期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
岩土工程勘察中存在的问题分析 被引量:4
1
作者 张福升 刘其英 《中国高新技术企业》 2015年第20期159-160,共2页
建筑施工时勘察工作的好坏和整个项目工程的经济设计参数能否有效合理,都离不开岩土工程勘察,其作为一项基本依据起着至关重要的作用。文章对如今我国岩土工程勘察工作中产生的问题展开讨论,在探究其原因的同时也针对性地制订了解决方... 建筑施工时勘察工作的好坏和整个项目工程的经济设计参数能否有效合理,都离不开岩土工程勘察,其作为一项基本依据起着至关重要的作用。文章对如今我国岩土工程勘察工作中产生的问题展开讨论,在探究其原因的同时也针对性地制订了解决方案与措施。 展开更多
关键词 岩土工程勘察 建筑施工 经济设计参数 工程质量 勘察管理制度
下载PDF
Optimized algorithm in mine production planning, mined material destination, and ultimate pit limit 被引量:1
2
作者 Rahimi ESMAEIL Moosavi EHSAN +1 位作者 Shirinabadi REZA Gholinejad MEHRAN 《Journal of Central South University》 SCIE EI CAS CSCD 2018年第6期1475-1488,共14页
An integral connection exists among the mine production planning, the mined material destination, and the ultimate pit limit (UPL) in the mining engineering economy. This relation is reinforced by real information a... An integral connection exists among the mine production planning, the mined material destination, and the ultimate pit limit (UPL) in the mining engineering economy. This relation is reinforced by real information and the benefits it engenders in the mining economy. Hence, it is important to create optimizing algorithms to reduce the errors of economic calculations. In this work, a logical mathematical algorithm that considers the important designing parameters and the mining economy is proposed. This algorithm creates an optimizing repetitive process among different designing constituents and directs them into the maximum amount of the mine economical parameters. This process will produce the highest amount of ores and the highest degree of safety. The modeling produces a new relation between the concept of the cutoff grade, mine designing, and mine planning, and it provides the maximum benefit by calculating the destination of the ores. The proposed algorithm is evaluated in a real case study. The results show that the net present value of the mine production is increased by 3% compared to previous methods of production design and UPL. 展开更多
关键词 mined material destination ultimate pit limit net present value production planning
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部