To obtain a better placement result, a partitioning-based placement algorithm with wirelength prediction called HJ-Pl is presented. A new method is proposed to estimate proximity of interconnects in a netlist, which i...To obtain a better placement result, a partitioning-based placement algorithm with wirelength prediction called HJ-Pl is presented. A new method is proposed to estimate proximity of interconnects in a netlist, which is capable of predicting not only short interconnects but long interconnects accurately. The predicted wirelength is embedded into the partitioning tool of bisection-based global placement, which can guide our placement towards a solution with shorter interconnects. In addition, the timing objective can be handled within the algorithm by minimizing the critical path delay. Experimental results show that, compared to Capol0. 5, mPL6, and NTUplace, HJ-P1 outperforms these placers in terms of wirelength and run time. The improvements in terms of average wirelength over Capo10. 5, mPL6 and NPUplace are 13%, 3%, and 9% with only 19%, 91%, and 99% of their runtime, respectively. By integrating the predicted wirelength-driven clustering into Capo10. 5, the placer is able to reduce average wirelength by 3%. The timing-driven HJ-P1 can reduce the critical path delay by 23%.展开更多
This article discusses the dynamic state analysis of underwater towed-cable when tow-ship changes its speed in a direction making parabolic profile path. A three-dimensional model of underwater towed system is studied...This article discusses the dynamic state analysis of underwater towed-cable when tow-ship changes its speed in a direction making parabolic profile path. A three-dimensional model of underwater towed system is studied. The established governing equations for the system have been solved using the central implicit finite-difference method. The obtained difference non-linear coupled equations are solved by Newton's method and satisfactory results were achieved. The solution of this problem has practical importance in the estimation of dynamic loading and motion, and hence it is directly applicable to the enhancement of safety and the effectiveness of the offshore activities.展开更多
A new approach was proposed to construct a performance-driven rectilinear Steiner tree with simultaneous buffer insertion and wiresizing optimization (PDRST/BW) under a higher order resistance-inductance-capacitance (...A new approach was proposed to construct a performance-driven rectilinear Steiner tree with simultaneous buffer insertion and wiresizing optimization (PDRST/BW) under a higher order resistance-inductance-capacitance (RLC) delay model. This approach is based on the concept of sharing-buffer insertion and dynamic programming approach combined with a bottom-up rectilinear Steiner tree construction. The performances include the timing delay and the quality of signal waveform. The experimental results show that our proposed approach is scalable and obtains better performance than SP-tree and graph-RTBW approaches for the test signal nets.展开更多
基金The National Key Project of Scientific and Technical Supporting Programs (No.2006BAK07B04)
文摘To obtain a better placement result, a partitioning-based placement algorithm with wirelength prediction called HJ-Pl is presented. A new method is proposed to estimate proximity of interconnects in a netlist, which is capable of predicting not only short interconnects but long interconnects accurately. The predicted wirelength is embedded into the partitioning tool of bisection-based global placement, which can guide our placement towards a solution with shorter interconnects. In addition, the timing objective can be handled within the algorithm by minimizing the critical path delay. Experimental results show that, compared to Capol0. 5, mPL6, and NTUplace, HJ-P1 outperforms these placers in terms of wirelength and run time. The improvements in terms of average wirelength over Capo10. 5, mPL6 and NPUplace are 13%, 3%, and 9% with only 19%, 91%, and 99% of their runtime, respectively. By integrating the predicted wirelength-driven clustering into Capo10. 5, the placer is able to reduce average wirelength by 3%. The timing-driven HJ-P1 can reduce the critical path delay by 23%.
文摘This article discusses the dynamic state analysis of underwater towed-cable when tow-ship changes its speed in a direction making parabolic profile path. A three-dimensional model of underwater towed system is studied. The established governing equations for the system have been solved using the central implicit finite-difference method. The obtained difference non-linear coupled equations are solved by Newton's method and satisfactory results were achieved. The solution of this problem has practical importance in the estimation of dynamic loading and motion, and hence it is directly applicable to the enhancement of safety and the effectiveness of the offshore activities.
基金The National Natural Science Foundation of China (No. 90307017)
文摘A new approach was proposed to construct a performance-driven rectilinear Steiner tree with simultaneous buffer insertion and wiresizing optimization (PDRST/BW) under a higher order resistance-inductance-capacitance (RLC) delay model. This approach is based on the concept of sharing-buffer insertion and dynamic programming approach combined with a bottom-up rectilinear Steiner tree construction. The performances include the timing delay and the quality of signal waveform. The experimental results show that our proposed approach is scalable and obtains better performance than SP-tree and graph-RTBW approaches for the test signal nets.