Based on the sticking point of the low intelligence of the existing management decision system,this paper puts forward the idea of enriching and refining the knowledge of the system and endowing it with the ability to...Based on the sticking point of the low intelligence of the existing management decision system,this paper puts forward the idea of enriching and refining the knowledge of the system and endowing it with the ability to learn by means of adopting three types of heterogeneous knowledge representation and knowledge management measures.At length,this paper outlines the basic framework of an intelligence system for the sake of management decision problem.展开更多
In this study, we looked at a method quantifying EEC (embodied energy and CO2) and the effect when we prolonged the building life time particularly through the durable improvement of the structure. Increasing the co...In this study, we looked at a method quantifying EEC (embodied energy and CO2) and the effect when we prolonged the building life time particularly through the durable improvement of the structure. Increasing the covering thickness of concrete for reinforcing bars and the earthquake-resistant strength are methods to increase the durability of the structure. The calculation method to obtain the quantity of concrete and reinforcing bars is provided. The EEC increase is evaluated from the 2005 input-output table in Japan. These results show that EE (embodied energy) in the construction phase is increased by 11% to 20% and EC (embodied CO2) 17% to 32%. However, annual EE is reduced 66% to 72% and EC 70% to 79%,展开更多
Poor power quality is really becoming an increasing phenomenon. Studies revealed that most companies, particularly multinationals in Nigeria, do not pay enough attention to the effects of poor power quality on their p...Poor power quality is really becoming an increasing phenomenon. Studies revealed that most companies, particularly multinationals in Nigeria, do not pay enough attention to the effects of poor power quality on their plant and equipment, and let the economic implications alone. The result is high production and maintenance cost. Findings also revealed that these companies loose an average of $50,000 annually owing to equipment damage (such as variable speed drives) caused by poor power quality. This paper focuses on the need for continuous monitoring and management of poor power quality disturbance parameters and the cost for economic implications of no addressing power quality issues.展开更多
This article presents an analysis of the economic impact of non-dispatchable generation on the cost of the energy supply. It aims to analyze the economic impact of the renewable generation in Spanish production and th...This article presents an analysis of the economic impact of non-dispatchable generation on the cost of the energy supply. It aims to analyze the economic impact of the renewable generation in Spanish production and thus to help prospective investors in renewable generation projects to analyze the situation of the Spanish electricity market. With that target, the current situation in Spain is shown and then using a MATLAB program, the economic impact of the renewable generation on the Spanish daily is analyzed.展开更多
The first stage project of Jiuquan wind energy base with 5.5-GW installed capacity is about to be completed. However, there exist several technical issues such as power transfer capability, electricity accommodation, ...The first stage project of Jiuquan wind energy base with 5.5-GW installed capacity is about to be completed. However, there exist several technical issues such as power transfer capability, electricity accommodation, frequency control and peak load regulation as well as system stability. In addition, the high capital cost and operation cost of the supporting transmission project invested and constructed by the Gansu Provincial Power Company will definitely have significant impacts on the management and economic profit of the Company. Through analysis of the construction and operation cost changes resulting from the wind power collection and delivery project, the author carried out research into the effects of developing large-scale wind power base on the management and economic benefits of power grid enterprises and proposed corresponding suggestions to make the related policies perfect.展开更多
Consumers' electricity cost keeps increasing over the time in most countries across the world. The main reason is that importing electricity from generation plants far from a load center is relatively expensive, as c...Consumers' electricity cost keeps increasing over the time in most countries across the world. The main reason is that importing electricity from generation plants far from a load center is relatively expensive, as costs are paid not only for generation but also for energy loss and network use. To this end, it is more economi- cal to use electricity generated by local distributed generations. In order to reduce customers' electricity cost, a new economic dispatch of smart distribution networks is proposed. Economic dispatch of smart distribution network is to meet load demand with the least consumers' electricity cost considering distributed generators, while recognizing all operational limits of generation and transmission facilities in a distribution network. Case study shows that consumers' electricity cost can be reduced by about 200/o through economic dispatch of distri- bution network. Further, generation cost and emission of distribution network are reduced as well.展开更多
基金The paper is supported by National Natural Science Foundation of China (No 70271002)
文摘Based on the sticking point of the low intelligence of the existing management decision system,this paper puts forward the idea of enriching and refining the knowledge of the system and endowing it with the ability to learn by means of adopting three types of heterogeneous knowledge representation and knowledge management measures.At length,this paper outlines the basic framework of an intelligence system for the sake of management decision problem.
文摘In this study, we looked at a method quantifying EEC (embodied energy and CO2) and the effect when we prolonged the building life time particularly through the durable improvement of the structure. Increasing the covering thickness of concrete for reinforcing bars and the earthquake-resistant strength are methods to increase the durability of the structure. The calculation method to obtain the quantity of concrete and reinforcing bars is provided. The EEC increase is evaluated from the 2005 input-output table in Japan. These results show that EE (embodied energy) in the construction phase is increased by 11% to 20% and EC (embodied CO2) 17% to 32%. However, annual EE is reduced 66% to 72% and EC 70% to 79%,
文摘Poor power quality is really becoming an increasing phenomenon. Studies revealed that most companies, particularly multinationals in Nigeria, do not pay enough attention to the effects of poor power quality on their plant and equipment, and let the economic implications alone. The result is high production and maintenance cost. Findings also revealed that these companies loose an average of $50,000 annually owing to equipment damage (such as variable speed drives) caused by poor power quality. This paper focuses on the need for continuous monitoring and management of poor power quality disturbance parameters and the cost for economic implications of no addressing power quality issues.
文摘This article presents an analysis of the economic impact of non-dispatchable generation on the cost of the energy supply. It aims to analyze the economic impact of the renewable generation in Spanish production and thus to help prospective investors in renewable generation projects to analyze the situation of the Spanish electricity market. With that target, the current situation in Spain is shown and then using a MATLAB program, the economic impact of the renewable generation on the Spanish daily is analyzed.
文摘The first stage project of Jiuquan wind energy base with 5.5-GW installed capacity is about to be completed. However, there exist several technical issues such as power transfer capability, electricity accommodation, frequency control and peak load regulation as well as system stability. In addition, the high capital cost and operation cost of the supporting transmission project invested and constructed by the Gansu Provincial Power Company will definitely have significant impacts on the management and economic profit of the Company. Through analysis of the construction and operation cost changes resulting from the wind power collection and delivery project, the author carried out research into the effects of developing large-scale wind power base on the management and economic benefits of power grid enterprises and proposed corresponding suggestions to make the related policies perfect.
基金supported in part by The National High Technology Research and Development of China 863 Program(2012AA050201)
文摘Consumers' electricity cost keeps increasing over the time in most countries across the world. The main reason is that importing electricity from generation plants far from a load center is relatively expensive, as costs are paid not only for generation but also for energy loss and network use. To this end, it is more economi- cal to use electricity generated by local distributed generations. In order to reduce customers' electricity cost, a new economic dispatch of smart distribution networks is proposed. Economic dispatch of smart distribution network is to meet load demand with the least consumers' electricity cost considering distributed generators, while recognizing all operational limits of generation and transmission facilities in a distribution network. Case study shows that consumers' electricity cost can be reduced by about 200/o through economic dispatch of distri- bution network. Further, generation cost and emission of distribution network are reduced as well.