期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
证券营业场所风险浅析
1
作者 陈巍 《上海保险》 北大核心 2002年第1期42-44,共3页
证券业随着上海交易所的一声锣响,在我国已经 有十多年的发展历史,从整体看我国的证券业发展保持着三高的发展势头,即高速度、高起点、高科技,同时也隐含着高风险。
关键词 证券业 中国 营业场所风险 火灾风险 水渍风险 意外事故 违规风险 网络传输风险
下载PDF
Determination of Weak Points Based on Risk Theory and Application to Transmission Network Planning 被引量:1
2
作者 LIU Zhe JIA Hongjie +1 位作者 ZENG Yuan QIN Chao 《Transactions of Tianjin University》 EI CAS 2012年第1期38-45,共8页
In the traditional power transmission network planning,deterministic analysis methods are widely used.In such methods,all contingencies are deemed to have the same occurrence probability,which is not reasonable.In thi... In the traditional power transmission network planning,deterministic analysis methods are widely used.In such methods,all contingencies are deemed to have the same occurrence probability,which is not reasonable.In this paper,risk assessment is introduced to the process of transmission network planning considering the probabilistic characteristics of contingencies.Risk indices are given to determine the weak points of the transmission network based on local information,such as bus risk,line overload risk,contingency severity.The indices are calculated by the optimal cost control method based on risk theory,which can help planners to quickly determine weak points in the planning and find solution to them.For simplification,only line overload violation is considered.Finally,the proposed method is validated by an IEEE-RTS test system and a real power system in China from two aspects.In the first case,the original system is evaluated by the proposed method to find the weak points,and then four planning schemes are established,among which the best scheme is selected.In the second case,four initial planning schemes are established by combining the experiences of planners,and after the evaluation by using the proposed method,the best planning scheme is improved based on the information of weak points in the initial schemes,and the risk of improved scheme is reduced from 42 531.86 MW·h per year to 4 431.26 MW·h per year. 展开更多
关键词 risk assessment weak point transmission network planning risk theory
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部