The problem of stabilizing a class of large-scale non-linear multiple delay systems is considered.The complicated system is decomposed into several subsystems; each function of them is expressed by a set of components...The problem of stabilizing a class of large-scale non-linear multiple delay systems is considered.The complicated system is decomposed into several subsystems; each function of them is expressed by a set of components of the overall state vector,with interconnections between them, and the subsystems are coupled by the delayed state. In this paper, a method is devised to be a suitable choice of state feedback controls of every subsystems, moreover, it is proved that the large-scale system is exponential stable.展开更多
This research develops a comprehensive method to solve a combinatorial problem consisting of distribution system reconfiguration, capacitor allocation, and renewable energy resources sizing and siting simultaneously a...This research develops a comprehensive method to solve a combinatorial problem consisting of distribution system reconfiguration, capacitor allocation, and renewable energy resources sizing and siting simultaneously and to improve power system's accountability and system performance parameters. Due to finding solution which is closer to realistic characteristics, load forecasting, market price errors and the uncertainties related to the variable output power of wind based DG units are put in consideration. This work employs NSGA-II accompanied by the fuzzy set theory to solve the aforementioned multi-objective problem. The proposed scheme finally leads to a solution with a minimum voltage deviation, a maximum voltage stability, lower amount of pollutant and lower cost. The cost includes the installation costs of new equipment, reconfiguration costs, power loss cost, reliability cost, cost of energy purchased from power market, upgrade costs of lines and operation and maintenance costs of DGs. Therefore, the proposed methodology improves power quality, reliability and security in lower costs besides its preserve, with the operational indices of power distribution networks in acceptable level. To validate the proposed methodology's usefulness, it was applied on the IEEE 33-bus distribution system then the outcomes were compared with initial configuration.展开更多
A new hybrid optimization algorithm was presented by integrating the gravitational search algorithm (GSA) with the sequential quadratic programming (SQP), namely GSA-SQP, for solving global optimization problems a...A new hybrid optimization algorithm was presented by integrating the gravitational search algorithm (GSA) with the sequential quadratic programming (SQP), namely GSA-SQP, for solving global optimization problems and minimization of factor of safety in slope stability analysis. The new algorithm combines the global exploration ability of the GSA to converge rapidly to a near optimum solution. In addition, it uses the accurate local exploitation ability of the SQP to accelerate the search process and find an accurate solution. A set of five well-known benchmark optimization problems was used to validate the performance of the GSA-SQP as a global optimization algorithm and facilitate comparison with the classical GSA. In addition, the effectiveness of the proposed method for slope stability analysis was investigated using three ease studies of slope stability problems from the literature. The factor of safety of earth slopes was evaluated using the Morgenstern-Price method. The numerical experiments demonstrate that the hybrid algorithm converges faster to a significantly more accurate final solution for a variety of benchmark test functions and slope stability problems.展开更多
Mission planning was thoroughly studied in the areas of multiple intelligent agent systems,such as multiple unmanned air vehicles,and multiple processor systems.However,it still faces challenges due to the system comp...Mission planning was thoroughly studied in the areas of multiple intelligent agent systems,such as multiple unmanned air vehicles,and multiple processor systems.However,it still faces challenges due to the system complexity,the execution order constraints,and the dynamic environment uncertainty.To address it,a coordinated dynamic mission planning scheme is proposed utilizing the method of the weighted AND/OR tree and the AOE-Network.In the scheme,the mission is decomposed into a time-constraint weighted AND/OR tree,which is converted into an AOE-Network for mission planning.Then,a dynamic planning algorithm is designed which uses task subcontracting and dynamic re-decomposition to coordinate conflicts.The scheme can reduce the task complexity and its execution time by implementing real-time dynamic re-planning.The simulation proves the effectiveness of this approach.展开更多
Because connection number can express and process synthetic uncertainties caused by various uncertainties in the transmission network planning, a connection number model (CNM) was presented to compare the values of co...Because connection number can express and process synthetic uncertainties caused by various uncertainties in the transmission network planning, a connection number model (CNM) was presented to compare the values of connection number logically. This paper proposed a novel model for transmission network flexible planning with uncertainty. In the proposed planning model both certainty and uncertainty information were included, and the cost-benefit analysis method was used to evaluate the candidate schemes in the objective function. Its good adaptability and flexibility were illustrated through two examples.展开更多
This paper considers optimal feedback control for a general continuous time finite-dimensional deterministic system with finite horizon cost functional. A practically feasible algorithm to calculate the numerical solu...This paper considers optimal feedback control for a general continuous time finite-dimensional deterministic system with finite horizon cost functional. A practically feasible algorithm to calculate the numerical solution of the optimal feedback control by dynamic programming approach is developed. The highlights of this algorithm are: a) It is based on a convergent constructive algorithm for optimal feedback control law which was proposed by the authors before through an approximation for the viscosity solution of the time-space discretization scheme developed by dynamic programming method; b) The computation complexity is significantly reduced since only values of viscosity solution on some local cones around the optimal trajectory are calculated. Two numerical experiments are presented to illustrate the effectiveness and fastness of the algorithm.展开更多
文摘The problem of stabilizing a class of large-scale non-linear multiple delay systems is considered.The complicated system is decomposed into several subsystems; each function of them is expressed by a set of components of the overall state vector,with interconnections between them, and the subsystems are coupled by the delayed state. In this paper, a method is devised to be a suitable choice of state feedback controls of every subsystems, moreover, it is proved that the large-scale system is exponential stable.
