsupported roof distance(URD) when advancing underground coal mine roadways can contribute greatly to safe and rapid roadway development.A mechanical model of the roof,using the relationship between the ...A reasonable unsupported roof distance(URD) when advancing underground coal mine roadways can contribute greatly to safe and rapid roadway development.A mechanical model of the roof,using the relationship between the roof stress distribution and URD,obtained by the difference method,and roof stability according to the in-situ roof stress and rock mass strength was developed.We subsequently designed a proper range of URD,developed a testing method of URD with the function of mining protection,evaluated roof stability through analyzing the test data and then determined a reasonable URD.Considering the factors of the geological conditions,the immediate roof stability and the efficiency of the labor arrangement system,the URD of the advancing roadway of 9802 working face in Zhangshuanglou coal mine was determined to be 6 m using the proposed method.The results show that,when a 2 m length of roadway was reinforced by temporary support and high pre-stressed bolt support after the roadway advancement of 6 m per cycle,the speed and the security of the roadway development can be achieved and the advance rate can reach more than 400 m per month.展开更多
traditional In this paper, two drawbacks pseudo-static method (vertical of the slice method) in the slope stability evaluation have been studied. First, the sliding mass is divided into vertical slices according to...traditional In this paper, two drawbacks pseudo-static method (vertical of the slice method) in the slope stability evaluation have been studied. First, the sliding mass is divided into vertical slices according to this method, which is irrational to some extent in the seismic design of slope. Second, only peak ground acceleration (PGA) is considered, and the effects of shaking frequency and duration on slope stability are neglected. And then, based on the theory of elastic wave and the summarized geological model, this paper put forwards an improved method of pseudo-method by using the theory of elastic wave and Hilbert-Huang transform. The improved pseudostatic method gives reasonable considerations to the time-frequency effects of seismic wave and its rationality has been verified by the shaking table test. This method can evaluate the safety of a slope, the happening time and the scale of landslides. At the same time, this method also can improve the high accuracy of the evaluation of the safety of the slope.展开更多
Mass movements are very common problems in the eastern Black Sea region of Turkey due to its climate conditions, geological, and geomorphological characteristics. High slope angle, weathering, dense rainfalls, and ant...Mass movements are very common problems in the eastern Black Sea region of Turkey due to its climate conditions, geological, and geomorphological characteristics. High slope angle, weathering, dense rainfalls, and anthropogenic impacts are generally reported as the most important triggering factors in the region. Following the portal slope excavations in the entrance section of Cankurtaran tunnel, located in the region, where the highly weathered andesitic tuff crops out, a circular toe failure occurred. The main target of the present study is to investigate the causes and occurrence mechanism of this failure and to determine the feasible remedial measures against it using finite element method(FEM) in four stages. These stages are slope stability analyses for pre-and postexcavation cases, and remediation design assessments for slope and tunnel. The results of the FEM-SSR analyses indicated that the insufficient initial support design and weathering of the andesitic tuffs are the main factors that caused the portal failure. After installing a rock retaining wall with jet grout columns and reinforced slope benching applications, the factor of safety increased from 0.83 to 2.80. In addition toslope stability evaluation, the Rock Mass Rating(RMR), Rock Mass Quality(Q) and New Austrian Tunneling Method(NATM) systems were also utilized as empirical methods to characterize the tunnel ground and to determine the tunnel support design. The performance of the suggested empirical support design, induced stress distributions and deformations were analyzed by means of numerical modelling. Finally, it was concluded that the recommended stabilization technique was essential for the dynamic long-term stability and prevents the effects of failure. Additionally, the FEM method gives useful and reasonably reliable results in evaluating the stability of cut slopes and tunnels excavated both in continuous and discontinuous rock masses.展开更多
