To provide some feasible condition-based maintenance (CBM) decision making methods for civil aeroengine, firstly, the theory of aeroengine CBM decision making is described. The proportional intensity(PI) model is ...To provide some feasible condition-based maintenance (CBM) decision making methods for civil aeroengine, firstly, the theory of aeroengine CBM decision making is described. The proportional intensity(PI) model is established based on the reliability and condition monitoring data. According to the model, the decision making methods are proposed for the optimal preventive maintenance(PM) interval and removal. Then, the time on wing (TOW) is predicted by collecting actual data based on the engine age and operating conditions. Finally, an example of a fleet for CF6-80C2 engines is illustrated. It shows that sufficient engine operation data are the key of accurate decision making. Results indicate that the CBM decision making methods are helpful for engineers in airlines to control engine maintenance actions and TOW, thus decreasing risks and maintenance costs.展开更多
According to the failure characteristics of aircraft structure, a delay-time model is an effective method to optimize maintenance for aircraft structure. To imitate the practical situation as much as possible, imperfe...According to the failure characteristics of aircraft structure, a delay-time model is an effective method to optimize maintenance for aircraft structure. To imitate the practical situation as much as possible, imperfect inspections, thresholds and repeated intervals are concerned in delay-time models. Since the suggestion by the existing delay-time models that the inspections are implemented in an infinite time span lacks practical value, a de- lay-time model with imperfect inspection within a finite time span is proposed. In the model, the nonhomogenous Poisson process is adopted to obtain the renewal probabilities between two different successive inspections on de- fects or failures. An algorithm is applied based on the Nelder-Mead downhill simplex method to solve the model. Finally, a numerical example proves the validity and effectiveness of the model.展开更多
Equipment plays an important role in open pit mining industry and its cost competence at efficient operation and maintenance techniques centered on reliability can lead to significant cost reduction.The application of...Equipment plays an important role in open pit mining industry and its cost competence at efficient operation and maintenance techniques centered on reliability can lead to significant cost reduction.The application of optimal maintenance process was investigated for minimizing the equipment breakdowns and downtimes in Sungun Copper Mine.It results in the improved efficiency and productivity of the equipment and lowered expenses as well as the increased profit margin.The field operating data of 10 trucks are used to estimate the failure and maintenance profile for each component,and modeling and simulation are accomplished by using reliability block diagram method.Trend analysis was then conducted to select proper probabilistic model for maintenance profile.Then reliability of the system was evaluated and importance of each component was computed by weighted importance measure method.This analysis led to identify the items with critical impact on availability of overall equipment in order to prioritize improvement decisions.Later,the availability of trucks was evaluated using Monte Carlo simulation and it is revealed that the uptime of the trucks is around 11000 h at 12000 operation hours.Finally,uncertainty analysis was performed to account for the uncertainty sources in data and models.展开更多
Based on the log-linear virtual age process, an imperfect preventive maintenance policy for numerical control(NC)machine tools with random maintenance quality is proposed. The proposed model is a combination of the Ki...Based on the log-linear virtual age process, an imperfect preventive maintenance policy for numerical control(NC)machine tools with random maintenance quality is proposed. The proposed model is a combination of the Kijima type virtual age model and the failure intensity adjustment model. Maintenance intervals of the proposed hybrid model are derived when the failure intensity increase factor and the restoration factor are both random variables with uniform distribution. The optimal maintenance policy in infinite time horizon is presented. A numerical example is given when the failures of NC machine tools are described by the log-linear process. Finally, a discussion is presented to show how the optimal results depend on the different cost parameters.展开更多
A finite-rate method is used to simulate the three-dimensional combustion process in a plasma generator with CH4 as the fuel. The simulation was run with RNG k-ε model to simulate turbulence, with eddy-dissipation-co...A finite-rate method is used to simulate the three-dimensional combustion process in a plasma generator with CH4 as the fuel. The simulation was run with RNG k-ε model to simulate turbulence, with eddy-dissipation-concept (EDC) model to simulate the combustion and with discrete ordinates model to simulate radiation. The numerical results show that the flow field characteristics and the parameter distributions are under the condition of rich fuels, and these results provide valuable information when optimizing the plasma generator design and organizing its flow fields.展开更多
Most warranty cost models based on preventive maintenance operations are assumed that products improve at each preventive maintenance (PM) operation and the failure rate is reduced to the failure rate of new product...Most warranty cost models based on preventive maintenance operations are assumed that products improve at each preventive maintenance (PM) operation and the failure rate is reduced to the failure rate of new products or to some specified level. To make warranty cost models more suitable to real operations, a modeling method of the PM warranty cost was proposed with the situation where each PM operation slowed the rate of product degradation. A warranty cost model was built on PM operations. On the basis of the cost model, both without and with reliability limit PM warranty policy, algorithms were presented to derive the optimal PM number and the optimal PM interval with an objective of minimizing expected total warranty cost over a t'mite warranty period. Finally, to demonstrate the feasibility of the presented modeling method, Weibuil distribution cases were tested by numerical simulations. The simulation results indicate that the proposed modeling method is feasible and valid for resolving the optimal solution of the product warranty cost.展开更多
