期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
顾桥1311(1)工作面系统大巷高应力阻隔切顶护巷工艺及工程实践 被引量:1
1
作者 张瑞 孙兴平 +3 位作者 周萌 孙涛 陈建本 杨敬轩 《山西焦煤科技》 CAS 2023年第8期8-13,56,共7页
覆岩平面切顶能起到较好的高应力阻隔效果,鉴于顾桥煤矿1311(1)工作面停采线近区的系统大巷变形较大,确定在工作面停采线前方的联巷内开展爆破切顶作业,阻隔覆岩分层支承压力传载路径,降低被保护系统大巷围岩应力集中程度。结合理论计... 覆岩平面切顶能起到较好的高应力阻隔效果,鉴于顾桥煤矿1311(1)工作面停采线近区的系统大巷变形较大,确定在工作面停采线前方的联巷内开展爆破切顶作业,阻隔覆岩分层支承压力传载路径,降低被保护系统大巷围岩应力集中程度。结合理论计算、现场实测与数值模拟,将顶板致裂目标层位高度确定为40 m,采用煤矿高性能重型药柱配合注浆封孔工艺,实现了深孔爆破快速装药及高效封孔;空孔导向作用下,平面切顶效果显著,装药孔爆破单边裂缝扩展长度至少在2 m;被保护大巷顶底板与两帮移近量分别控制在110 mm、70 mm内,证明爆破切顶起到了良好的应力阻隔作用。 展开更多
关键词 工作面联巷 深孔爆破 切顶护巷 系统大巷 应力阻隔 切顶层位
下载PDF
Composite active control system of roof and side truss cable for large section coal roadway in fold coal pillar area 被引量:5
2
作者 Sheng-Rong XIE Er-Peng LI Fu-Lian HE Shou-Bao ZHANG Guang-Chao ZHANG Mao-Yu PANG 《Journal of Coal Science & Engineering(China)》 2013年第2期126-132,共7页
In order to solve the surrounding rock control problem of large section gangue replacement roadway under complicated conditions, this paper analyzed the impact to the roadway controlling produced by the geological con... In order to solve the surrounding rock control problem of large section gangue replacement roadway under complicated conditions, this paper analyzed the impact to the roadway controlling produced by the geological conditions such as high ground stress, folded structure tilted roof asymmetry and soft wall rock, and built the tilt layered roof structural mechanics model to clarify the increase span mechanism of the weak coal instability. Then, we proposed the combined control system including roof inclined truss cable, coal-side cable-channel steel and intensive bolt support. And then by building the structural mechanics model of roof inclined truss cable system, the support principle was described. Besides, according to this model, we deduced the calculation formula of cable anchoring force and its tensile stress. Finally surrounding rock control technology of large section roadway in fold coal pillar area was formed. Field practice shows that the greatest roof convergence of gangue replacement roadway is 158 mm and coal-side deformation is 243 mm. Roadway deformation is controlled effectively and technical support is provided for replacement mining. 展开更多
关键词 fold coal pillar area increase span mechanism roof inclined truss cable system coal-side cable-channel steel structural mechanics model
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部