The increasing customers' demands in terms of speed of service and reduced cost at higher quality has generated a new platform on which manufacturing companies compete. This heightened challenge is virtually driving ...The increasing customers' demands in terms of speed of service and reduced cost at higher quality has generated a new platform on which manufacturing companies compete. This heightened challenge is virtually driving all manufacturing companies to introducing lean manufacturing principles into their production systems. This paper focuses on the analysis of the current state mapping of a case study and then proposes a future state mapping to the company. The extruder 60 production line of Denki wires and cables limited, Akure, Nigeria was carefully evaluated. Data were collected from actual operators on the shop floor and feedbacks from the customers at the Gemba. Denki's extruder 60 production line production lead time was massively reduced from 38.42 days to 5.16 days with a 12.86% waste reduction. At the end, a practical way of implementing this aspect of lean manufacturing was suggested.展开更多
文摘The increasing customers' demands in terms of speed of service and reduced cost at higher quality has generated a new platform on which manufacturing companies compete. This heightened challenge is virtually driving all manufacturing companies to introducing lean manufacturing principles into their production systems. This paper focuses on the analysis of the current state mapping of a case study and then proposes a future state mapping to the company. The extruder 60 production line of Denki wires and cables limited, Akure, Nigeria was carefully evaluated. Data were collected from actual operators on the shop floor and feedbacks from the customers at the Gemba. Denki's extruder 60 production line production lead time was massively reduced from 38.42 days to 5.16 days with a 12.86% waste reduction. At the end, a practical way of implementing this aspect of lean manufacturing was suggested.