In the case of electric or tram traction vehicles, the energy for propulsion purposes, as well as all other purposes, is processed and delivered via traction substations. Knowledge of the course of traction substation...In the case of electric or tram traction vehicles, the energy for propulsion purposes, as well as all other purposes, is processed and delivered via traction substations. Knowledge of the course of traction substation loading, especially at the stage of its design, is an extremely important issue because of the choice of the processing equipment of the main circuit or protection devices. In the range of investigations of railway traction substation B in vicinity of Cracow (Poland), the measurements of current load in hours 4:00 a.m.-8:00 p.m. were realized. The measurements for the analysis were chosen from those realized between 6:00 a.m.-8:00 a.m. (the morning rush time). Due to the sampling of 2 h summit with a frequency of 2 kHz, the recorded data set contains 1.44 ~ 107 elements. Therefore, the necessary transformation of data was to lower frequency 1 Hz, 10 Hz and 50 Hz. The results of the analysis presented below indicate the effect of such conduct on the obtained results for the parameters of time series models. In view of the unsatisfactory effects of the polynomial approximation, there is a need to seek a more efficient approximation method for achieving the optimum compatibility with the measured process. Continued research should lead to the formulation of procedures, which will determine an acceptable accuracy of the expected variability of traction substation loads.展开更多
An improved network flow algorithm, which includes the minimum cost network flow and the same period network flow, is proposed to solve the optimization of cascaded hydroelectric power plants in a competitive electric...An improved network flow algorithm, which includes the minimum cost network flow and the same period network flow, is proposed to solve the optimization of cascaded hydroelectric power plants in a competitive electricity market. The typical network flow is used to find the feasible flow and add the discharge water to different cascaded hydroelectric power plants at the same step. The same period network flow is used to find the optimal flow and add the power output at a different step. This new algorithm retains the advantages of the typical network flow, such as simplicity and ease of realization. The result of the case analysis indicates that the new algorithm can achieve high calculation precision and can be used to calculate the optimal operation of cascaded hydroelectric power plants.展开更多
This paper investigates the performance of SAPFs (shunt active power filters) which are introduced in order to address the quality issues in electrified railway supply systems. These filters can be installed at eith...This paper investigates the performance of SAPFs (shunt active power filters) which are introduced in order to address the quality issues in electrified railway supply systems. These filters can be installed at either the S/S (substation) end or at the SP (sectioning post) of the railway feeding power system. In this investigation novel control algorithms, based on the synchronously rotating frame of reference, are proposed for the case when the SAPF is installed at the substation end and its performance is assessed. The effectiveness of the proposed control algorithms are illustrated via Matlab/SimPower computer simulations and validated via comparisons with other publications. This investigation demonstrated that when the SAPF is installed at the substation side, it can effectively compensate for the higher harmonic supply current. In addition, the reactive power demand is fully compensated for, leading to close to unity power factor. However, the voltage drop/sag at the locomotive power supply feed point is only partially compensated for.展开更多
AREVA operates a world-wide unique thermal hydraulic platform to ensure high safety standards in the nuclear industries. This platform is operated as an accredited test and inspection body according to ISO 17025 and 1...AREVA operates a world-wide unique thermal hydraulic platform to ensure high safety standards in the nuclear industries. This platform is operated as an accredited test and inspection body according to ISO 17025 and 17020 to grant a high and independently confmned quality standard. The accreditation also ensures the independency of the organization and confidentiality to the individual stakeholders, for example research centers, utilities, components suppliers, engineering companies and vendors. Especially for nuclear power plants, it is very relevant to consider that reliability depends on the integrity of its components during its life time-from design through construction, operation and maintenance. For example, a typical NPP (nuclear power plant) has 1,000 to 2,000 large valves and 7,500 to 12,500 small valves, of which about 200 to 400 are designated Safety Class 1. The qualification of these Safety Class 1 components is relevant for reactor new builds but also for installed plants. This paper explains newly established qualification tasks, the corresponding testing infrastructure, and the state of the art of testing technology. By way of example, the paper describes the program and possible sequence of qualifying NPP safety-related components.展开更多
文摘In the case of electric or tram traction vehicles, the energy for propulsion purposes, as well as all other purposes, is processed and delivered via traction substations. Knowledge of the course of traction substation loading, especially at the stage of its design, is an extremely important issue because of the choice of the processing equipment of the main circuit or protection devices. In the range of investigations of railway traction substation B in vicinity of Cracow (Poland), the measurements of current load in hours 4:00 a.m.-8:00 p.m. were realized. The measurements for the analysis were chosen from those realized between 6:00 a.m.-8:00 a.m. (the morning rush time). Due to the sampling of 2 h summit with a frequency of 2 kHz, the recorded data set contains 1.44 ~ 107 elements. Therefore, the necessary transformation of data was to lower frequency 1 Hz, 10 Hz and 50 Hz. The results of the analysis presented below indicate the effect of such conduct on the obtained results for the parameters of time series models. In view of the unsatisfactory effects of the polynomial approximation, there is a need to seek a more efficient approximation method for achieving the optimum compatibility with the measured process. Continued research should lead to the formulation of procedures, which will determine an acceptable accuracy of the expected variability of traction substation loads.
文摘An improved network flow algorithm, which includes the minimum cost network flow and the same period network flow, is proposed to solve the optimization of cascaded hydroelectric power plants in a competitive electricity market. The typical network flow is used to find the feasible flow and add the discharge water to different cascaded hydroelectric power plants at the same step. The same period network flow is used to find the optimal flow and add the power output at a different step. This new algorithm retains the advantages of the typical network flow, such as simplicity and ease of realization. The result of the case analysis indicates that the new algorithm can achieve high calculation precision and can be used to calculate the optimal operation of cascaded hydroelectric power plants.
文摘This paper investigates the performance of SAPFs (shunt active power filters) which are introduced in order to address the quality issues in electrified railway supply systems. These filters can be installed at either the S/S (substation) end or at the SP (sectioning post) of the railway feeding power system. In this investigation novel control algorithms, based on the synchronously rotating frame of reference, are proposed for the case when the SAPF is installed at the substation end and its performance is assessed. The effectiveness of the proposed control algorithms are illustrated via Matlab/SimPower computer simulations and validated via comparisons with other publications. This investigation demonstrated that when the SAPF is installed at the substation side, it can effectively compensate for the higher harmonic supply current. In addition, the reactive power demand is fully compensated for, leading to close to unity power factor. However, the voltage drop/sag at the locomotive power supply feed point is only partially compensated for.
文摘AREVA operates a world-wide unique thermal hydraulic platform to ensure high safety standards in the nuclear industries. This platform is operated as an accredited test and inspection body according to ISO 17025 and 17020 to grant a high and independently confmned quality standard. The accreditation also ensures the independency of the organization and confidentiality to the individual stakeholders, for example research centers, utilities, components suppliers, engineering companies and vendors. Especially for nuclear power plants, it is very relevant to consider that reliability depends on the integrity of its components during its life time-from design through construction, operation and maintenance. For example, a typical NPP (nuclear power plant) has 1,000 to 2,000 large valves and 7,500 to 12,500 small valves, of which about 200 to 400 are designated Safety Class 1. The qualification of these Safety Class 1 components is relevant for reactor new builds but also for installed plants. This paper explains newly established qualification tasks, the corresponding testing infrastructure, and the state of the art of testing technology. By way of example, the paper describes the program and possible sequence of qualifying NPP safety-related components.