The importance and complexity of prioritizing construction projects (PCP) in urban road network planning lead to the necessity to develop an aided decision making program (ADMP). Cost benefit ratio model and stage rol...The importance and complexity of prioritizing construction projects (PCP) in urban road network planning lead to the necessity to develop an aided decision making program (ADMP). Cost benefit ratio model and stage rolled method are chosen as the theoretical foundations of the program, and then benefit model is improved to accord with the actuality of urban traffic in China. Consequently, program flows, module functions and data structures are designed, and particularly an original data structure of road ...展开更多
The problem of path planning is studied for t he case for a mobile robot moving in a known environment. An aggressive algorith m using a description of the obstacles based on a neural network is proposed. Th e algorit...The problem of path planning is studied for t he case for a mobile robot moving in a known environment. An aggressive algorith m using a description of the obstacles based on a neural network is proposed. Th e algorithm allows to construct an optimal path which is piecewise linear with c hanging directions of the obstacles and the calculation speed for the proposed a lgorithm is comparatively fast. Simulation results and an application to a car_l ike robot 'Khepera' show the effectiveness of the proposed algorithm.展开更多
In order to diminish the impacts of extemal disturbance such as parking speed fluctuation and model un- certainty existing in steering kinematics, this paper presents a parallel path tracking method for vehicle based ...In order to diminish the impacts of extemal disturbance such as parking speed fluctuation and model un- certainty existing in steering kinematics, this paper presents a parallel path tracking method for vehicle based on pre- view back propagation (BP) neural network PID controller. The forward BP neural network can adjust the parameters of PID controller in real time. The preview time is optimized by considering path curvature, change in curvature and road boundaries. A fuzzy controller considering barriers and different road conditions is built to select the starting po- sition. In addition, a kind of path planning technology satisfying the requirement of obstacle avoidance is introduced. In order to solve the problem of discontinuous curvature, cubic B spline curve is used for curve fitting. The simulation results and real vehicle tests validate the effectiveness of the proposed path planning and tracking methods.展开更多
In order to form an algorithm for distribution network routing,an automatic routing method of distribution network planning was proposed based on the shortest path.The problem of automatic routing was divided into two...In order to form an algorithm for distribution network routing,an automatic routing method of distribution network planning was proposed based on the shortest path.The problem of automatic routing was divided into two steps in the method:the first step was that the shortest paths along streets between substation and load points were found by the basic ant colony algorithm to form a preliminary radial distribution network,and the second step was that the result of the shortest path was used to initialize pheromone concentration and pheromone updating rules to generate globally optimal distribution network.Cases studies show that the proposed method is effective and can meet the planning requirements.It is verified that the proposed method has better solution and utility than planning method based on the ant colony algorithm.展开更多
A theoretical study was conducted on finding optimal paths in transportation networks where link travel times were stochastic and time-dependent(STD). The methodology of relative robust optimization was applied as mea...A theoretical study was conducted on finding optimal paths in transportation networks where link travel times were stochastic and time-dependent(STD). The methodology of relative robust optimization was applied as measures for comparing time-varying, random path travel times for a priori optimization. In accordance with the situation in real world, a stochastic consistent condition was provided for the STD networks and under this condition, a mathematical proof was given that the STD robust optimal path problem can be simplified into a minimum problem in specific time-dependent networks. A label setting algorithm was designed and tested to find travelers' robust optimal path in a sampled STD network with computation complexity of O(n2+n·m). The validity of the robust approach and the designed algorithm were confirmed in the computational tests. Compared with conventional probability approach, the proposed approach is simple and efficient, and also has a good application prospect in navigation system.展开更多
Air route network is the carrier of air traffic flow,and traffic assignment is a method to verify the rationality of air route network structure.Therefore,air route network generation based on traffic assignment has b...Air route network is the carrier of air traffic flow,and traffic assignment is a method to verify the rationality of air route network structure.Therefore,air route network generation based on traffic assignment has been becoming the research focus of airspace programming technology.Based on link prediction technology and optimization theory,a bi-level programming model is established in the paper.The model includes an upper level of air route network generation model and a lower level of traffic assignment model.The air route network structure generation incorporates network topology generation algorithm based on link prediction technology and optimal path search algorithm based on preference,and the traffic assignment adopts NSGA-Ⅲalgorithm.Based on the Python platform NetworkX complex network analysis library,a network of 57 airports,383 nodes,and 635 segments within China Airspace Beijing and Shanghai Flight Information Regions and 187975 sorties of traffic are used to simulate the bilevel model.Compared with the existing air route network,the proposed air route network can decrease the cost by 50.624%,lower the flight conflict coefficient by 33.564%,and reduce dynamic non-linear coefficient by 7.830%.展开更多
In this paper the basic situation of the Northwest Region in China is introduced, the necessity for the Northwest Power Grid to develop 750 kV transmission line is analyzed, and the target for the power grid construct...In this paper the basic situation of the Northwest Region in China is introduced, the necessity for the Northwest Power Grid to develop 750 kV transmission line is analyzed, and the target for the power grid construction till 2010 as well as the planning for sending power from west to east and interconnection with adjacent grids are described.展开更多
文摘The importance and complexity of prioritizing construction projects (PCP) in urban road network planning lead to the necessity to develop an aided decision making program (ADMP). Cost benefit ratio model and stage rolled method are chosen as the theoretical foundations of the program, and then benefit model is improved to accord with the actuality of urban traffic in China. Consequently, program flows, module functions and data structures are designed, and particularly an original data structure of road ...
