期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
新型绷拉式索道的研究 被引量:3
1
作者 陈洁余 陈新 +3 位作者 候巨拉 陈新度 赵翼翔 单圣涤 《中南林业科技大学学报》 CAS CSCD 北大核心 2008年第2期104-108,共5页
研究了一种新型"绷拉式"索道结构.这种新型索道结构通过绷拉索与承载索的合力支撑,使得承载索不受悬挂线型的限制而能够按所需的安全高度沿地面地形架设,省去了传统索道中所必须设置的高大复杂的支架结构、中间转角站和上(下... 研究了一种新型"绷拉式"索道结构.这种新型索道结构通过绷拉索与承载索的合力支撑,使得承载索不受悬挂线型的限制而能够按所需的安全高度沿地面地形架设,省去了传统索道中所必须设置的高大复杂的支架结构、中间转角站和上(下)端的装(卸)站台,实现了索道的自由转弯.与传统的直承式索道相比,绷拉式索道建造成本大大降低,能消除安全隐患,能更好地保护索道通过地段的生态环境. 展开更多
关键词 工程索道 悬索工程 绷拉式索道 索道结构
下载PDF
Load compensation research on twicetension for loop anchor cable of inner lining in Yellow River-crossing tunnel 被引量:3
2
作者 Yin Juan Cao Shengrong +1 位作者 Qin Gan Yang Fan 《Engineering Sciences》 EI 2014年第1期77-86,共10页
The load compensation equipment for anchor cable named low retraction prestressed anchorage system with twice-tension(referred to as twice-tension anchorage system) is proposed in the paper. Calculation results of loo... The load compensation equipment for anchor cable named low retraction prestressed anchorage system with twice-tension(referred to as twice-tension anchorage system) is proposed in the paper. Calculation results of loop anchorage prestressing loss(PL) values of inner lining(IL)in Yellow River-crossing tunnel under two anchorage systems,including twice- tension anchorage system and HM(Chinese transliteration is huanmao)anchorage system,are introduced. The software ANSYS is selected to realize the three-dimensional(3D) finite element modeling to accomplish simulation and calculation works under the two anchorage systems,respectively. Stress processes of IL under the two working conditions,of which one is completed cable tensioning(CCT) and the other is water in the tunnel with the designed water pressure(DWP),are contrasted and analyzed. Impacts of prestressing forces of anchor cables on structural safety under the two anchorage systems are contrasted. The calculation results show that the twice-tension anchorage system can reduce PL effectively and then increase prestresses of wall concrete(WC). Meanwhile,the anchorage system has the advantages of improving security and stability of tunnel structure,reducing project costs and saving steel consumption. The research work is available to related design and construction of anchor cable,and is worthy of promotion and application. 展开更多
关键词 loop anchorage prestressing loss twice-tension load compensation nonlinear finite element Yellow River-crossing tunnel
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部