Under the combined influences of special topography and the long term mining in Nanfen Open Pit Iron Mine, many large scale landslide masses appeared in heading side of stope, and tens of millions of iron mine is buri...Under the combined influences of special topography and the long term mining in Nanfen Open Pit Iron Mine, many large scale landslide masses appeared in heading side of stope, and tens of millions of iron mine is buried underside, making great economic losses. In order to guide the safety mining and increase the supply quantity, this paper through the use of MSARMA-method and the ''MSARMA evaluation and analytical system for slope stability analysis'' based on this method, which aimed at the quantitative evaluating of the slope stability before and after the actual mining below the slip mass, and the sensitivity analysis for the main influencing factor, providing scientific proof for the parameter optimization of open mine surface slope, the security and sustainable exploitation.展开更多
文摘A series of 2D model tests were conducted to assess the foundation stability of composite vertical breakwaters. In this paper, the results from the experimental study are presented conjointly with a formula to estimate the stability number of foundation, which is the most important parameter for evaluation of foundation stability of such structures. The influences of wave height, wave period and the berm width on the stability of compo^ite breakwaters with different armor stone sizes were investigated. Forty-five tests were performed to cover the influences of these parameters. According to the present research, berm width is a significant parameter concerning erosion of armor foundation. As the berm width increases, the amount of berm erosion decreases. Comparisons are made between results of present study and the estimated stability number proposed by Kimura et al. (1994), which is extension of Tanimoto formula. Results show that the later formula underestimates the stability number. However, by applying an enhancement factor about 1.7 meters to Kimura et al. formula, results correlated with the present experimental results..
基金Project(51479097)supported by the National Natural Science Foundation of ChinaProject(2013-KY-2)supported by State Key Laboratory of Hydroscience and Hydraulic Engineering,China
文摘The rigid body limit equilibrium method(RBLEM) and finite element method(FEM) are two widely used approaches for rock slope's stability analysis currently. RBLEM introduced plethoric assumptions; while traditional FEM relied on artificial factors when determining factor of safety(FOS) and sliding surfaces. Based on the definition of structure instability that an elasto-plastic structure is not stable if it is unable to satisfy simultaneously equilibrium condition, kinematical admissibility and constitutive equations under given external loads, deformation reinforcement theory(DRT) is developed. With this theory, plastic complementary energy(PCE) can be used to evaluate the overall stability of rock slope, and the unbalanced force beyond the yield surface could be the identification of local failure. Compared with traditional slope stability analysis approaches, the PCE norm curve to strength reduced factor is introduced and the unbalanced force is applied to the determination of key sliding surfaces and required reinforcement. Typical and important issues in rock slope stability are tested in TFINE(a three-dimensional nonlinear finite element program), which is further applied to several representatives of high rock slope's stability evaluation and reinforcement engineering practice in southwest of China.
基金supported by National Science Council,Taiwan,China.The project name is Numerical Approach to Estimate the Stability and Deformation Response of Landslide Dams(NSC99-2625-M-006-004)and Modeling of The Compound Disaster in Hsiaolin Village(NSC99-2218-E-006-238)
文摘The geometry of a landslide dam is an important component of evaluating dam stability.However,the geometry of a natural dam commonly cannot be obtained immediately with field investigations due to their remote locations.A rapid evaluation model is presented to estimate the geometries of natural dams based on the slope of the stream,volume of landslides,and the properties of the deposit.The proposed model uses high resolution satellite images to determine the geometry of the landside dam.These satellite images are the basic information to a preliminary stability analysis of a natural dam.This study applies the proposed method to two case studies in Taiwan.One is the earthquakeinduced Lung-Chung landslide dam in Taitung,and the second is the rainfall-induced Shih-Wun landslide dam in Pingtung.