文摘The problem of path planning is studied for t he case for a mobile robot moving in a known environment. An aggressive algorith m using a description of the obstacles based on a neural network is proposed. Th e algorithm allows to construct an optimal path which is piecewise linear with c hanging directions of the obstacles and the calculation speed for the proposed a lgorithm is comparatively fast. Simulation results and an application to a car_l ike robot 'Khepera' show the effectiveness of the proposed algorithm.
基金Supported by the National Natural Science Foundation of China(No.11072106,No.51005133 and No.51375009)
文摘In order to diminish the impacts of extemal disturbance such as parking speed fluctuation and model un- certainty existing in steering kinematics, this paper presents a parallel path tracking method for vehicle based on pre- view back propagation (BP) neural network PID controller. The forward BP neural network can adjust the parameters of PID controller in real time. The preview time is optimized by considering path curvature, change in curvature and road boundaries. A fuzzy controller considering barriers and different road conditions is built to select the starting po- sition. In addition, a kind of path planning technology satisfying the requirement of obstacle avoidance is introduced. In order to solve the problem of discontinuous curvature, cubic B spline curve is used for curve fitting. The simulation results and real vehicle tests validate the effectiveness of the proposed path planning and tracking methods.
基金Project(2009CB219703) supported by the National Basic Research Program of ChinaProject(2011AA05A117) supported by the National High Technology Research and Development Program of China
文摘In order to form an algorithm for distribution network routing,an automatic routing method of distribution network planning was proposed based on the shortest path.The problem of automatic routing was divided into two steps in the method:the first step was that the shortest paths along streets between substation and load points were found by the basic ant colony algorithm to form a preliminary radial distribution network,and the second step was that the result of the shortest path was used to initialize pheromone concentration and pheromone updating rules to generate globally optimal distribution network.Cases studies show that the proposed method is effective and can meet the planning requirements.It is verified that the proposed method has better solution and utility than planning method based on the ant colony algorithm.
基金Project(71001079)supported by the National Natural Science Foundation of China
文摘A theoretical study was conducted on finding optimal paths in transportation networks where link travel times were stochastic and time-dependent(STD). The methodology of relative robust optimization was applied as measures for comparing time-varying, random path travel times for a priori optimization. In accordance with the situation in real world, a stochastic consistent condition was provided for the STD networks and under this condition, a mathematical proof was given that the STD robust optimal path problem can be simplified into a minimum problem in specific time-dependent networks. A label setting algorithm was designed and tested to find travelers' robust optimal path in a sampled STD network with computation complexity of O(n2+n·m). The validity of the robust approach and the designed algorithm were confirmed in the computational tests. Compared with conventional probability approach, the proposed approach is simple and efficient, and also has a good application prospect in navigation system.
文摘Air route network is the carrier of air traffic flow,and traffic assignment is a method to verify the rationality of air route network structure.Therefore,air route network generation based on traffic assignment has been becoming the research focus of airspace programming technology.Based on link prediction technology and optimization theory,a bi-level programming model is established in the paper.The model includes an upper level of air route network generation model and a lower level of traffic assignment model.The air route network structure generation incorporates network topology generation algorithm based on link prediction technology and optimal path search algorithm based on preference,and the traffic assignment adopts NSGA-Ⅲalgorithm.Based on the Python platform NetworkX complex network analysis library,a network of 57 airports,383 nodes,and 635 segments within China Airspace Beijing and Shanghai Flight Information Regions and 187975 sorties of traffic are used to simulate the bilevel model.Compared with the existing air route network,the proposed air route network can decrease the cost by 50.624%,lower the flight conflict coefficient by 33.564%,and reduce dynamic non-linear coefficient by 7.830%.
文摘In this paper the basic situation of the Northwest Region in China is introduced, the necessity for the Northwest Power Grid to develop 750 kV transmission line is analyzed, and the target for the power grid construction till 2010 as well as the planning for sending power from west to east and interconnection with adjacent grids are described.