期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
普渡河管桥结构抗震分析 被引量:3
1
作者 李振富 杨业 周潜 《水利水电技术》 CSCD 北大核心 2001年第12期59-61,共3页
运用ANSYS计算程序,对云南省昆明市掌鸠河引水供水工程普渡河跨河管桥组合结构进行了地震作用下的时程响应分析,分析结果表明在8度地震作用下管桥应力不大,变位很小,总体上是安全的.
关键词 管桥结合结构 地震作用 时程响应分析 普渡河 ANSYS计算程序 引水供水工程 管桥应力
下载PDF
Research on stress concentration at tubular joints in concrete filled steel tubular truss arch bridge 被引量:1
2
作者 LI Rui YE Liao-yuan CHEN Ying 《Journal of Civil Engineering and Architecture》 2009年第3期11-15,共5页
In this paper stresses at joints forming by hollow steel tube and concrete filled steel tube (CFST) are calculated, analyzed and compared. It is founded that the stress concentration at joints of CFST is a quite dif... In this paper stresses at joints forming by hollow steel tube and concrete filled steel tube (CFST) are calculated, analyzed and compared. It is founded that the stress concentration at joints of CFST is a quite different from that of hollow steel tube. A conclusion can be made that analysis of fatigue at the joints of CFST truss arch bridge can not apply the results developed from analyzing at joints of hollow steel tube in marine structure. 展开更多
关键词 concrete filled steel tube (CFST) JOINT stress concentration
下载PDF
Weakening effect of vertical prestress ducts on web sections in prestressed concrete box girder bridges
3
作者 Shen Mingyan Zhong Xingu Yin Xuwen Shu Xiaojuan 《Engineering Sciences》 EI 2010年第2期73-79,共7页
Based on experimental study result of two simply supported beams,which were prestressed by vertical tendons,the research on the weakening effect of vertical prestress ducts on web sections of prestressed concrete box ... Based on experimental study result of two simply supported beams,which were prestressed by vertical tendons,the research on the weakening effect of vertical prestress ducts on web sections of prestressed concrete box girder was carried out. The test result shows that in the condition without grouting into the ducts,the cracking load is evidently lower than that with full grouting,and stirrup stress and principal tension stress at the surface of concrete will increase obviously. Meanwhile,the finite element analysis has been done to the test beams. The research is consistent with the analysis of finite element. The research tells that strengthening the detection and management for the vertical prestress grouting quality have an important meaning to prevent cracking of the prestressed concrete box girder bridge and provide one theoretical and testing basis for analyzing the cracking reason of such bridges. 展开更多
关键词 concrete box girder bridge vertical prestress duct weakening of web section experimental study finite element analysis
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部