This article presents in detail the assembling and welding process technique of the steel box girder tuyere blocks of Taizhou Bridge. The application of this process technique effectively solves the problem of welding...This article presents in detail the assembling and welding process technique of the steel box girder tuyere blocks of Taizhou Bridge. The application of this process technique effectively solves the problem of welding stress release in tuyere block assembling and welding without increasing the number of turns of the blocks and overhead welding, thus avoiding possible structural deformation due to excessive accumulation of internal welding stress, greatly reducing the repeated deformation and correction work during assembling and welding, and ensuring the weld seam quality and overall dimensions of tuvere blocks of Taizhou Bridze.展开更多
The paper introduces a kind of full length recoverable resin metal bolts, expounds its structural principle and stress features, and gives some instances in laboratory tests and underground tests. The results show tha...The paper introduces a kind of full length recoverable resin metal bolts, expounds its structural principle and stress features, and gives some instances in laboratory tests and underground tests. The results show that full length recoverable resin metal bolts can be used for supporting the walls of class Ⅰ~Ⅲ mining gateways, that the anchoring force is 50 kN or so, and that the recoverability rate is more than 80%, thus the supporting effect is better than that of split set bolts.展开更多
Based on the idea of "bearing function separation", a structural member called shock absorber that makes use of its plastic deformation is presented for reducing the seismic response of the bridge. The desig...Based on the idea of "bearing function separation", a structural member called shock absorber that makes use of its plastic deformation is presented for reducing the seismic response of the bridge. The design criterion for matching material stress, strain and earthquake fortification aim, is also given. The analysis results show that the high speed railway box girder with the absorber in this paper has great reduction effect in seismic response of the bridge piers.展开更多
文摘This article presents in detail the assembling and welding process technique of the steel box girder tuyere blocks of Taizhou Bridge. The application of this process technique effectively solves the problem of welding stress release in tuyere block assembling and welding without increasing the number of turns of the blocks and overhead welding, thus avoiding possible structural deformation due to excessive accumulation of internal welding stress, greatly reducing the repeated deformation and correction work during assembling and welding, and ensuring the weld seam quality and overall dimensions of tuvere blocks of Taizhou Bridze.
文摘The paper introduces a kind of full length recoverable resin metal bolts, expounds its structural principle and stress features, and gives some instances in laboratory tests and underground tests. The results show that full length recoverable resin metal bolts can be used for supporting the walls of class Ⅰ~Ⅲ mining gateways, that the anchoring force is 50 kN or so, and that the recoverability rate is more than 80%, thus the supporting effect is better than that of split set bolts.
文摘Based on the idea of "bearing function separation", a structural member called shock absorber that makes use of its plastic deformation is presented for reducing the seismic response of the bridge. The design criterion for matching material stress, strain and earthquake fortification aim, is also given. The analysis results show that the high speed railway box girder with the absorber in this paper has great reduction effect in seismic response of the bridge piers.