提出了一种实时异构系统的集成动态调度算法.该算法通过一个新的任务分配策略以及软实时任务的服务质量QoS(quality of service)降级策略,不仅以统一方式完成了对实时异构系统中硬、软实时任务的集成动态调度,而且提高了算法的调度成功...提出了一种实时异构系统的集成动态调度算法.该算法通过一个新的任务分配策略以及软实时任务的服务质量QoS(quality of service)降级策略,不仅以统一方式完成了对实时异构系统中硬、软实时任务的集成动态调度,而且提高了算法的调度成功率.同时,还进行了大量的模拟研究.这些模拟以传统的近视算法为基准,将其应用在实时异构系统集成动态调度时的调度成功率与新算法进行比较,模拟结果表明,在多种任务参数取值下,新算法的调度成功率均高于传统的近视算法.展开更多
In view of the fact that traditional job shop scheduling only considers a single factor, which affects the effect of resource allocation, the dual-resource integrated scheduling problem between AGV and machine in inte...In view of the fact that traditional job shop scheduling only considers a single factor, which affects the effect of resource allocation, the dual-resource integrated scheduling problem between AGV and machine in intelligent manufacturing job shop environment was studied. The dual-resource integrated scheduling model of AGV and machine was established by comprehensively considering constraints of machines, workpieces and AGVs. The bidirectional single path fixed guidance system based on topological map was determined, and the AGV transportation task model was defined. The improved A* path optimization algorithm was used to determine the optimal path, and the path conflict elimination mechanism was described. The improved NSGA-Ⅱ algorithm was used to determine the machining workpiece sequence, and the competition mechanism was introduced to allocate AGV transportation tasks. The proposed model and method were verified by a workshop production example, the results showed that the dual resource integrated scheduling strategy of AGV and machine is effective.展开更多
This paper considers an ant colony optimization algorithm based on AND/OR graph for integrated process planning and scheduling(IPPS). Generally, the process planning and scheduling are studied separately. Due to the c...This paper considers an ant colony optimization algorithm based on AND/OR graph for integrated process planning and scheduling(IPPS). Generally, the process planning and scheduling are studied separately. Due to the complexity of manufacturing system, IPPS combining both process planning and scheduling can depict the real situation of a manufacturing system. The IPPS is represented on AND/OR graph consisting of nodes, and undirected and directed arcs. The nodes denote operations of jobs, and undirected/directed arcs denote possible visiting path among the nodes. Ant colony goes through the necessary nodes on the graph from the starting node to the end node to obtain the optimal solution with the objective of minimizing makespan. In order to avoid local convergence and low convergence, some improved strategy is incorporated in the standard ant colony optimization algorithm. Extensive computational experiments are carried out to study the influence of various parameters on the system performance.展开更多
文摘提出了一种实时异构系统的集成动态调度算法.该算法通过一个新的任务分配策略以及软实时任务的服务质量QoS(quality of service)降级策略,不仅以统一方式完成了对实时异构系统中硬、软实时任务的集成动态调度,而且提高了算法的调度成功率.同时,还进行了大量的模拟研究.这些模拟以传统的近视算法为基准,将其应用在实时异构系统集成动态调度时的调度成功率与新算法进行比较,模拟结果表明,在多种任务参数取值下,新算法的调度成功率均高于传统的近视算法.
基金Project(BK20201162)supported by the General Program of Natural Science Foundation of Jiangsu Province,ChinaProject(JC2019126)supported by the Science and Technology Plan Fundamental Scientific Research Funding Project of Nantong,China+1 种基金Project(CE20205045)supported by the Changzhou Science and Technology Support Plan(Social Development),ChinaProject(51875171)supported by the National Nature Science Foundation of China。
文摘In view of the fact that traditional job shop scheduling only considers a single factor, which affects the effect of resource allocation, the dual-resource integrated scheduling problem between AGV and machine in intelligent manufacturing job shop environment was studied. The dual-resource integrated scheduling model of AGV and machine was established by comprehensively considering constraints of machines, workpieces and AGVs. The bidirectional single path fixed guidance system based on topological map was determined, and the AGV transportation task model was defined. The improved A* path optimization algorithm was used to determine the optimal path, and the path conflict elimination mechanism was described. The improved NSGA-Ⅱ algorithm was used to determine the machining workpiece sequence, and the competition mechanism was introduced to allocate AGV transportation tasks. The proposed model and method were verified by a workshop production example, the results showed that the dual resource integrated scheduling strategy of AGV and machine is effective.
基金Supported by the Fundamental Research Funds for the Central Universities(13MS100)the Hebei Province Research Foundation of Natural Science(E2011502024)the National Natural Science Foundation of China(51177046)
文摘This paper considers an ant colony optimization algorithm based on AND/OR graph for integrated process planning and scheduling(IPPS). Generally, the process planning and scheduling are studied separately. Due to the complexity of manufacturing system, IPPS combining both process planning and scheduling can depict the real situation of a manufacturing system. The IPPS is represented on AND/OR graph consisting of nodes, and undirected and directed arcs. The nodes denote operations of jobs, and undirected/directed arcs denote possible visiting path among the nodes. Ant colony goes through the necessary nodes on the graph from the starting node to the end node to obtain the optimal solution with the objective of minimizing makespan. In order to avoid local convergence and low convergence, some improved strategy is incorporated in the standard ant colony optimization algorithm. Extensive computational experiments are carried out to study the influence of various parameters on the system performance.