期刊文献+
共找到5篇文章
< 1 >
每页显示 20 50 100
公交中途停靠站建设规划内容分析 被引量:3
1
作者 王献香 《交通与运输》 2014年第A01期106-109,共4页
为提高公交运输的总体质量和效率,从站点距离、站点选址、站台形式、站位数、站点区域长度和站点候车亭六方面提出公交中途停靠站建设规划方法,提高公共交通和社会车辆运行效率,满足居民出行和线路停靠需求。
关键词 中途停靠 台形式 站位数
下载PDF
Land deformation monitoring in mining area with PPP-AR 被引量:5
2
作者 Hu Hong Gao Jingxiang Yao Yifei 《International Journal of Mining Science and Technology》 SCIE EI 2014年第2期207-212,共6页
The mining area deformation monitoring theory and method using precise point positioning (PPP) ambi- guity resolution (AR) were studied, and an ambiguity fixing model with satellite and receiver combina- tion phas... The mining area deformation monitoring theory and method using precise point positioning (PPP) ambi- guity resolution (AR) were studied, and an ambiguity fixing model with satellite and receiver combina- tion phase delay (CPD) was proposed for zero-differenced PPP ambiguity fixing and its corresponding formula derivation was given. The data processing results for I h at six IGS stations in China show that 93% of ambiguities can be fixed within 10 min and all ambiguities can be fixed within 15 min. After ambi- guity fixing, the positioning accuracy is improved by more than 85% in the E and N directions, with abso- lute positioning accuracy reaching millimeter level, and it was improved by 70% in the U direction, reaching centimeter level; the proposed zero-differenced ambiguity fixing model can effectively improve the convergence rate and positioning accuracy in PPP. Data monitoring continuously conducted for half a year at four COPS stations of Shanxi China Coal Pingshuo Group validated the feasibility of using PPP in mining area deformation monitoring. 展开更多
关键词 Deformation monitoring precise point positioning Ambiguity Combination phase delay (CPD) Ionosphere-free combination
下载PDF
Transumbilical laparoendoscopic single-site surgery(LESS) partial nephrectomy:a median follow-up of 2 years
3
作者 Wang Linhui Wu Zhenjie Liu Bing Yang Qing Xiao Liang Sun Yinghao 《Journal of Medical Colleges of PLA(China)》 CAS 2011年第6期305-315,共11页
Objective:Nephron-sparing surgery(NSS) for small renal masses offers a similar functional and oncological outcome to that of radical surgery.Laparoendoscopic single-site surgery(LESS) emerges as an advanced alternativ... Objective:Nephron-sparing surgery(NSS) for small renal masses offers a similar functional and oncological outcome to that of radical surgery.Laparoendoscopic single-site surgery(LESS) emerges as an advanced alternative for reduced invasiveness and improves cosmesis;LESS is developing quickly and its indications have been expanded,but still in its infancy.The aim of this paper is to report our preliminary experience in transumbilical LESS partial nephrectomy(LESS-PN),so as to assess its utility, safety and efficacy.Methods:From August 2009 to October 2010,3 patients underwent transumbilical LESS-PN via a novel multi-channel TriPort by a single experienced urologist in our institution.Patient demographics,perioperative and follow-up data were prospectively collected and analyzed.Results:All the three procedures were successfully completed.A 5-mm ancillary trocar was utilized in all 3 cases.The mean operative duration was 226.3(210-254 min) with an estimated blood loss of 56.7 ml (20-100 ml).Mean warm ischemia time was 35.7 min(19-48 min).One patient was transfused due to postoperative bleeding. The recovery was uneventful and mean length of postoperative stay was 13 days(12-14 days).At the latest follow-up,all patients remained symptom-free and had normal renal function without evidence of recurrence,and they were delighted for a hidden transumbilical scar.Conclusion:Transumbilical LESS-PN is a feasible and safe procedure albeit extremely technically challenging.Surgical outcomes at a median follow-up of 2 years are promising,while currently it should be reserved for highly selected patients with favorable tumor anatomy and performed by a very experienced laparoscopic surgeon. 展开更多
关键词 Partial nephrectomy Laparoendoscopic single-site surgery Nephron sparing surgery
下载PDF
Research on the Accurate Location of the 2007 M_S6.4 Ning'er, Yunnan Earthquake
4
作者 Lu Xian Zhou Longquan 《Earthquake Research in China》 2012年第2期160-167,共8页
Five mobile digital seismic stations were set up by the Earthquake Administration of Yunnan Province near the epicenter of the main shock after the Ning'er M6. 4 earthquake on June 3, 2007. In this paper, the aftersh... Five mobile digital seismic stations were set up by the Earthquake Administration of Yunnan Province near the epicenter of the main shock after the Ning'er M6. 4 earthquake on June 3, 2007. In this paper, the aftershock sequence of the Ning'er M6. 4 earthquake is relocated by using the double difference earthquake location method. The data is from the 5 mobile digital seismic stations and the permanent Simao seismic station. The results show that the length of the aftershock sequence is 40kin and the width is 30km, concentrated obviously at the lateral displacement area between the Pu'er fault and the NNE-trending faults, with the majority occurring on the Pu'er fault around the main shock. The depths of aftershocks are from 2kin to 12km, and the predominant distribution is in the depth of 8 ~ 10km. The mean depth is 7. 9kin. The seismic fault dips to the northwest revealed from the profile parallel to this aftershock sequence, which is identical to the dip of the secondary fault of the NE-trending Menglian-Mojiang fault in the earthquake area. There are more earthquakes concentrated in the northwest segment than in the southeast segment, which is perhaps related to the underground medium and faults. The depth profile of the earthquake sequence shows that the relocated earthquakes are mainly located near the Pu'er fault and the seismic faults dip to the southwest, consistent with the dip of the west branch of the Pu'er fault. In all, the fault strike revealed by earthquake relocations matches well with the strike in the focal mechanism solutions. The main shock is in the top of the aftershock sequence and the aftershocks are symmetrically distributed, showing that faulting was complete in both the NE and SW directions. 展开更多
关键词 The Ms6. 4 Ning'er earthquake Mobile digital seismic station Double-difference earthquake location algorithm
下载PDF
Positioning of the CE-1's impact site based on CCD image data photographed during the controlled impact on the Moon
5
作者 LIU JianJun REN Xin +3 位作者 ZOU XiaoDuan WANG WenRui MOU LingLi LI ChunLai 《Science China Earth Sciences》 SCIE EI CAS 2012年第1期83-89,共7页
Up to now, many lunar explorations concluded their scientific mission through the impact on the lunar surface. The prediction and positioning of impact sites are based on the extrapolated orbiting data together with t... Up to now, many lunar explorations concluded their scientific mission through the impact on the lunar surface. The prediction and positioning of impact sites are based on the extrapolated orbiting data together with the real time orbiting data and observations from ground based telescope provided by TT & C System. As most lunar missions carded cameras onboard, a new method of positioning of CE-1 impact site is put forward. It is based on the CCD image data photographed during the con- trolled impact and the existing lunar terrain data. Test results from this new method also validate the published impact site po sition. 展开更多
关键词 Chang'E-1 lunar impact POSITIONING
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部