期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
BIM技术在用地紧张大型水厂管线综合设计中的应用实践
1
作者 郭子玉 覃新元 +3 位作者 田萌 王洋 涂晓弦 卓奇奇 《给水排水》 CSCD 北大核心 2024年第8期144-148,共5页
在水厂管线综合设计过程中,各类管线错综复杂,利用二维设计软件设计时,管线交叉位置多,高程计算工作量大,设计难度高。以松山湖水厂一期工程为例,采用BIM技术软件进行厂区管线的设计,在设计过程中节省了设计周期、优化管线布置、减少厂... 在水厂管线综合设计过程中,各类管线错综复杂,利用二维设计软件设计时,管线交叉位置多,高程计算工作量大,设计难度高。以松山湖水厂一期工程为例,采用BIM技术软件进行厂区管线的设计,在设计过程中节省了设计周期、优化管线布置、减少厂区管线之间的“错、漏、碰、缺”等问题,并在设计交底过程中采用BIM模型进行交底,避免施工过程中出现错误,节约施工周期和施工成本,补充了BIM技术在厂站内管线系统设计内容的使用场景。 展开更多
关键词 给水厂 管线综合模型 碰撞检查 可视化交底 BIM
下载PDF
Development and Application of Oil-Spill Risk Assessment Model for Offshore Pipeline 被引量:2
2
作者 LU Yan WANG Jia +2 位作者 WEI Wenpu YANG Yong AN Wei 《Journal of Ocean University of China》 SCIE CAS 2014年第3期415-420,共6页
To the potential oil-spill risk caused by offshore pipeline more attention has been paid after the Dalian oil spill incident from oil-pipeline explosion. Since then an issue about how to prevent and control the sudden... To the potential oil-spill risk caused by offshore pipeline more attention has been paid after the Dalian oil spill incident from oil-pipeline explosion. Since then an issue about how to prevent and control the sudden oil-spill from the offshore pipeline has been raised. In this paper, we proposed an optimized model to analyze the main causes(probability) of spill and the consequence with the fuzzy comprehensive assessment model. Considering the complicated assessment process for oil-spill, the assessment factor system involving the spill probability and consequence was established based on the operative manual and statistic leakage/damage data of offshore pipeline in order to estimate the integrated spill risk score automatically. The evaluated factors of spill probability could be grouped into five aspects: corrosion, fatigue, national damage, third party, and operational fault; the consequence evaluated factors of spill included hazard of oil and impact-controlling capability. With some modifications based on experts' opinions, each of the evaluated factors in our work was developed with a relative weight and evaluation criterion. A test example for an offshore pipeline in the Bohai waters was described to show how the model can be used for an actual case in more detail. By using the oil-spill risk assessment model, it is easy to determine the risk level associated with the ongoing activity and management level and hence to take the risk mitigation action immediately. 展开更多
关键词 oil spill risk assessment spill probability spill consequence fuzzy comprehensive assessment model offshore pipeline
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部