This paper discussed the necessity of establishing a computer network in a mining railway transport management system. The network structure and the system security design, associated with the real development conditi...This paper discussed the necessity of establishing a computer network in a mining railway transport management system. The network structure and the system security design, associated with the real development condition of a mining area, were brought forward, and the system evaluation was given.展开更多
Objective:To evaluate the safety and efficiency of transvenous embolization of dural arteriovenous fistula of cavernous region by multiple venous routes. Methods: Twenty seven patients with dural arteriovenous fistu...Objective:To evaluate the safety and efficiency of transvenous embolization of dural arteriovenous fistula of cavernous region by multiple venous routes. Methods: Twenty seven patients with dural arteriovenous fistula of cavernous region were treated by transvenous embolization with micro-coils. The transvenous routes included inferior petrosal sinus, superior ophthalmic vein and facial vein. Results: Clinical cure was achieved in 23 cases and significant improvement of symptoms in 4 cases. Complete anglographic obliteration was documented in 22 patients (82%). Residual shunting were left in 2 patients via pterygoid drainage and 1 case via inter-cavernous sinus, 2 cases via inferior petrosal sinus, disappeared one month later by manual compression carotid artery. Headache and vomiting were the most common symptoms after embolization. Three patients had diplopia and relieved within two months after embolization. There was no permanent procedure-related morbidity. The clinic follow up ranged from 5 months to 6 years, and there was not recurrence case. Conclusion: Transvenous embolization via different venous routes is a safe and efficient method for dural arteriovenous fistula of cavernous region treatment.展开更多
Deformation and failure of high slope impact the construction and operation safety of highway in the mountainous areas. The deformation and failure are mainly caused by poor design which normally has not well combined...Deformation and failure of high slope impact the construction and operation safety of highway in the mountainous areas. The deformation and failure are mainly caused by poor design which normally has not well combined with the geological conditions and unplanned construction. Therefore, effective design and construction management should be conducted for ensuring a successful construction without damage and risk. In light of the reality of high slope construction along highway in the Huangshan area, this paper proposes a technical procedure for dynamic design and construction management of high slopes along highway in the mountainous area. The proposed construction management scheme is divided into three phases, i.e., 1) design phase, 2) preparation phase of excavation, and 3) construction phase. During the design phase, experiences and lessons learnt from the design and construction of other high slopes along highway in the same region are summarized. The number of slopes and slope height should be optimized from the aspects of route selection and route form. During the preparation phase of excavation, "Excavation Permit Management System" should be adopted, and construction scheme should be made by the construction unit, then the scientific research and design unit determine whether it guarantees slope stability and makes optimization measures. During the construction phase, the scientific research unit would make proposal of optimization design, and apply the achievements of scientific research into practice through common efforts of various units based on the understanding of excavation and investigation. The management system mentioned above is adopted to conduct dynamic design and construction management for more than 90 slopes along the Huangshan - Taling - Taolin Expressway, and successful results of application have been achieved.展开更多
The paper conducts analysis on the causes of dangerous goods road transportation accidents by applying analytic technique of security system science - Event Tree Analysis (ETA). By computing minimum cut and minimal ...The paper conducts analysis on the causes of dangerous goods road transportation accidents by applying analytic technique of security system science - Event Tree Analysis (ETA). By computing minimum cut and minimal path set of event tree and the important level of elementary event, the paper elicits the results that the factors of causing road transportation accident are multiple and its hazard is great while the paper also elicits the sorting of structural important level of elementary event. The paper offers the security countermeasures for dangerous goods road transportation which plays a vital role in safeguarding dangerous goods road transportation security.展开更多
文摘This paper discussed the necessity of establishing a computer network in a mining railway transport management system. The network structure and the system security design, associated with the real development condition of a mining area, were brought forward, and the system evaluation was given.
文摘Objective:To evaluate the safety and efficiency of transvenous embolization of dural arteriovenous fistula of cavernous region by multiple venous routes. Methods: Twenty seven patients with dural arteriovenous fistula of cavernous region were treated by transvenous embolization with micro-coils. The transvenous routes included inferior petrosal sinus, superior ophthalmic vein and facial vein. Results: Clinical cure was achieved in 23 cases and significant improvement of symptoms in 4 cases. Complete anglographic obliteration was documented in 22 patients (82%). Residual shunting were left in 2 patients via pterygoid drainage and 1 case via inter-cavernous sinus, 2 cases via inferior petrosal sinus, disappeared one month later by manual compression carotid artery. Headache and vomiting were the most common symptoms after embolization. Three patients had diplopia and relieved within two months after embolization. There was no permanent procedure-related morbidity. The clinic follow up ranged from 5 months to 6 years, and there was not recurrence case. Conclusion: Transvenous embolization via different venous routes is a safe and efficient method for dural arteriovenous fistula of cavernous region treatment.
文摘Deformation and failure of high slope impact the construction and operation safety of highway in the mountainous areas. The deformation and failure are mainly caused by poor design which normally has not well combined with the geological conditions and unplanned construction. Therefore, effective design and construction management should be conducted for ensuring a successful construction without damage and risk. In light of the reality of high slope construction along highway in the Huangshan area, this paper proposes a technical procedure for dynamic design and construction management of high slopes along highway in the mountainous area. The proposed construction management scheme is divided into three phases, i.e., 1) design phase, 2) preparation phase of excavation, and 3) construction phase. During the design phase, experiences and lessons learnt from the design and construction of other high slopes along highway in the same region are summarized. The number of slopes and slope height should be optimized from the aspects of route selection and route form. During the preparation phase of excavation, "Excavation Permit Management System" should be adopted, and construction scheme should be made by the construction unit, then the scientific research and design unit determine whether it guarantees slope stability and makes optimization measures. During the construction phase, the scientific research unit would make proposal of optimization design, and apply the achievements of scientific research into practice through common efforts of various units based on the understanding of excavation and investigation. The management system mentioned above is adopted to conduct dynamic design and construction management for more than 90 slopes along the Huangshan - Taling - Taolin Expressway, and successful results of application have been achieved.
文摘The paper conducts analysis on the causes of dangerous goods road transportation accidents by applying analytic technique of security system science - Event Tree Analysis (ETA). By computing minimum cut and minimal path set of event tree and the important level of elementary event, the paper elicits the results that the factors of causing road transportation accident are multiple and its hazard is great while the paper also elicits the sorting of structural important level of elementary event. The paper offers the security countermeasures for dangerous goods road transportation which plays a vital role in safeguarding dangerous goods road transportation security.