期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
浅谈汽车制造过程中管线评审工作的组织开展 被引量:1
1
作者 黄薇 安丰明 《内燃机与配件》 2020年第8期193-195,共3页
本文主要基于目前汽车整车厂管线评审专项活动,系统梳理了管线评审活动的组织形式及注意事项,阐述了整车管路和整车线束布置方面的评审方法及要求,为生产现场、新产品开发等过程中的管线评审活动提供一定的参考和借鉴。
关键词 汽车生产制造 管线评审 管线风险评估
下载PDF
Development and Application of Oil-Spill Risk Assessment Model for Offshore Pipeline 被引量:2
2
作者 LU Yan WANG Jia +2 位作者 WEI Wenpu YANG Yong AN Wei 《Journal of Ocean University of China》 SCIE CAS 2014年第3期415-420,共6页
To the potential oil-spill risk caused by offshore pipeline more attention has been paid after the Dalian oil spill incident from oil-pipeline explosion. Since then an issue about how to prevent and control the sudden... To the potential oil-spill risk caused by offshore pipeline more attention has been paid after the Dalian oil spill incident from oil-pipeline explosion. Since then an issue about how to prevent and control the sudden oil-spill from the offshore pipeline has been raised. In this paper, we proposed an optimized model to analyze the main causes(probability) of spill and the consequence with the fuzzy comprehensive assessment model. Considering the complicated assessment process for oil-spill, the assessment factor system involving the spill probability and consequence was established based on the operative manual and statistic leakage/damage data of offshore pipeline in order to estimate the integrated spill risk score automatically. The evaluated factors of spill probability could be grouped into five aspects: corrosion, fatigue, national damage, third party, and operational fault; the consequence evaluated factors of spill included hazard of oil and impact-controlling capability. With some modifications based on experts' opinions, each of the evaluated factors in our work was developed with a relative weight and evaluation criterion. A test example for an offshore pipeline in the Bohai waters was described to show how the model can be used for an actual case in more detail. By using the oil-spill risk assessment model, it is easy to determine the risk level associated with the ongoing activity and management level and hence to take the risk mitigation action immediately. 展开更多
关键词 oil spill risk assessment spill probability spill consequence fuzzy comprehensive assessment model offshore pipeline
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部