In order to realize the explorer autonomy, the software architecture of autonomous mission management system (AMMS) is given for the deep space explorer, and the autonomous mission planning system, the kernel part of ...In order to realize the explorer autonomy, the software architecture of autonomous mission management system (AMMS) is given for the deep space explorer, and the autonomous mission planning system, the kernel part of this architecture, is designed in detail. In order to describe the parallel activity, the state timeline is introduced to build the formal model of the planning system and based on this model, the temporal constraint satisfaction planning algorithm is proposed to produce the explorer’s activity sequence. With some key subsystems of the deep space explorer as examples, the autonomous mission planning simulation system is designed. The results show that this system can calculate the executable activity sequence with the given mission goals and initial state of the explorer.展开更多
A laser technique based scanning system was employed to make a comprehensive scanning through borehole forunmapped cavity under open pit bench,then the three-dimensional data will be obtained,and these data were used ...A laser technique based scanning system was employed to make a comprehensive scanning through borehole forunmapped cavity under open pit bench,then the three-dimensional data will be obtained,and these data were used for theoreticalanalysis and numerical simulation to analyze the stability of cap rock.Acoustic emission techniques were also adopted to carry outlong term real time rupture monitoring in cap rock.Therefore,a complete safety evaluation system for the cap rock was establishedto ensure safe operation of subsequent blasting processes.The ideal way of eliminating collapse hazard of such cavity is cap rockcaving through deep-hole blasting,thus,two deep-hole blasting schemes named as vertical deep-hole blasting scheme and one-timeraise driving integrated with deep-hole bench blasting scheme were proposed.The vertical deep-hole blasting scheme has moreexplosive consumption,but the relatively simple blasting net work structure can greatly reduce workloads.However,the one-timeraise driving integrated with deep-hole bench blasting scheme can obviously reduce explosive consumption,but the higher technicalrequirements on drilling,explosive charging and blasting network will increase workloads.展开更多
At the time when Chinese scientists are hailing the successful launch of the DAMPE,a satellite to detect possible dark matter particles in space,and meanwhile expecting the launch of further space missions,we have the...At the time when Chinese scientists are hailing the successful launch of the DAMPE,a satellite to detect possible dark matter particles in space,and meanwhile expecting the launch of further space missions,we have the honor to invite Prof.Roger-Maurice Bonnet,former Science Director of ESA(the European Space Agency)to glve comments and advice on project management in the field of space science.展开更多
文摘In order to realize the explorer autonomy, the software architecture of autonomous mission management system (AMMS) is given for the deep space explorer, and the autonomous mission planning system, the kernel part of this architecture, is designed in detail. In order to describe the parallel activity, the state timeline is introduced to build the formal model of the planning system and based on this model, the temporal constraint satisfaction planning algorithm is proposed to produce the explorer’s activity sequence. With some key subsystems of the deep space explorer as examples, the autonomous mission planning simulation system is designed. The results show that this system can calculate the executable activity sequence with the given mission goals and initial state of the explorer.
基金Projects(51204206,41272304,41372278) supported by the National Natural Science Foundation of China
文摘A laser technique based scanning system was employed to make a comprehensive scanning through borehole forunmapped cavity under open pit bench,then the three-dimensional data will be obtained,and these data were used for theoreticalanalysis and numerical simulation to analyze the stability of cap rock.Acoustic emission techniques were also adopted to carry outlong term real time rupture monitoring in cap rock.Therefore,a complete safety evaluation system for the cap rock was establishedto ensure safe operation of subsequent blasting processes.The ideal way of eliminating collapse hazard of such cavity is cap rockcaving through deep-hole blasting,thus,two deep-hole blasting schemes named as vertical deep-hole blasting scheme and one-timeraise driving integrated with deep-hole bench blasting scheme were proposed.The vertical deep-hole blasting scheme has moreexplosive consumption,but the relatively simple blasting net work structure can greatly reduce workloads.However,the one-timeraise driving integrated with deep-hole bench blasting scheme can obviously reduce explosive consumption,but the higher technicalrequirements on drilling,explosive charging and blasting network will increase workloads.
文摘At the time when Chinese scientists are hailing the successful launch of the DAMPE,a satellite to detect possible dark matter particles in space,and meanwhile expecting the launch of further space missions,we have the honor to invite Prof.Roger-Maurice Bonnet,former Science Director of ESA(the European Space Agency)to glve comments and advice on project management in the field of space science.