A novel data acquisition system was successfully integrated on-board the Massey Ferguson 3,000 series agricultural tractors for measuring tractor-implement performance. A commercial load cell was incorporated into the...A novel data acquisition system was successfully integrated on-board the Massey Ferguson 3,000 series agricultural tractors for measuring tractor-implement performance. A commercial load cell was incorporated into the existing system for the needed tractor-implement performance, measurements. This system is capable of measuring, displaying and recording, in real-time, the tractor's theoretical travel speed, the actual travel speed, the engine speed, the fuel consumption rate, and the drawbar pull. Static calibration tests on various associated sensors for the required measurements show excellent linearity with correlation coefficients that are close to 1. The developed system was extensively and successfully field demonstrated for tractor-implement performance with offset disc harrows on dry, undisturbed loamy soils. Under these conditions, a ratio of tractor power to implement width is suggested. The data also show the existence of a linear relationship between fuel consumption per hectare and specific draught, for the 4 to 9 kN m^-1 range, which suggests the possibility of extending the American Society of Agricultural and Biological Engineers model of draught prediction to forecast fuel consumption. The configuration of the tractor-harrow combination, based on the measurement of the draught required under operational conditions, provides the manufacturers with a reliable indication of the recommended power required for each harrow model. With this type of information farmers can make decisions regarding selection of a suitable tractor-implement combination for their farms. As a consequence, there is improved tractor-harrow productivity and field efficiency.展开更多
This paper acquaints readers with the practice of effectiveness evaluation in the public sector. The purpose of this paper is to study performance measurement according to the changes in public sector reform by focusi...This paper acquaints readers with the practice of effectiveness evaluation in the public sector. The purpose of this paper is to study performance measurement according to the changes in public sector reform by focusing on performance-based budgeting in Russia. This paper suggests that the construction process of performance measurement should be aligned with outputs and outcomes of budget policy. The main research materials for this paper are based on data from a survey and follow-up interviews of budgetary managers and accountants. The survey result sets priorities and weighted some indicators to the measurement of effectiveness in the public sector. The data of this study were not large, but the study led to understanding how effectiveness is seen by budgetary managers and how measurement systems should be structured. Texts and contents from different sources such as financial annual reports and budgetary entities' websites provided insightful and interesting findings.展开更多
The paper analyzed characters of complicated system and discussed the reason of comprehensive evaluation, realization of flexible comprehensive evaluation was researched from prospect of dynamic measure selection of e...The paper analyzed characters of complicated system and discussed the reason of comprehensive evaluation, realization of flexible comprehensive evaluation was researched from prospect of dynamic measure selection of evaluation, balance of functionality and harmony, uncertainty factor. In the end, multistage flexible comprehensive evaluation of complicated system was applied to performance evaluation of firm.展开更多
In the banking system, a context characterized by growing instability and by the speed of evolution of business dynamics, the system of corporate governance plays a key role, both for large banks and for banks with a ...In the banking system, a context characterized by growing instability and by the speed of evolution of business dynamics, the system of corporate governance plays a key role, both for large banks and for banks with a smaller size. The paper aims to investigate the influence of corporate governance of the banks that operate in the cooperative credit system on performance and quality of loans, over the years 2010-2011-2012. In order to achieve this aim, the following research hypotheses have been formulated: There is a statistically significant relationship between the size and the structure of the board and banks Performance operating in the cooperative credit system; there is a statistically significant relationship between the size and structure of the board and the credit quality of banks operating in the cooperative credit system. The analysis is conducted on a sample composed of 48 Italian banks, divided into 24 cooperative banks and 24 popular banks. The sample is made up of banks from all over Italy and very different in terms of dimension. For the sample construction, data relative to governance of banks were collected from the balance sheets in the period from June to August 2014. Financial-economic data were collected from the Financial Statements and from Bankscope database. The methodology of analysis is based on multivariate OLS (ordinary least squares) regression models. The main results refer to the presence of significant relationships between board dimension and the quality of loans and among the number of committees and performance and the quality of loans. The presence of a significant and negative relationship between the board dimension and the ratio of impaired loans to gross loans indicates the possibility that enlargement of board dimension allows a better quality of loans. The presence of a positive relationship between the number of committees and the ratio of impaired loans to gross loans signals the possibility that a greater number of committees can produce a worse quality of loans. The presence of a negative relationship between the number of committees and bank performance suggests to limit and manage the complexity of governance in banks operating in the cooperative credit system.展开更多
The current research attempts to revitalize contingency leadership theory. Instead of focusing on subordinate attributes as a substitute for leadership theory, this study examines leader's human capital attributes as...The current research attempts to revitalize contingency leadership theory. Instead of focusing on subordinate attributes as a substitute for leadership theory, this study examines leader's human capital attributes as a leadership contingency variable. This paper offers a fresh perspective to contingency leadership literature by exploring a new set of variables. Addressing leader-member exchange (LMX) rather than the conventional focus on leader's behaviors, this study examines previously untested contingency variables. Using a matched sample of leaders and employees from Portuguese firms, this study examines leader's education and leader's organizational tenure as alternatives for LMX with assessed job performance and organizational citizenship as dependent variables. Testing new independent variables sheds additional light on contingency approaches to leadership; as a result, this paper improves the current state of research on contingency leadership. Results seem to indicate that leader's education is an alternative for LMX as well as suggesting that the leader's organizational tenure improves LMX. This paper proposes that research focusing on the substitute for leadership may need to examine a different set of variables to determine the viability of contingency approaches to leadership.展开更多
