The main task of this paper is to explore the housing condition and housing policy in the vast but long-neglected middle-sized cities in China. Under the requirement of "Construction of 10 Million Units in 2011" fro...The main task of this paper is to explore the housing condition and housing policy in the vast but long-neglected middle-sized cities in China. Under the requirement of "Construction of 10 Million Units in 2011" from the central government, the affordable housing has started its nationwide building. Medium-sized cities are facing different developing periods but applying same housing policy as big cities. The paper examines the economic and social condition of the case city to find out the housing problems. It concludes that houses are affordable in these medium-sized cities, but housing policies are not implemented well. The paper proposed that housing affordability in medium-sized city is not about quantity but about quality. To keep houses affordable in these medium-sized cities, housing market, legislation, urban planning, public participation and intensive developments are all important.展开更多
Using physical model and numerical simulation techniques, some technical problems were studied systemati- cally, including layout of power station, measures of sediment and floating debris discharging, types of intake...Using physical model and numerical simulation techniques, some technical problems were studied systemati- cally, including layout of power station, measures of sediment and floating debris discharging, types of intake, embed- ded types of spiral ease, layout of underground powerhouse tunnel group and block reinforcement. It was optimal in technique and economy with the arrangement of powerhouse at the dam-toe of both banks + underground powerhouse in the right bank, as well as the intake with a single and small orifice. The sediment and debris problems could be solved with disperse sediment ejection and floating debris discharging holes. With the adoption of techniques for spiral cases such as heat and pressure preservation, cushion layer and combined embedding, the stable operation of generating units can be guaranteed. The arrangement of tailrace tunnel with sloping ceiling was better than that of tailrace surge tank. The technical requirements related to the embedding type of spiral case were proposed. The reinforcement of huge unfavorable blocks was discussed and the new idea for block reinforcement using anti-sliding piles and normal compressive stress of structural plane was put forward.展开更多
文摘The main task of this paper is to explore the housing condition and housing policy in the vast but long-neglected middle-sized cities in China. Under the requirement of "Construction of 10 Million Units in 2011" from the central government, the affordable housing has started its nationwide building. Medium-sized cities are facing different developing periods but applying same housing policy as big cities. The paper examines the economic and social condition of the case city to find out the housing problems. It concludes that houses are affordable in these medium-sized cities, but housing policies are not implemented well. The paper proposed that housing affordability in medium-sized city is not about quantity but about quality. To keep houses affordable in these medium-sized cities, housing market, legislation, urban planning, public participation and intensive developments are all important.
文摘Using physical model and numerical simulation techniques, some technical problems were studied systemati- cally, including layout of power station, measures of sediment and floating debris discharging, types of intake, embed- ded types of spiral ease, layout of underground powerhouse tunnel group and block reinforcement. It was optimal in technique and economy with the arrangement of powerhouse at the dam-toe of both banks + underground powerhouse in the right bank, as well as the intake with a single and small orifice. The sediment and debris problems could be solved with disperse sediment ejection and floating debris discharging holes. With the adoption of techniques for spiral cases such as heat and pressure preservation, cushion layer and combined embedding, the stable operation of generating units can be guaranteed. The arrangement of tailrace tunnel with sloping ceiling was better than that of tailrace surge tank. The technical requirements related to the embedding type of spiral case were proposed. The reinforcement of huge unfavorable blocks was discussed and the new idea for block reinforcement using anti-sliding piles and normal compressive stress of structural plane was put forward.