期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
分组域GRIS设备组网调整工作 被引量:2
1
作者 朱磊 《铁道通信信号》 2010年第11期62-64,共3页
简单介绍GRIS服务器的作用,并通过实例来说明GRIS服务器割接过程中的影响范围、工程分工、技术方案、具体步骤、应急预案以及割接后的验证。
关键词 GRIS服务器 组网调整 技术方案 功能验证
下载PDF
移动传输组网调整中实现多基站接入光口平滑割接
2
作者 王尊义 吴钦雄 蔡飚 《电信技术》 2006年第9期56-59,共4页
首先说明了随着业务和技术的发展移动传输组网架构调整的必然性,接着说明了通过光口桥接方法实现基站接入中继平滑调整的必要性,然后分析了两种不同的桥接方案并给出工程实施中较为合理的选择,最后介绍了方案在华为OptiX设备上实际应用... 首先说明了随着业务和技术的发展移动传输组网架构调整的必然性,接着说明了通过光口桥接方法实现基站接入中继平滑调整的必要性,然后分析了两种不同的桥接方案并给出工程实施中较为合理的选择,最后介绍了方案在华为OptiX设备上实际应用的配置方法。 展开更多
关键词 组网调整 ET155 光口桥接 平滑割接
下载PDF
On-Cam Operation of Counter-Rotating Type Hydroelectric Unit 被引量:1
3
作者 Toshiaki Suzuki Toshiaki Kanemoto 《Journal of Energy and Power Engineering》 2013年第10期1966-1973,共8页
The counter-rotating type hydroelectric unit, which is composed of the axial flow type tandem runners and the peculiar generator with double rotational armatures, has been proposed. In the unit, the front and the rear... The counter-rotating type hydroelectric unit, which is composed of the axial flow type tandem runners and the peculiar generator with double rotational armatures, has been proposed. In the unit, the front and the rear runners counter-drive the inner and the outer armatures of the generator, respectively. Besides, the flow direction at the rear runner outlet must coincide with the direction at the front runner inlet, because the angular momentum change through the rear runner must coincides with that through the front runner. In this paper, the tandem runners work at on-cam conditions in keeping the induced frequency constant, to provide the hydroelectric unit for the power grid system. The output and the hydraulic efficiency are affected by the adjusting angles of the front and the rear blades. Both optimum angles giving the maximum output or efficiency were presented at the various discharge/head circumstances, accompanying with the turbine performances. 展开更多
关键词 Hydroelectric unit counter rotation tandem runners double rotational armatures on-cam.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部