The advantages of OPV (organic photovoltaic) are low cost, little pollution and flexible. But challenge for OPV manufacture still is lacking of accurately performance measurement due to capacitance issue. Firstly, c...The advantages of OPV (organic photovoltaic) are low cost, little pollution and flexible. But challenge for OPV manufacture still is lacking of accurately performance measurement due to capacitance issue. Firstly, characterization of OPV requires considering the slowly temporal response due to capacitance effect, and the relative I-V (current-voltage) curves are strongly dependent on the voltage sweep direction, even for the sweep time only in few seconds or less. Secondly, the IPCE (incident photon-to-electron conversion efficiency) also shows the slowly temporal response due to capacitance effect and is dependent on the wavelength of the incident light. Furthermore, the related features for measuring I-V curves are more sensitive with temperature due to non-linear characteristics issue, but current IPCE spectra of OPV are similar to that happened in conventional crystalline Si or amorphous silicon devices. In this work, we developed a RTOSM (real-time one-sweep method) applied both in I-V and IPCE to analysis different electronic transport materials, and result showed this new approach proposed a good way to slow down testing time and having better accuracy for OPV measurement by eliminating acceptance effect instantly.展开更多
The main objective of this paper is to propose a conceptual model about the influence of lean, agile, resilient, and green (LARG) practices on supply chain operational, economic and environmental performance. This m...The main objective of this paper is to propose a conceptual model about the influence of lean, agile, resilient, and green (LARG) practices on supply chain operational, economic and environmental performance. This model is based on the literature review about the four supply chain management paradigms and also performance measurement systems. This paper contributes to the literature by introducing a new model to improve the leanness, agility, resilience, and greenness of manufacturing supply chains. Among the suggested LARG practices, the ones influencing more the supply chain performance are the just in time and also the supplier relationships. Also the supply chain performance measures with more LARG practices influencing them are the inventory levels and the time, that is, the supply chain's operational performance is the most affected by the simultaneous paradigms deployment in the supply chain.展开更多
The agricultural comprehensive development project performance evaluation refers to the evaluation and assessment of the expected target original and effectiveness after the completion of a project, discuss how to acc...The agricultural comprehensive development project performance evaluation refers to the evaluation and assessment of the expected target original and effectiveness after the completion of a project, discuss how to according to different projects to form a reasonable evaluation system for agricultural comprehensive development project, make a reasonable assessment, which can not only ensure the project quality, but also to achieve the project plans to further improve and perfect, make agricultural development operation became more efficient, so it has the practical significance. This paper describes the construction of the performance evaluation system of agricultural comprehensive development project problems, and puts forward some countermeasures for construction of agricultural comprehensive development project performance evaluation system.展开更多
文摘A novel data acquisition system was successfully integrated on-board the Massey Ferguson 3,000 series agricultural tractors for measuring tractor-implement performance. A commercial load cell was incorporated into the existing system for the needed tractor-implement performance, measurements. This system is capable of measuring, displaying and recording, in real-time, the tractor's theoretical travel speed, the actual travel speed, the engine speed, the fuel consumption rate, and the drawbar pull. Static calibration tests on various associated sensors for the required measurements show excellent linearity with correlation coefficients that are close to 1. The developed system was extensively and successfully field demonstrated for tractor-implement performance with offset disc harrows on dry, undisturbed loamy soils. Under these conditions, a ratio of tractor power to implement width is suggested. The data also show the existence of a linear relationship between fuel consumption per hectare and specific draught, for the 4 to 9 kN m^-1 range, which suggests the possibility of extending the American Society of Agricultural and Biological Engineers model of draught prediction to forecast fuel consumption. The configuration of the tractor-harrow combination, based on the measurement of the draught required under operational conditions, provides the manufacturers with a reliable indication of the recommended power required for each harrow model. With this type of information farmers can make decisions regarding selection of a suitable tractor-implement combination for their farms. As a consequence, there is improved tractor-harrow productivity and field efficiency.
文摘This paper acquaints readers with the practice of effectiveness evaluation in the public sector. The purpose of this paper is to study performance measurement according to the changes in public sector reform by focusing on performance-based budgeting in Russia. This paper suggests that the construction process of performance measurement should be aligned with outputs and outcomes of budget policy. The main research materials for this paper are based on data from a survey and follow-up interviews of budgetary managers and accountants. The survey result sets priorities and weighted some indicators to the measurement of effectiveness in the public sector. The data of this study were not large, but the study led to understanding how effectiveness is seen by budgetary managers and how measurement systems should be structured. Texts and contents from different sources such as financial annual reports and budgetary entities' websites provided insightful and interesting findings.