文摘This research develops a comprehensive method to solve a combinatorial problem consisting of distribution system reconfiguration, capacitor allocation, and renewable energy resources sizing and siting simultaneously and to improve power system's accountability and system performance parameters. Due to finding solution which is closer to realistic characteristics, load forecasting, market price errors and the uncertainties related to the variable output power of wind based DG units are put in consideration. This work employs NSGA-II accompanied by the fuzzy set theory to solve the aforementioned multi-objective problem. The proposed scheme finally leads to a solution with a minimum voltage deviation, a maximum voltage stability, lower amount of pollutant and lower cost. The cost includes the installation costs of new equipment, reconfiguration costs, power loss cost, reliability cost, cost of energy purchased from power market, upgrade costs of lines and operation and maintenance costs of DGs. Therefore, the proposed methodology improves power quality, reliability and security in lower costs besides its preserve, with the operational indices of power distribution networks in acceptable level. To validate the proposed methodology's usefulness, it was applied on the IEEE 33-bus distribution system then the outcomes were compared with initial configuration.
文摘A new hybrid optimization algorithm was presented by integrating the gravitational search algorithm (GSA) with the sequential quadratic programming (SQP), namely GSA-SQP, for solving global optimization problems and minimization of factor of safety in slope stability analysis. The new algorithm combines the global exploration ability of the GSA to converge rapidly to a near optimum solution. In addition, it uses the accurate local exploitation ability of the SQP to accelerate the search process and find an accurate solution. A set of five well-known benchmark optimization problems was used to validate the performance of the GSA-SQP as a global optimization algorithm and facilitate comparison with the classical GSA. In addition, the effectiveness of the proposed method for slope stability analysis was investigated using three ease studies of slope stability problems from the literature. The factor of safety of earth slopes was evaluated using the Morgenstern-Price method. The numerical experiments demonstrate that the hybrid algorithm converges faster to a significantly more accurate final solution for a variety of benchmark test functions and slope stability problems.
基金Projects(61071096,61003233,61073103)supported by the National Natural Science Foundation of ChinaProjects(20100162110012,20110162110042)supported by the Research Fund for the Doctoral Program of Higher Education of China
文摘Mission planning was thoroughly studied in the areas of multiple intelligent agent systems,such as multiple unmanned air vehicles,and multiple processor systems.However,it still faces challenges due to the system complexity,the execution order constraints,and the dynamic environment uncertainty.To address it,a coordinated dynamic mission planning scheme is proposed utilizing the method of the weighted AND/OR tree and the AOE-Network.In the scheme,the mission is decomposed into a time-constraint weighted AND/OR tree,which is converted into an AOE-Network for mission planning.Then,a dynamic planning algorithm is designed which uses task subcontracting and dynamic re-decomposition to coordinate conflicts.The scheme can reduce the task complexity and its execution time by implementing real-time dynamic re-planning.The simulation proves the effectiveness of this approach.
基金the National Natural Science Founda-tion of China (No. 50177017)the Shanghai Key Scienceand Technology Research Program (No. 041612012)
文摘Because connection number can express and process synthetic uncertainties caused by various uncertainties in the transmission network planning, a connection number model (CNM) was presented to compare the values of connection number logically. This paper proposed a novel model for transmission network flexible planning with uncertainty. In the proposed planning model both certainty and uncertainty information were included, and the cost-benefit analysis method was used to evaluate the candidate schemes in the objective function. Its good adaptability and flexibility were illustrated through two examples.
文摘This paper considers optimal feedback control for a general continuous time finite-dimensional deterministic system with finite horizon cost functional. A practically feasible algorithm to calculate the numerical solution of the optimal feedback control by dynamic programming approach is developed. The highlights of this algorithm are: a) It is based on a convergent constructive algorithm for optimal feedback control law which was proposed by the authors before through an approximation for the viscosity solution of the time-space discretization scheme developed by dynamic programming method; b) The computation complexity is significantly reduced since only values of viscosity solution on some local cones around the optimal trajectory are calculated. Two numerical experiments are presented to illustrate the effectiveness and fastness of the algorithm.