期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
基于大比例再生沥青混合料路用性能的试验研究
1
作者 刘秘强 《石油沥青》 2017年第6期10-13,47,共5页
为了研究大比例再生实体工程中热拌及温拌再生沥青混合料路用性能,针对RAP不同掺配比例(30%和50%)下再生沥青混合料,采用车辙试验、冻融劈裂试验和弯曲试验,研究聚酯纤维对热拌及温拌大比例再生沥青混合料路用性能的作用效果,并对比分... 为了研究大比例再生实体工程中热拌及温拌再生沥青混合料路用性能,针对RAP不同掺配比例(30%和50%)下再生沥青混合料,采用车辙试验、冻融劈裂试验和弯曲试验,研究聚酯纤维对热拌及温拌大比例再生沥青混合料路用性能的作用效果,并对比分析了热拌及温拌施工工艺对混合料路用性能的影响。试验结果表明:聚酯纤维能够综合改善热拌及温拌大比例再生沥青混合料高温稳定性、水稳定性和低温抗裂性;温拌再生沥青混合料水稳定性和低温抗裂性优于热拌再生,但高温稳定性逊于热拌再生。 展开更多
关键词 工程 大比例再生沥青混合料 施工工艺 聚酯纤 维路用性能
下载PDF
Cost-benefit timing for applying slurry seal on actual roadway tests in China 被引量:3
2
作者 支喜兰 王威娜 蔡宜长 《Journal of Central South University》 SCIE EI CAS 2012年第8期2394-2402,共9页
Determining the optimal timing is the core of preventive maintenance. Highway agencies always face with the challenge of determining optimal timing for preventive maintenance, particularly in China where there are no ... Determining the optimal timing is the core of preventive maintenance. Highway agencies always face with the challenge of determining optimal timing for preventive maintenance, particularly in China where there are no condition indicators designed for determining adequate timing for applying preventive maintenance and little literature relating to the development of pavement performance. This work presented the indicators, including crack ratio (Rc), rutting depth (DR), international roughness index (IIR) and sideway force coefficient (CsF) to determine the adequate timing for preventive maintenance in China. The proper ranges of each indicator to apply to preventive maintenance were then recommended. They are 0.28%-1.4% for Rc, 10-15 mm for DR, 1.97-3.5 for lrR, 40--50 for CSF. Based on pavement condition survey data collected on the test roads in Hebei Province, China, on the application of slurry seal at different timings, the pavement performance was established and the adequate timings for applying slurry seal was studied. Based on benefit-cost analysis, it is suggested that the fourth year is the optimal timing for applying slurry seal based on the condition in China. A framework is established to determine the adequate timings of applying other preventive maintenance methods. 展开更多
关键词 preventive maintenance evaluation system cost-benefit timing slurry seal
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部