基金supported by the State Key Laboratory of Coal Resources and Sate Mining,China University of Mining and Technology (No.SKLCRSM13X07)the National Natural Science Foundation of China (No.51174195)+1 种基金Chinese National Programs for Fundamental Research and Development (No.2013CB227900)the Fundamental Research Funds for the Central Universities (No.2014XT01)
文摘A reasonable unsupported roof distance(URD) when advancing underground coal mine roadways can contribute greatly to safe and rapid roadway development.A mechanical model of the roof,using the relationship between the roof stress distribution and URD,obtained by the difference method,and roof stability according to the in-situ roof stress and rock mass strength was developed.We subsequently designed a proper range of URD,developed a testing method of URD with the function of mining protection,evaluated roof stability through analyzing the test data and then determined a reasonable URD.Considering the factors of the geological conditions,the immediate roof stability and the efficiency of the labor arrangement system,the URD of the advancing roadway of 9802 working face in Zhangshuanglou coal mine was determined to be 6 m using the proposed method.The results show that,when a 2 m length of roadway was reinforced by temporary support and high pre-stressed bolt support after the roadway advancement of 6 m per cycle,the speed and the security of the roadway development can be achieved and the advance rate can reach more than 400 m per month.
基金supported in part by National Science Foundation of China (Contract NO. 41030742)Guangxi Science Foundation and the Program for Science & Technology of Henan Province in China (Grant No. 142300410200)
文摘traditional In this paper, two drawbacks pseudo-static method (vertical of the slice method) in the slope stability evaluation have been studied. First, the sliding mass is divided into vertical slices according to this method, which is irrational to some extent in the seismic design of slope. Second, only peak ground acceleration (PGA) is considered, and the effects of shaking frequency and duration on slope stability are neglected. And then, based on the theory of elastic wave and the summarized geological model, this paper put forwards an improved method of pseudo-method by using the theory of elastic wave and Hilbert-Huang transform. The improved pseudostatic method gives reasonable considerations to the time-frequency effects of seismic wave and its rationality has been verified by the shaking table test. This method can evaluate the safety of a slope, the happening time and the scale of landslides. At the same time, this method also can improve the high accuracy of the evaluation of the safety of the slope.
文摘Mass movements are very common problems in the eastern Black Sea region of Turkey due to its climate conditions, geological, and geomorphological characteristics. High slope angle, weathering, dense rainfalls, and anthropogenic impacts are generally reported as the most important triggering factors in the region. Following the portal slope excavations in the entrance section of Cankurtaran tunnel, located in the region, where the highly weathered andesitic tuff crops out, a circular toe failure occurred. The main target of the present study is to investigate the causes and occurrence mechanism of this failure and to determine the feasible remedial measures against it using finite element method(FEM) in four stages. These stages are slope stability analyses for pre-and postexcavation cases, and remediation design assessments for slope and tunnel. The results of the FEM-SSR analyses indicated that the insufficient initial support design and weathering of the andesitic tuffs are the main factors that caused the portal failure. After installing a rock retaining wall with jet grout columns and reinforced slope benching applications, the factor of safety increased from 0.83 to 2.80. In addition toslope stability evaluation, the Rock Mass Rating(RMR), Rock Mass Quality(Q) and New Austrian Tunneling Method(NATM) systems were also utilized as empirical methods to characterize the tunnel ground and to determine the tunnel support design. The performance of the suggested empirical support design, induced stress distributions and deformations were analyzed by means of numerical modelling. Finally, it was concluded that the recommended stabilization technique was essential for the dynamic long-term stability and prevents the effects of failure. Additionally, the FEM method gives useful and reasonably reliable results in evaluating the stability of cut slopes and tunnels excavated both in continuous and discontinuous rock masses.
基金provided by the National Natural Science Foundation of China (No. 40972196)the Scientific Research Foundation of China University of Mining & Technology(Beijing) (No. 2010QL03)
文摘Under the combined influences of special topography and the long term mining in Nanfen Open Pit Iron Mine, many large scale landslide masses appeared in heading side of stope, and tens of millions of iron mine is buried underside, making great economic losses. In order to guide the safety mining and increase the supply quantity, this paper through the use of MSARMA-method and the ''MSARMA evaluation and analytical system for slope stability analysis'' based on this method, which aimed at the quantitative evaluating of the slope stability before and after the actual mining below the slip mass, and the sensitivity analysis for the main influencing factor, providing scientific proof for the parameter optimization of open mine surface slope, the security and sustainable exploitation.