The construction system of high rockfill dam is a highly complex system.In this paper,the complex system is divided into three subsystems ,namely the dam body filling subsystem,material allotment optimization subsyste...The construction system of high rockfill dam is a highly complex system.In this paper,the complex system is divided into three subsystems ,namely the dam body filling subsystem,material allotment optimization subsystem and transportation subsystem.And the three subsystems are respectively abstracted into simulation models.At last,the three subsystems are integrated into a construction simulation system of high rockfill dam.展开更多
文摘The construction system of high rockfill dam is a highly complex system.In this paper,the complex system is divided into three subsystems ,namely the dam body filling subsystem,material allotment optimization subsystem and transportation subsystem.And the three subsystems are respectively abstracted into simulation models.At last,the three subsystems are integrated into a construction simulation system of high rockfill dam.