BIM (building information modelling) has gained wider acceptance in the A/E/C (architecture/engineering/construction) industry in the US and internationally. This paper presents current industry approaches of impl...BIM (building information modelling) has gained wider acceptance in the A/E/C (architecture/engineering/construction) industry in the US and internationally. This paper presents current industry approaches of implementing 3D point cloud data in BIM and VDC (virtual design and construction) applications during various stages of a project life cycle and the challenges associated with processing the huge amount of 3D point cloud data. Conversion from discrete 3D point cloud raster data to geometric/vector BIM data remains to be a labor-intensive process. The needs for intelligent geometric feature detection/reconstruction algorithms for automated point cloud processing and issues related to data management are discussed. This paper also presents an innovative approach for integrating 3D point cloud data with BIM to efficiently augment built environment design, construction and management.展开更多
This article presents a comprehensive mathematical model for the design and analysis of Dynamic Cellular Manufacturing Systems (DCMS). The proposed DCMS model considers several manufacturing attributes such as multi...This article presents a comprehensive mathematical model for the design and analysis of Dynamic Cellular Manufacturing Systems (DCMS). The proposed DCMS model considers several manufacturing attributes such as multi period production planning, dynamic system reconfiguration, duplicate machines, machine capacity, the available time for workers, worker assignments, and machine procurement. The objective is to minimize total costs; consisting of holding cost, outsourcing cost, inter-cell material handling cost, maintenance and overhead cost, machine relocation cost. While a study of published articles in the area of Cellular Manufacturing Systems (CMS) shows that workforce management issues have not sufficiently been addressed in the literature, the model presented also incorporates CMS workforce management issues such as salaries, hiring and firing costs of workers in addition to the manufacturing attributes. In-depth discussions on the results for two numerical examples are presented to illustrate applications of the proposed model. The model developed aims to raise the envelope by expanding and improving several CMS models previously presented in the literature.展开更多
Human resources are the core of business development, the competition of modem enterprises, in the final analysis is the talent competition, which is the human development level of competition. Scenic spot enterprise ...Human resources are the core of business development, the competition of modem enterprises, in the final analysis is the talent competition, which is the human development level of competition. Scenic spot enterprise view service quality as their development lifeline, rely entirely on high-quality staff to achieve, tourist attractions enterprise has its particularity industry: labor-intensive enterprises, but different from other manufacturing and other labor-intensive enterprises, They have high quality requirements for comprehensive employee quality, and therefore human resource development, compared with other enterprises, is more important and more challenging.展开更多
文摘BIM (building information modelling) has gained wider acceptance in the A/E/C (architecture/engineering/construction) industry in the US and internationally. This paper presents current industry approaches of implementing 3D point cloud data in BIM and VDC (virtual design and construction) applications during various stages of a project life cycle and the challenges associated with processing the huge amount of 3D point cloud data. Conversion from discrete 3D point cloud raster data to geometric/vector BIM data remains to be a labor-intensive process. The needs for intelligent geometric feature detection/reconstruction algorithms for automated point cloud processing and issues related to data management are discussed. This paper also presents an innovative approach for integrating 3D point cloud data with BIM to efficiently augment built environment design, construction and management.
文摘This article presents a comprehensive mathematical model for the design and analysis of Dynamic Cellular Manufacturing Systems (DCMS). The proposed DCMS model considers several manufacturing attributes such as multi period production planning, dynamic system reconfiguration, duplicate machines, machine capacity, the available time for workers, worker assignments, and machine procurement. The objective is to minimize total costs; consisting of holding cost, outsourcing cost, inter-cell material handling cost, maintenance and overhead cost, machine relocation cost. While a study of published articles in the area of Cellular Manufacturing Systems (CMS) shows that workforce management issues have not sufficiently been addressed in the literature, the model presented also incorporates CMS workforce management issues such as salaries, hiring and firing costs of workers in addition to the manufacturing attributes. In-depth discussions on the results for two numerical examples are presented to illustrate applications of the proposed model. The model developed aims to raise the envelope by expanding and improving several CMS models previously presented in the literature.
文摘Human resources are the core of business development, the competition of modem enterprises, in the final analysis is the talent competition, which is the human development level of competition. Scenic spot enterprise view service quality as their development lifeline, rely entirely on high-quality staff to achieve, tourist attractions enterprise has its particularity industry: labor-intensive enterprises, but different from other manufacturing and other labor-intensive enterprises, They have high quality requirements for comprehensive employee quality, and therefore human resource development, compared with other enterprises, is more important and more challenging.