期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
大型电子洁净厂房高大柱施工技术 被引量:2
1
作者 吴安瑞 肖合顺 +2 位作者 阮清辉 洪章霖 洪安梁 《绿色环保建材》 2019年第1期149-150,共2页
我国电子工业在快速发展的同时,对电子洁净厂房的施工质量要求也越来越高。而在厂房高大柱施工过程中,极易出现柱脚烂根、垂直度不满足要求等质量通病。本文从某大型电子洁净厂房的实践过程中总结经验,对高大柱的钢筋、架子、模板、混... 我国电子工业在快速发展的同时,对电子洁净厂房的施工质量要求也越来越高。而在厂房高大柱施工过程中,极易出现柱脚烂根、垂直度不满足要求等质量通病。本文从某大型电子洁净厂房的实践过程中总结经验,对高大柱的钢筋、架子、模板、混凝土四个方面进行分析和优化,为类似工程施工提供参考借鉴。 展开更多
关键词 高大 深化设计 工具式灯笼架 组合柱模 混凝土浇筑
下载PDF
Deformation prediction and analysis of underground mining during stacking of dry gangue in open-pit based on response surface methodology 被引量:6
2
作者 QIU Xian-yang CHEN Jia-yao +3 位作者 SHI Xiu-zhi ZHANG Shu ZHOU Jian CHEN Xin 《Journal of Central South University》 SCIE EI CAS CSCD 2018年第2期406-417,共12页
Deformation prediction and the analysis of underground goaf are important to the safe and efficient recovery of residual ore when shifting from open-pit mining to underground mining.To address the comprehensive proble... Deformation prediction and the analysis of underground goaf are important to the safe and efficient recovery of residual ore when shifting from open-pit mining to underground mining.To address the comprehensive problem of stability in the double mined-out area of the Tong-Lv-Shan(TLS)mine,which employed the dry stacked gangue technology,this paper applies the function fitting theory and a regression analysis method to screen the sensitive interval of four influencing factors based on single-factor experiments and the numerical simulation software FLAC3D.The influencing factors of the TLS mine consist of the column thickness(d),gob area span(D),boundary pillar thickness(h)and height of tailing gangue(H).The fitting degree between the four factors and the displacement of the gob roof(W)is reasonable because the correlation coefficient(R2)is greater than0.9701.After establishing29groups that satisfy the principles of Box-Behnken design(BBD),the dry gangue tailings process was re-simulated for the selected sensitive interval.Using a combination of an analysis of variance(ANOVA),regression equations and a significance analysis,the prediction results of the response surface methodology(RSM)show that the significant degree for the stability of the mined-out area for the factors satisfies the relationship of h>D>d>H.The importance of the four factors cannot be disregarded in a comparison of the prediction results of the engineering test stope in the TLS mine.By comparing the data of monitoring points and function prediction,the proposed method has shown promising results,and the prediction accuracy of RSM model is acceptable.The relative errors of the two test stopes are1.67%and3.85%,respectively,which yield satisfactory reliability and reference values for the mines. 展开更多
关键词 response surface methodology (RSM) Box-Behnken design (BBD) numerical simulation boundary pillar deformation prediction
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部