The authors developed a prototype of a warship maintenance system. The process started by defining the maintenance requirements of warship equipment. Next, a planning scheme was development for a maintenance network. ...The authors developed a prototype of a warship maintenance system. The process started by defining the maintenance requirements of warship equipment. Next, a planning scheme was development for a maintenance network. An optimization target for the plan and indexes for assessment were established. Based on the above work, a simulation model was proposed with two layers: a base and a workshop. Dispatching rules were then formulated for the simulation. Experimental results proved the validity of the model and the dispatching algorithm. It was found that the model can solve the capacity evaluation problem for maintenance systems and provides a scientific basis for decision-maker to make decisions regarding equipment maintenance.展开更多
Based on the theory of reliability, this paper studies the preventive maintenance strategy of the simulator with incomplete maintenance, and establishes the preventive maintenance model with the aim of simulating the ...Based on the theory of reliability, this paper studies the preventive maintenance strategy of the simulator with incomplete maintenance, and establishes the preventive maintenance model with the aim of simulating the maintenance cost and simulating machine availability. The main contents of this paper are as follows: Firstly, this paper introduces the background and significance of this paper, expatiates the relevant concepts and mathematical foundation of simulator maintenance related theory and reliability maintenance thought, simulator performance degradation law, Weibull parameter estimation method, As the center of the maintenance (RCM) theory of system maintenance decision analysis.展开更多
This paper presents the theory,method,and application of performance-based pavement needs assessment at a state level,using the Pennsylvania Interstate System as an example.First,a general framework is presented for t...This paper presents the theory,method,and application of performance-based pavement needs assessment at a state level,using the Pennsylvania Interstate System as an example.First,a general framework is presented for the pavement asset management and a general optimization model is established for the pavement maintenance and rehabilitation needs assessment.Also,the bundling of pavement segments for the project implementation is discussed.Using the examples of Statewide Transportation Improvement Plan and Long Range Transportation Plan for Pennsylvania Interstate System,the application of performance-based pavement needs assessment is demonstrated.It is shown that unconstrained analysis can help decision-makers investigate the real maintenance and rehabilitation needs;financially-constrained analysis can help decision-makers select projects for implementation and examine the corresponding future pavement conditions.Trade-off analysis can help decision-makers investigate the outcomes of different investment levels on pavement maintenance and rehabilitation and make the final decision on the investment level.The proposed case study provides a good example of performance-based pavement needs assessment for developing countries.展开更多
Rivers in the Liaohe River Estuary area have been seriously polluted by discharges of wastewater containing petroleum pol- lutants and nutrients. In this paper, The Enhanced Stream Water Quality Model (QUAL2K) and i...Rivers in the Liaohe River Estuary area have been seriously polluted by discharges of wastewater containing petroleum pol- lutants and nutrients. In this paper, The Enhanced Stream Water Quality Model (QUAL2K) and its revised model as well as One-dimensional Tide Mean Model (1D model) were applied to predict and assess the water quality of the tidal fiver reach of the Liaohe River Estuary. Dissolved oxygen (DO), biochemical oxygen demand (BODs), ammonia nitrogen (NH3-N) and total phosphorus (TP) were chosen as water quality indices in the two model simulations. The modelled results show that the major reasons for degraded rivers remain petroleum and non-point source pollution. Tidal water also has a critical effect on the variation of water quality. The sensitivity analysis identifies that flow rate, point load and diffuse load are the most sensitive parameters for the four water quality indices in the revised QUAL2K simulation. Uncertainty analysis based on a Monte Carlo simulation gives the probability distribution of the four wa- ter quality indices at two locations (6.50 km and 44.84 km from the river mouth). The statistical outcomes indicate that the observed data fall within the 90% confidence intervals at all sites measured, and show that the revised QUAL2K gives better results in simulating the water quality of a tidal fiver.展开更多
基金the National Natural Science Foundation of China(60672164)the National High Technology Research and Development Program of China(863Program)(2006AA04Z427)~~
文摘To provide some feasible condition-based maintenance (CBM) decision making methods for civil aeroengine, firstly, the theory of aeroengine CBM decision making is described. The proportional intensity(PI) model is established based on the reliability and condition monitoring data. According to the model, the decision making methods are proposed for the optimal preventive maintenance(PM) interval and removal. Then, the time on wing (TOW) is predicted by collecting actual data based on the engine age and operating conditions. Finally, an example of a fleet for CF6-80C2 engines is illustrated. It shows that sufficient engine operation data are the key of accurate decision making. Results indicate that the CBM decision making methods are helpful for engineers in airlines to control engine maintenance actions and TOW, thus decreasing risks and maintenance costs.
