期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Beam-track interaction of high-speed railway bridge with ballast track 被引量:18
1
作者 闫斌 戴公连 张华平 《Journal of Central South University》 SCIE EI CAS 2012年第5期1447-1453,共7页
Based on the construction bridge of Xiamen-Shenzhen high-speed railway(9-32 m simply-supported beam + 6×32 m continuous beam),the pier-beam-track finite element model,where the continuous beam of the ballast trac... Based on the construction bridge of Xiamen-Shenzhen high-speed railway(9-32 m simply-supported beam + 6×32 m continuous beam),the pier-beam-track finite element model,where the continuous beam of the ballast track and simply-supported beam are combined with each other,was established.The laws of the track stress,the pier longitudinal stress and the beam-track relative displacement were analyzed.The results show that reducing the longitudinal resistance can effectively reduce the track stress and the pier stress of the continuous beam,and increase the beam-track relative displacement.Increasing the rigid pier stiffness of continuous beam can reduce the track braking stress,increase the pier longitudinal stress and reduce the beam-track relative displacement,Increasing the rigid pier stiffness of simply-supported beam can reduce the track braking stress,the rigid pier longitudinal stress and the beam-track relative displacement. 展开更多
关键词 high-speed railway beam-track interaction ballast track rail longitudinal force continuous beam
下载PDF
Full-scale model tests and nonlinear analysis of prestressed concrete simply supported box girders
2
作者 Fang Zhi Tang Shenghua He Xin 《Engineering Sciences》 EI 2014年第1期67-76,共10页
Full-scale model tests were carried out on a 30 m span prestressed concrete box girder and a 20 m span prestressed concrete hollow slab. Failure models were prestressed reinforcement tensile failure and crashing of ro... Full-scale model tests were carried out on a 30 m span prestressed concrete box girder and a 20 m span prestressed concrete hollow slab. Failure models were prestressed reinforcement tensile failure and crashing of roof concrete, respectively. The ductility indexes of the box girder and hollow slab were 1.99 and 1.23, respectively, according to the energy viewpoint. Based on the horizontal section hypothesis, the nonlinear computation procedure was established using the limited banding law, and it could carry out the entire performance analysis including the unloading, mainly focusing on the ways to achieve the unloading curves computation through stress-strain, moment-curvature and load-displacement curves. Through the procedure, parameters that influence on the bearing capacity, deformation performance and ductility of the structures were analyzed. Those parameters were quantity of prestressed reinforcement and tension coefficients of prestressed reinforcement. From the analysis, some useful conclusions can be obtained. 展开更多
关键词 prestressed concrete box girder full-scale model test nonlinear analysis bearing capacity DUCTILITY
下载PDF
膏体假顶力学模型研究及有限元分析 被引量:16
3
作者 吴爱祥 张爱卿 +2 位作者 王洪江 李公成 戎宽伟 《采矿与安全工程学报》 EI CSCD 北大核心 2017年第3期587-593,共7页
为了保证矿山安全高效的回采,采用理论研究与数值模拟手段,将膏体假顶力学模型简化为简支"梁"模型,揭示了膏体假顶强度与膏体假顶厚度及经济配筋率的变化规律,研究表明,膏体假顶的极限强度随着膏体假顶厚度的增大呈多项式降低... 为了保证矿山安全高效的回采,采用理论研究与数值模拟手段,将膏体假顶力学模型简化为简支"梁"模型,揭示了膏体假顶强度与膏体假顶厚度及经济配筋率的变化规律,研究表明,膏体假顶的极限强度随着膏体假顶厚度的增大呈多项式降低,经济配筋率随膏体假顶强度增加呈对数增加。结合新疆某铜矿工程实际情况,并通过数值模拟技术,设计锯齿形膏体假顶,确定膏体假顶厚度为3 m,强度为6.78 MPa,经济配筋率为0.6%,纵筋选择12φ14@250布置。结果表明,膏体假顶在自重及上部充填体作用下,膏体假顶可以保证正常的工作,从而很好地验证了膏体假顶力学模型的可靠性。该研究成果对膏体假顶设计具有重要的指导意义。 展开更多
关键词 膏体假顶 简支“梁’模型 经济配筋率
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部