期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
机载式临时护顶机的研制与应用 被引量:1
1
作者 田勇 《中州煤炭》 2009年第1期20-21,共2页
为提高临时支护的可靠性,对空顶区进行安全、快速支护,研究开发了机载式临时护顶机。阐述了机载式临时护顶机的设计思路、工作原理及应用情况。
关键词 机载式 临时护 临时支护 空顶区支护
下载PDF
Entry roof truss-bolt system test under the gob of contiguous seams
2
作者 连传杰 徐卫亚 王亚杰 《Journal of Coal Science & Engineering(China)》 2007年第1期13-17,共5页
Roof bolt support system has been widely applied in the No.7, 9 seam in Caozhuang coal mine. However, it has not been able to be applied in the No.10-2 seam since the small interburden (2 m) between No.9 and No.10-2... Roof bolt support system has been widely applied in the No.7, 9 seam in Caozhuang coal mine. However, it has not been able to be applied in the No.10-2 seam since the small interburden (2 m) between No.9 and No.10-2 seam. The No.9 and No.10-2 seams are contiguous seams. The No.9 seam has been mined out and the No.10-2 seam will be mined under the gob of the No.9 seam. The roof strata of the No.10-2 seam may have been weakened and fractured due to the shear failure caused by the No.9 seam mining activities. The steel beam sets spaced at 0.8 m have been used to support the entry of the No.10-2 seam. In order to speed up the advance rate and cut entry development cost, a test area, using roof bolt in conjunction with truss-system, was successfully conducted. This paper presents the support system design, application of designed system, and the test results. Test results provide a cheaper, quicker, and safer way to support entry for the No.10-2 seam. 展开更多
关键词 truss-bolt system gob finite element method(FEM) contiguous seams installed load of bolt
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部