基金Supported by the National Natural Science Foundation of China(61079013)the Natural Science Fund Project in Jiangsu Province(BK2011737)~~
文摘According to the failure characteristics of aircraft structure, a delay-time model is an effective method to optimize maintenance for aircraft structure. To imitate the practical situation as much as possible, imperfect inspections, thresholds and repeated intervals are concerned in delay-time models. Since the suggestion by the existing delay-time models that the inspections are implemented in an infinite time span lacks practical value, a de- lay-time model with imperfect inspection within a finite time span is proposed. In the model, the nonhomogenous Poisson process is adopted to obtain the renewal probabilities between two different successive inspections on de- fects or failures. An algorithm is applied based on the Nelder-Mead downhill simplex method to solve the model. Finally, a numerical example proves the validity and effectiveness of the model.
基金the support of the Maintenance Department of Mobin Co.Sungun Copper mine
文摘Equipment plays an important role in open pit mining industry and its cost competence at efficient operation and maintenance techniques centered on reliability can lead to significant cost reduction.The application of optimal maintenance process was investigated for minimizing the equipment breakdowns and downtimes in Sungun Copper Mine.It results in the improved efficiency and productivity of the equipment and lowered expenses as well as the increased profit margin.The field operating data of 10 trucks are used to estimate the failure and maintenance profile for each component,and modeling and simulation are accomplished by using reliability block diagram method.Trend analysis was then conducted to select proper probabilistic model for maintenance profile.Then reliability of the system was evaluated and importance of each component was computed by weighted importance measure method.This analysis led to identify the items with critical impact on availability of overall equipment in order to prioritize improvement decisions.Later,the availability of trucks was evaluated using Monte Carlo simulation and it is revealed that the uptime of the trucks is around 11000 h at 12000 operation hours.Finally,uncertainty analysis was performed to account for the uncertainty sources in data and models.
基金Project(51465034)supported by the National Natural Science Foundation of China
文摘Based on the log-linear virtual age process, an imperfect preventive maintenance policy for numerical control(NC)machine tools with random maintenance quality is proposed. The proposed model is a combination of the Kijima type virtual age model and the failure intensity adjustment model. Maintenance intervals of the proposed hybrid model are derived when the failure intensity increase factor and the restoration factor are both random variables with uniform distribution. The optimal maintenance policy in infinite time horizon is presented. A numerical example is given when the failures of NC machine tools are described by the log-linear process. Finally, a discussion is presented to show how the optimal results depend on the different cost parameters.
文摘A finite-rate method is used to simulate the three-dimensional combustion process in a plasma generator with CH4 as the fuel. The simulation was run with RNG k-ε model to simulate turbulence, with eddy-dissipation-concept (EDC) model to simulate the combustion and with discrete ordinates model to simulate radiation. The numerical results show that the flow field characteristics and the parameter distributions are under the condition of rich fuels, and these results provide valuable information when optimizing the plasma generator design and organizing its flow fields.
