期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
锅炉下集箱端盖的裂纹失效分析
1
作者 邵艳秋 吴庆玉 《中国锅炉压力容器安全》 1996年第2期43-44,共2页
某厂用于发电和供热的P—35/39—450型锅炉运行25年后,在停炉定期检验时,发现左右下集箱的端盖部位烧损严重,向火面出现了很多长短不一、深浅不等的裂纹。如图1:
关键词 锅炉 下集箱 端益 裂纹 失效分析
下载PDF
Effect of Serial PMSs on Operational Benefits of Arrival Flights
2
作者 XU Can WANG Xunuo +1 位作者 TIAN Yong WANG Zhan 《Transactions of Nanjing University of Aeronautics and Astronautics》 EI CSCD 2022年第S01期73-81,共9页
In order to alleviate the flight congestion in terminal areas(TMAs),it is of great significance to develop an effective method.An arrival sequencing model based on the serial point merge systems(PMSs)is constructed to... In order to alleviate the flight congestion in terminal areas(TMAs),it is of great significance to develop an effective method.An arrival sequencing model based on the serial point merge systems(PMSs)is constructed to improve the operational benefits of arrival flights.The approach of first come first service(FCFS)combined with the method of constraint position shift(CPS)is used as the sequencing strategy.Through the simulated annealing algorithm,the results show that the arrival flights sequencing through serial PMSs has significant advantages in reducing delays and increasing runway throughput especially in the case of high traffic loads.The proposed approach is conducive in promoting the implementation and application of serial PMS. 展开更多
关键词 serial point merge systems(PMSs) terminal area(TMA) arrival flights operational benefits
下载PDF
Framework for Quality Improvement of Infrastructure Projects
3
作者 Abukar Warsame 《Journal of Civil Engineering and Architecture》 2013年第12期1529-1539,共11页
In order to achieve high quality that not only gives acceptable return value to society but also satisfies the needs of all the stakeholders of infrastructure projects, comprehensive understanding of issues pertaining... In order to achieve high quality that not only gives acceptable return value to society but also satisfies the needs of all the stakeholders of infrastructure projects, comprehensive understanding of issues pertaining to the quality of the project is needed. The aim of this study is to provide an overview the most common procurement methods used in constructing infrastructure transport projects and analyze how these methods contribute to the desired quality of the final product in relation to client competence. An on-line survey of construction actors was carried out to ascertain quality level of Swedish infrastructure transport projects and determinant factors of quality problems. An equal number of respondents indicated that the quality of infrastructure projects has either increased or remained same level over the past twenty years. Respondents also pointed out lack of client competence that is vital in realizing the desired quality level through proper procurement, monitoring and evaluation procedures. Public clients heavily rely on traditional design-build procurement that requires considerable client involvement of a project. Thus, the association of quality problems and lack of client competence may not be a mere coincidence but an overlooked outcome of current situation. 展开更多
关键词 COMPETENCE infrastructure transport procurement QUALITY warranties
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部