文摘The paper analyzed characters of complicated system and discussed the reason of comprehensive evaluation, realization of flexible comprehensive evaluation was researched from prospect of dynamic measure selection of evaluation, balance of functionality and harmony, uncertainty factor. In the end, multistage flexible comprehensive evaluation of complicated system was applied to performance evaluation of firm.
文摘In the banking system, a context characterized by growing instability and by the speed of evolution of business dynamics, the system of corporate governance plays a key role, both for large banks and for banks with a smaller size. The paper aims to investigate the influence of corporate governance of the banks that operate in the cooperative credit system on performance and quality of loans, over the years 2010-2011-2012. In order to achieve this aim, the following research hypotheses have been formulated: There is a statistically significant relationship between the size and the structure of the board and banks Performance operating in the cooperative credit system; there is a statistically significant relationship between the size and structure of the board and the credit quality of banks operating in the cooperative credit system. The analysis is conducted on a sample composed of 48 Italian banks, divided into 24 cooperative banks and 24 popular banks. The sample is made up of banks from all over Italy and very different in terms of dimension. For the sample construction, data relative to governance of banks were collected from the balance sheets in the period from June to August 2014. Financial-economic data were collected from the Financial Statements and from Bankscope database. The methodology of analysis is based on multivariate OLS (ordinary least squares) regression models. The main results refer to the presence of significant relationships between board dimension and the quality of loans and among the number of committees and performance and the quality of loans. The presence of a significant and negative relationship between the board dimension and the ratio of impaired loans to gross loans indicates the possibility that enlargement of board dimension allows a better quality of loans. The presence of a positive relationship between the number of committees and the ratio of impaired loans to gross loans signals the possibility that a greater number of committees can produce a worse quality of loans. The presence of a negative relationship between the number of committees and bank performance suggests to limit and manage the complexity of governance in banks operating in the cooperative credit system.
文摘The current research attempts to revitalize contingency leadership theory. Instead of focusing on subordinate attributes as a substitute for leadership theory, this study examines leader's human capital attributes as a leadership contingency variable. This paper offers a fresh perspective to contingency leadership literature by exploring a new set of variables. Addressing leader-member exchange (LMX) rather than the conventional focus on leader's behaviors, this study examines previously untested contingency variables. Using a matched sample of leaders and employees from Portuguese firms, this study examines leader's education and leader's organizational tenure as alternatives for LMX with assessed job performance and organizational citizenship as dependent variables. Testing new independent variables sheds additional light on contingency approaches to leadership; as a result, this paper improves the current state of research on contingency leadership. Results seem to indicate that leader's education is an alternative for LMX as well as suggesting that the leader's organizational tenure improves LMX. This paper proposes that research focusing on the substitute for leadership may need to examine a different set of variables to determine the viability of contingency approaches to leadership.
文摘The advantages of OPV (organic photovoltaic) are low cost, little pollution and flexible. But challenge for OPV manufacture still is lacking of accurately performance measurement due to capacitance issue. Firstly, characterization of OPV requires considering the slowly temporal response due to capacitance effect, and the relative I-V (current-voltage) curves are strongly dependent on the voltage sweep direction, even for the sweep time only in few seconds or less. Secondly, the IPCE (incident photon-to-electron conversion efficiency) also shows the slowly temporal response due to capacitance effect and is dependent on the wavelength of the incident light. Furthermore, the related features for measuring I-V curves are more sensitive with temperature due to non-linear characteristics issue, but current IPCE spectra of OPV are similar to that happened in conventional crystalline Si or amorphous silicon devices. In this work, we developed a RTOSM (real-time one-sweep method) applied both in I-V and IPCE to analysis different electronic transport materials, and result showed this new approach proposed a good way to slow down testing time and having better accuracy for OPV measurement by eliminating acceptance effect instantly.
文摘The main objective of this paper is to propose a conceptual model about the influence of lean, agile, resilient, and green (LARG) practices on supply chain operational, economic and environmental performance. This model is based on the literature review about the four supply chain management paradigms and also performance measurement systems. This paper contributes to the literature by introducing a new model to improve the leanness, agility, resilience, and greenness of manufacturing supply chains. Among the suggested LARG practices, the ones influencing more the supply chain performance are the just in time and also the supplier relationships. Also the supply chain performance measures with more LARG practices influencing them are the inventory levels and the time, that is, the supply chain's operational performance is the most affected by the simultaneous paradigms deployment in the supply chain.
文摘The agricultural comprehensive development project performance evaluation refers to the evaluation and assessment of the expected target original and effectiveness after the completion of a project, discuss how to according to different projects to form a reasonable evaluation system for agricultural comprehensive development project, make a reasonable assessment, which can not only ensure the project quality, but also to achieve the project plans to further improve and perfect, make agricultural development operation became more efficient, so it has the practical significance. This paper describes the construction of the performance evaluation system of agricultural comprehensive development project problems, and puts forward some countermeasures for construction of agricultural comprehensive development project performance evaluation system.