The reliability and maintainability of electrical system of drum shearer at Parvade. 1 Coal Mine in central Iran was analyzed. The maintenance and failure data were collected during 19 months of shearer operation. Acc...The reliability and maintainability of electrical system of drum shearer at Parvade. 1 Coal Mine in central Iran was analyzed. The maintenance and failure data were collected during 19 months of shearer operation. According to trend and serial correlation tests, the data were independent and identically distributed (iid) and therefore the statistical techniques were used for modeling. The data analysis show that the time between failures (TBF) and time to repair (TTR) data obey the lognormal and Weibull 3 parameters distribution respectively. Reliability-based preventive maintenance time intervals for electrical system of the drum shearer were calculated with regard to reliability plot. The reliability-based maintenance intervals for 90%, 80%, 70% and 50% reliability level are respectively 9.91, 17.96, 27.56 and 56.1 h. Also the calculations show that time to repair (TTR) of this system varies in range 0.17-4 h with 1.002 h as mean time to repair (MTTR). There is a 80% chance that the electrical system of shearer of Parvade. 1 mine repair will be accomplished within 1.45 h.展开更多
This paper presents a generalized model for determining minimum cost preventive maintenance schedules for a maintained reliability system. Through balancing the cost of system failure during operation against the cos...This paper presents a generalized model for determining minimum cost preventive maintenance schedules for a maintained reliability system. Through balancing the cost of system failure during operation against the cost of planned maintenance, an optimal policy is established which minimizes the expected cost rate. A simple equation to determine the optimal period between maintenances for a system with the known failure distribution is acquired, and the calculation for the system with Gamma failure distribution is given.展开更多
Electrochemical extraction of contaminants from soils is a promising soil decontamination technology. Various experiments have been conducted to study electrochemical reactions and geochemical processes in the electro...Electrochemical extraction of contaminants from soils is a promising soil decontamination technology. Various experiments have been conducted to study electrochemical reactions and geochemical processes in the electrochemical extraction using different experimental apparatuses. This paper presents the development of a new closed two-dimensional(2D) apparatus that can better simulate the field application of the technology and accurately monitor the most important electrochemical parameters to understand the process. The innovative features of the new apparatus include the outer and inner electrodes designed to apply a non-uniform electrical field across the specimen as in the field electrochemical remediation process, the probes installed to measure the 2D distribution of electrical voltage, and the gas and fluid volume measurement devices used to accurately monitor the gas generation and electroosmotic flow rates at both electrodes as a function of time. The components of this new apparatus and the features of each component are described. The operating procedure and some typical results from three experiments with the apparatus are demonstrated. The results show that the variation of the gas generation rate is in good agreement with the electric current. Their relation provides a valid evaluation for electrochemical behavior of the system and Faraday's laws of electrolysis. The 2D profiles of cadmium concentration and voltage distribution at the end of the experiment reveal the great effects of a non-uniform electrical field on the contaminant mobilization.展开更多
文摘The reliability and maintainability of electrical system of drum shearer at Parvade. 1 Coal Mine in central Iran was analyzed. The maintenance and failure data were collected during 19 months of shearer operation. According to trend and serial correlation tests, the data were independent and identically distributed (iid) and therefore the statistical techniques were used for modeling. The data analysis show that the time between failures (TBF) and time to repair (TTR) data obey the lognormal and Weibull 3 parameters distribution respectively. Reliability-based preventive maintenance time intervals for electrical system of the drum shearer were calculated with regard to reliability plot. The reliability-based maintenance intervals for 90%, 80%, 70% and 50% reliability level are respectively 9.91, 17.96, 27.56 and 56.1 h. Also the calculations show that time to repair (TTR) of this system varies in range 0.17-4 h with 1.002 h as mean time to repair (MTTR). There is a 80% chance that the electrical system of shearer of Parvade. 1 mine repair will be accomplished within 1.45 h.
文摘This paper presents a generalized model for determining minimum cost preventive maintenance schedules for a maintained reliability system. Through balancing the cost of system failure during operation against the cost of planned maintenance, an optimal policy is established which minimizes the expected cost rate. A simple equation to determine the optimal period between maintenances for a system with the known failure distribution is acquired, and the calculation for the system with Gamma failure distribution is given.
基金Supported by the National Natural Science Foundation of China(41201303,20807028,41372262)the Fundamental Research for the Central Universities(14CX02052A,14CX02191A)+1 种基金the Qingdao Science and Technology Program for young scientists(14-2-4-86-jch)the State Key Laboratory of Pollution Control and Resource Reuse Foundation(PCRRF13023)
文摘Electrochemical extraction of contaminants from soils is a promising soil decontamination technology. Various experiments have been conducted to study electrochemical reactions and geochemical processes in the electrochemical extraction using different experimental apparatuses. This paper presents the development of a new closed two-dimensional(2D) apparatus that can better simulate the field application of the technology and accurately monitor the most important electrochemical parameters to understand the process. The innovative features of the new apparatus include the outer and inner electrodes designed to apply a non-uniform electrical field across the specimen as in the field electrochemical remediation process, the probes installed to measure the 2D distribution of electrical voltage, and the gas and fluid volume measurement devices used to accurately monitor the gas generation and electroosmotic flow rates at both electrodes as a function of time. The components of this new apparatus and the features of each component are described. The operating procedure and some typical results from three experiments with the apparatus are demonstrated. The results show that the variation of the gas generation rate is in good agreement with the electric current. Their relation provides a valid evaluation for electrochemical behavior of the system and Faraday's laws of electrolysis. The 2D profiles of cadmium concentration and voltage distribution at the end of the experiment reveal the great effects of a non-uniform electrical field on the contaminant mobilization.