基金National Natural Science Foundation of China(No.60574054No.70771065No.70671065)
文摘Most warranty cost models based on preventive maintenance operations are assumed that products improve at each preventive maintenance (PM) operation and the failure rate is reduced to the failure rate of new products or to some specified level. To make warranty cost models more suitable to real operations, a modeling method of the PM warranty cost was proposed with the situation where each PM operation slowed the rate of product degradation. A warranty cost model was built on PM operations. On the basis of the cost model, both without and with reliability limit PM warranty policy, algorithms were presented to derive the optimal PM number and the optimal PM interval with an objective of minimizing expected total warranty cost over a t'mite warranty period. Finally, to demonstrate the feasibility of the presented modeling method, Weibuil distribution cases were tested by numerical simulations. The simulation results indicate that the proposed modeling method is feasible and valid for resolving the optimal solution of the product warranty cost.
基金Supported by the National Natural Science Foundation of China under Grant No.60774036
文摘The authors developed a prototype of a warship maintenance system. The process started by defining the maintenance requirements of warship equipment. Next, a planning scheme was development for a maintenance network. An optimization target for the plan and indexes for assessment were established. Based on the above work, a simulation model was proposed with two layers: a base and a workshop. Dispatching rules were then formulated for the simulation. Experimental results proved the validity of the model and the dispatching algorithm. It was found that the model can solve the capacity evaluation problem for maintenance systems and provides a scientific basis for decision-maker to make decisions regarding equipment maintenance.
文摘Based on the theory of reliability, this paper studies the preventive maintenance strategy of the simulator with incomplete maintenance, and establishes the preventive maintenance model with the aim of simulating the maintenance cost and simulating machine availability. The main contents of this paper are as follows: Firstly, this paper introduces the background and significance of this paper, expatiates the relevant concepts and mathematical foundation of simulator maintenance related theory and reliability maintenance thought, simulator performance degradation law, Weibull parameter estimation method, As the center of the maintenance (RCM) theory of system maintenance decision analysis.
基金The National Key Research and Development Program of China(No.2018YFB1601202)the Natural Science Foundation of Shaanxi Province(No.2019JM-228)+1 种基金the National Natural Science Foundation of China(No.51308335)the Fundamental Research Funds for the Central Universities of Chang’an University(No.300102218401)
文摘This paper presents the theory,method,and application of performance-based pavement needs assessment at a state level,using the Pennsylvania Interstate System as an example.First,a general framework is presented for the pavement asset management and a general optimization model is established for the pavement maintenance and rehabilitation needs assessment.Also,the bundling of pavement segments for the project implementation is discussed.Using the examples of Statewide Transportation Improvement Plan and Long Range Transportation Plan for Pennsylvania Interstate System,the application of performance-based pavement needs assessment is demonstrated.It is shown that unconstrained analysis can help decision-makers investigate the real maintenance and rehabilitation needs;financially-constrained analysis can help decision-makers select projects for implementation and examine the corresponding future pavement conditions.Trade-off analysis can help decision-makers investigate the outcomes of different investment levels on pavement maintenance and rehabilitation and make the final decision on the investment level.The proposed case study provides a good example of performance-based pavement needs assessment for developing countries.
基金Under the auspices of Water Pollution Control and Management Key Project of Science and Technology of China(No.2013ZX07202-007)Liaoning Hundred-Thousand-Ten Thousand Talents Program
文摘Rivers in the Liaohe River Estuary area have been seriously polluted by discharges of wastewater containing petroleum pol- lutants and nutrients. In this paper, The Enhanced Stream Water Quality Model (QUAL2K) and its revised model as well as One-dimensional Tide Mean Model (1D model) were applied to predict and assess the water quality of the tidal fiver reach of the Liaohe River Estuary. Dissolved oxygen (DO), biochemical oxygen demand (BODs), ammonia nitrogen (NH3-N) and total phosphorus (TP) were chosen as water quality indices in the two model simulations. The modelled results show that the major reasons for degraded rivers remain petroleum and non-point source pollution. Tidal water also has a critical effect on the variation of water quality. The sensitivity analysis identifies that flow rate, point load and diffuse load are the most sensitive parameters for the four water quality indices in the revised QUAL2K simulation. Uncertainty analysis based on a Monte Carlo simulation gives the probability distribution of the four wa- ter quality indices at two locations (6.50 km and 44.84 km from the river mouth). The statistical outcomes indicate that the observed data fall within the 90% confidence intervals at all sites measured, and show that the revised QUAL2K gives better results in simulating the water quality of a tidal fiver.