期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
三峡库区航道深水浮标受力及缆索长度计算探讨 被引量:6
1
作者 杨斌 《水运工程》 北大核心 2004年第9期39-43,共5页
三峡成库后,由于船舶(队)安全航行的需要,个别深水航段(如桥区水域、孤浅礁石水域、陡岸水域等)须设置浮标,最大设标水深可达100余米以上,从而使浮标受力及系留浮标的缆索长度大大增加,给设标工作带来了较大的困难。文章力图通过对浮标... 三峡成库后,由于船舶(队)安全航行的需要,个别深水航段(如桥区水域、孤浅礁石水域、陡岸水域等)须设置浮标,最大设标水深可达100余米以上,从而使浮标受力及系留浮标的缆索长度大大增加,给设标工作带来了较大的困难。文章力图通过对浮标的受力分析和计算,进而得到深水航段系留浮标所需的缆索长度,以便为三峡库区深水浮标的设置提供科学的依据。 展开更多
关键词 三峡库区 深水浮标 缆索长度
下载PDF
浮标水下锚定用缆索的长度与受力关系 被引量:1
2
作者 吴家喜 《声学与电子工程》 2006年第B07期108-110,共3页
通过对浮标水下锚定用缆索的受力状况进行分析,在理论上推导出锚定用缆索在水下的曲线方程,举例演算探索浮标水下锚定用缆索的长度与受力的关系,并对锚定用缆索实际布放存在的问题提出了相应的解决方法。
关键词 锚定浮标 缆索长度 缆索受力
下载PDF
Deployment simulation of cable-strut structures considering cable sliding 被引量:2
3
作者 CAI JianGuo FENG Jian WANG Kai 《Science China(Technological Sciences)》 SCIE EI CAS 2012年第12期3263-3269,共7页
The influence of cable sliding on the deployment of foldable cable-strut structures was studied in this paper. In order to develop an effective program for the cable sliding program, two-node cable element based on th... The influence of cable sliding on the deployment of foldable cable-strut structures was studied in this paper. In order to develop an effective program for the cable sliding program, two-node cable element based on the analytical solution of elastic cate- nary was studied. Then the cable sliding stiffness was defined as the ratio of the variation of the cable force to the variation of the cable length. To validate the proposed numerical method, analyses of two examples given in references were carried out. The results show that the method given in this paper is accurate and effective, which can be used to model the cable sliding in cable structures. Finally, the deployment process of a foldable cable-strut structure, which is composed of four-bar linkages and cables, was discussed. It can be found that the effect of cable sliding on the behavior of cable-strut structures is significant. The length changes of active cables are smaller when the cable sliding is considered. Moreover, the nodal coordinate changes also become faster when the numerical model is with cable sliding. 展开更多
关键词 DEPLOYMENT elastic catenary cable-strut structures cable sliding nonlinear analysis
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部